{"id":24446,"date":"2026-09-29T07:47:06","date_gmt":"2026-09-29T07:47:06","guid":{"rendered":"https:\/\/www.examlabs.com\/certification\/?p=24446"},"modified":"2026-09-29T07:47:06","modified_gmt":"2026-09-29T07:47:06","slug":"pure-storage-flasharray-implementation-specialist-practice-test-questions-and-exam-dumps-part20-q381-400","status":"publish","type":"post","link":"https:\/\/www.examlabs.com\/certification\/pure-storage-flasharray-implementation-specialist-practice-test-questions-and-exam-dumps-part20-q381-400\/","title":{"rendered":"Pure Storage FlashArray Implementation Specialist Practice Test Questions and Exam Dumps Part20 Q381-400"},"content":{"rendered":"<h2><b>View Full <\/b><a href=\"https:\/\/www.examlabs.com\/flasharray-implementation-specialist-exam-dumps\"><b>Pure Storage FlashArray Implementation Specialist Exam Dumps<\/b><\/a><b> and Practice Test Dumps<\/b><\/h2>\n<p>&nbsp;<\/p>\n<h3><b>Question 381.<\/b><\/h3>\n<p><b>Which script is useful for checking the installed FlