{"id":23082,"date":"2026-09-26T11:43:58","date_gmt":"2026-09-26T11:43:58","guid":{"rendered":"https:\/\/www.examlabs.com\/certification\/?p=23082"},"modified":"2026-09-26T11:43:58","modified_gmt":"2026-09-26T11:43:58","slug":"nadca-ascs-practice-test-questions-and-exam-dumps-part2-q21-40","status":"publish","type":"post","link":"https:\/\/www.examlabs.com\/certification\/nadca-ascs-practice-test-questions-and-exam-dumps-part2-q21-40\/","title":{"rendered":"NADCA ASCS Practice Test Questions and Exam Dumps Part2 Q21-40"},"content":{"rendered":"<p><b>View Full <\/b><a href=\"https:\/\/www.examlabs.com\/ascs-exam-dumps\"><b>NADCA ASCS Exam Dumps<\/b><\/a><b> and Practice Test Dumps.<\/b><\/p>\n<p><b><br \/>\n<\/b><b>Question 21. What must a service opening preserve in an HVAC system<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> Building paint color<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Refrigerant temperature<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Structural thermal and functional integrity<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Outdoor humidity<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 3. Structural thermal and functional integrity<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">A service opening created for HVAC assessment, cleaning, or restoration must not weaken or otherwise damage the system. NADCA requirements state that service openings should preserve the structural, thermal, and functional integrity of the duct system. The opening must also allow proper closure after work is completed and should not negatively affect airflow. Correct access construction is important because improperly created openings can create leakage, structural weakness, insulation problems, or airflow changes. Technicians should therefore use appropriate materials and methods that comply with applicable industry standards and local requirements.<\/span><\/p>\n<p><b>Question 22. What filtration is required when vacuum equipment exhausts indoors<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> HEPA filtration<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Carbon only filtration<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> No filtration<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Water filtration only<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 1. HEPA filtration<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">When vacuum collection equipment exhausts air inside the building, NADCA requires that the equipment use HEPA filtration and be capable of retaining debris removed from the HVAC system. Cleaning activities can release very small particles into the collection air stream, so suitable filtration is necessary before that air returns to the indoor environment. The goal is to prevent contamination removed from the HVAC system from being redistributed into occupied areas. Appropriate filtration works together with negative duct pressure and containment to protect occupants and surrounding spaces during cleaning operations.<\/span><\/p>\n<p><b>Question 23. Where should non HEPA negative air equipment normally exhaust<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> Into the return duct<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Into the occupied room<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Into the supply plenum<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Outdoors<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 4. Outdoors<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">NADCA requires equipment used to create negative duct pressure that does not have HEPA filtration to exhaust outdoors. This prevents contaminated collection air from being discharged into the occupied indoor environment. Exhaust placement should also be considered carefully so discharged material does not reenter the building through doors, windows, or outdoor air intakes. The objective is to maintain contaminant control while the HVAC system is being cleaned. Proper exhaust management is an important engineering control and should be included in project planning before cleaning activities begin.<\/span><\/p>\n<p><b>Question 24. How should a service opening affect normal duct airflow<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> Increase it permanently<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> It should not restrict or alter it<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Reverse it<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Stop it completely<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 2. It should not restrict or alter it<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">A properly installed service opening should allow technicians to access the duct while preserving normal HVAC performance after the work is finished. NADCA states that service openings should not hinder, restrict, or alter airflow within the air duct. Poorly designed access panels, projections, or improper closures can create turbulence, leakage, pressure changes, or unnecessary resistance. Technicians should therefore consider both cleaning access and system operation when creating openings. After cleaning is complete, the opening should be properly closed using suitable materials and methods so the system can continue operating as intended.<\/span><\/p>\n<p><b>Question 25. What gauge should a service panel generally use<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> Equivalent or heavier than the duct<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Always thinner than the duct<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Plastic only<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Any available material<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 1. Equivalent or heavier than the duct<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">NADCA states that service panels used to close openings should be made from material of an equivalent gauge or heavier so the structural integrity of the duct is not compromised. A panel that is too light may flex, leak, vibrate, or fail to provide a durable closure. The service panel becomes part of the duct system after installation, so its construction should be suitable for the operating conditions. Proper closure also supports future access while maintaining airflow, structural strength, and system integrity after the cleaning project is finished.<\/span><\/p>\n<p><b>Question 26. What is the maximum recommended spacing for service panel fasteners<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> Twelve inches<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Eight inches<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Four inches<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Twenty four inches<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 3. Four inches<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">NADCA specifies that service panels used to close service openings should be mechanically fastened with screws or rivets at a minimum of every four inches on center. Proper fastening helps create a secure and durable closure and reduces the possibility of panel movement or air leakage. The panel should also overlap the surrounding duct surface sufficiently. Access openings are necessary on many cleaning projects, but their installation and closure must not reduce the integrity of the HVAC system. Technicians should follow applicable standards and local requirements whenever permanent access is created.<\/span><\/p>\n<p><b>Question 27. How far should a service panel overlap the duct surface<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> Four inches<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> At least one inch<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Six inches<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> No overlap is required<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 2. At least one inch<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">According to NADCA requirements, a service panel used to close an access opening should overlap the ductwork surface by at least one inch on all sides. The overlap provides sufficient surface area for mechanical fastening and sealing. This helps maintain structural integrity and reduces air leakage after cleaning. The panel should also be of an equivalent gauge or heavier than the duct and should be properly secured with appropriate fasteners. Good access closure practices are important because a cleaning project should restore the HVAC system without creating new operational or structural problems.<\/span><\/p>\n<p><b>Question 28. Which requirement applies to tape used for service opening closure<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> It must be decorative<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> It must be transparent<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> It must be cloth backed only<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> It must meet applicable UL requirements<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 4. It must meet applicable UL requirements<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">NADCA specifies that tapes used in the installation and closure of service openings must meet the applicable UL requirements identified for duct closure materials. This requirement helps ensure that the material is appropriate for HVAC use rather than relying on ordinary household tape that may fail under system conditions. Proper access closure should also comply with applicable SMACNA, NFPA, and local code requirements. The objective is to create a safe, durable, and professional closure that maintains system integrity after assessment, cleaning, or restoration work is completed.<\/span><\/p>\n<p><b>Question 29. What cleaning method is recommended for many nonporous AHU surfaces<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> Dry sweeping only<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Painting<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Wet cleaning with mechanical methods<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Increasing airflow only<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 3. Wet cleaning with mechanical methods<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">NADCA recommends that air handling coils, fans, condensate pans, drains, and similar nonporous surfaces be wet cleaned in conjunction with appropriate mechanical methods. Wet cleaning can help remove adhered contamination that may not be effectively removed by dry methods alone. The process must be controlled carefully so water and debris do not damage electrical components, surrounding equipment, insulation, or building materials. Water collection and disposal also need to comply with applicable requirements. The cleaning technique should always be selected according to the component material and contamination involved.<\/span><\/p>\n<p><b>Question 30. What must be controlled during wet cleaning<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> Customer billing<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Water and debris extraction<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Outdoor wind direction only<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Filter manufacturing<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 2. Water and debris extraction<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Wet cleaning can release contaminated water and debris inside an air handling unit, so proper extraction and containment are essential. NADCA requires sufficient control to collect debris and prevent water damage to HVAC components, nearby equipment, and the surrounding structure. Technicians should plan how water will be captured before beginning the cleaning process. Electrical equipment and moisture sensitive materials require particular care. Wet cleaning should improve component cleanliness without creating secondary damage, standing water, or contamination in another part of the system or building.<\/span><\/p>\n<p><b>Question 31. How should wastewater from HVAC wet cleaning be handled<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> According to applicable regulations<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Discharged anywhere outdoors<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Returned to the supply duct<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Left inside the condensate pan<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 1. According to applicable regulations<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Wastewater created during HVAC wet cleaning must be captured, contained, tested when required, and disposed of according to applicable local, regional, state, and federal regulations. Cleaning wastewater can contain dust, biological material, chemical residues, or other contaminants removed from HVAC surfaces. It should not simply be released wherever convenient. Proper wastewater management protects the building, workers, occupants, and the environment. The project plan should account for wastewater before wet cleaning begins so technicians have appropriate collection and disposal procedures available at the job site.<\/span><\/p>\n<p><b>Question 32. What must air duct cleaning remove<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> Structural supports<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Access panels<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Duct insulation<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Nonadhered substances and contamination<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 4. Nonadhered substances and contamination<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">NADCA requires air ducts to be cleaned so nonadhered substances, particulate matter, debris, and surface contamination are removed to the required cleanliness level. The duct should be capable of passing the specified cleanliness verification process after cleaning. Mechanical agitation is commonly used to loosen contamination while vacuum collection captures the material. Cleaning should address accessible duct surfaces throughout the defined project scope rather than merely cleaning areas visible from registers. The objective is a verified cleanliness result that demonstrates contaminants were actually removed from the system.<\/span><\/p>\n<p><b>Question 33. What should determine the size of an air duct service opening<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> Wall paint color<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Size needed for cleaning and verification<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Building occupancy only<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Outdoor temperature<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 2. Size needed for cleaning and verification<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Service openings should be large enough to accommodate the mechanical cleaning procedures required for the duct and to allow cleanliness verification after work is completed. An opening that is too small can prevent tools from contacting or reaching necessary surfaces and can make proper post cleaning inspection difficult. NADCA requires air ducts to be accessed through service openings suitable for the procedures being performed. Access planning should consider duct construction, tool dimensions, contamination, safety, and the ability to close the opening correctly when work is finished.<\/span><\/p>\n<p><b>Question 34. What does mechanical agitation do during duct cleaning<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> Changes refrigerant pressure<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Adds insulation<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Increases humidity<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Dislodges particulate and surface contamination<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 4. Dislodges particulate and surface contamination<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Mechanical agitation is used to loosen dust, debris, and surface contamination so collection equipment can remove the material from the HVAC system. NADCA identifies tools such as brushes, air whips, compressed air nozzles, and similar devices as possible agitation methods. The appropriate method depends on the duct construction, condition, accessibility, and type of contamination. Agitation should be performed while suitable negative pressure and collection controls are operating so loosened material moves toward the collection equipment rather than escaping into occupied areas.<\/span><\/p>\n<p><b>Question 35. What is the purpose of the Surface Comparison Test<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> Measure refrigerant pressure<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Determine motor speed<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Verify surface cleanliness<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Test electrical voltage<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 3. Verify surface cleanliness<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The Surface Comparison Test is one of the cleanliness verification methods recognized in the current NADCA ACR Standard. It is used after cleaning to evaluate whether an HVAC surface has reached the required cleanliness condition. Verification is important because completing the cleaning process does not automatically prove that the desired result was achieved. NADCA&#8217;s 2025 ACR Standard specifically includes cleanliness verification methods such as the Surface Comparison Test and NADCA Vacuum Test. Post cleaning verification provides a more objective basis for determining whether additional cleaning is required.<\/span><\/p>\n<p><b>Question 36. What is the NADCA Vacuum Test used to evaluate<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> Surface cleanliness<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Compressor capacity<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Refrigerant leakage<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Thermostat accuracy<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 1. Surface cleanliness<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The NADCA Vacuum Test is a recognized cleanliness verification method used to evaluate HVAC surface cleanliness after cleaning. It provides a method for assessing residual particulate material rather than relying only on a casual visual observation. NADCA&#8217;s current ACR Standard includes both the Surface Comparison Test and NADCA Vacuum Test among its verification procedures. Cleanliness verification is important because the goal of HVAC cleaning is not merely to perform mechanical activity but to achieve a defined result. If the component does not meet the required cleanliness level, additional cleaning may be necessary.<\/span><\/p>\n<p><b>Question 37. What is the minimum general cleanliness goal identified by NADCA<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> Visibly clean<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Completely sterile<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Newly painted<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Chemically coated<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 4. Visibly clean<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">NADCA states that cleaning and restoration procedures should achieve at least the visibly clean level unless the contractual documents specify another cleanliness verification requirement. Visibly clean means that contamination should not remain visible on the cleaned components when evaluated using the appropriate method. Some projects may require additional testing or a more specific verification procedure. The important principle is that cleaning should achieve a documented result rather than simply involve a certain amount of time or equipment use. Verification helps demonstrate that the defined project scope has been successfully completed.<\/span><\/p>\n<p><b>Question 38. Which benefit can result from cleaning a contaminated HVAC system<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> Larger duct dimensions<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Improved system efficiency<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Higher outdoor humidity<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Reduced building size<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 1. Improved system efficiency<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The current ASCS exam content outline includes energy savings and increased HVAC system lifespan among the potential benefits associated with appropriate HVAC system cleaning. Contamination on coils, fans, and other components can interfere with normal airflow and heat transfer, causing equipment to work harder than intended. Removing significant contamination can help restore system performance when dirt is contributing to reduced efficiency. Technicians should still manage customer expectations because cleaning cannot correct unrelated mechanical or design deficiencies. The benefits depend on actual system conditions and the quality of the cleaning performed.<\/span><\/p>\n<p><b>Question 39. What should a comprehensive scope of work include<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> Only customer payment terms<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Safety plans methods and project requirements<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Employee vacation schedules<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> Building decoration plans<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 2. Safety plans methods and project requirements<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">A comprehensive scope of work should clearly define what components are included, which cleaning or restoration methods will be used, what equipment and products are required, and how safety and engineering controls will be managed. The current NADCA ACR Standard emphasizes development of a scope that includes safety plans, project scheduling, and coordination where necessary. A clear scope helps the contractor and customer understand expectations before work begins. It also reduces disputes and supports consistent project execution by establishing what work must be completed and how successful results will be evaluated.<\/span><\/p>\n<p><b>Question 40. Why must an ASCS understand several industry standards<\/b><\/p>\n<ol>\n<li><b><\/b><span style=\"font-weight: 400;\"> To replace all local regulations<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> To avoid HVAC inspections<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> To apply recognized practices across different conditions<\/span><\/li>\n<li><b><\/b><span style=\"font-weight: 400;\"> To eliminate safety planning<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 3. To apply recognized practices across different conditions<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The ASCS exam content outline expects familiarity not only with ACR, The NADCA Standard, but also with relevant standards and guidelines from organizations such as SMACNA, NAIMA, ASHRAE, IICRC, NFPA, and ACCA. HVAC cleaning projects can involve duct construction, insulation, fire safety, indoor environmental conditions, restoration, and mechanical considerations that cross several professional areas. Understanding recognized industry guidance helps technicians make appropriate decisions while also recognizing when another qualified professional should become involved. Applicable laws and local codes still take precedence where required.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>View Full NADCA ASCS Exam Dumps and Practice Test Dumps. Question 21. What must a service opening preserve in an HVAC system Building paint color Refrigerant temperature Structural thermal and functional integrity Outdoor humidity Correct Answer: 3. Structural thermal and functional integrity Explanation: A service opening created for HVAC assessment, cleaning, or restoration must not [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[1648,1647],"tags":[],"_links":{"self":[{"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/posts\/23082"}],"collection":[{"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/comments?post=23082"}],"version-history":[{"count":1,"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/posts\/23082\/revisions"}],"predecessor-version":[{"id":23083,"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/posts\/23082\/revisions\/23083"}],"wp:attachment":[{"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/media?parent=23082"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/categories?post=23082"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/tags?post=23082"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}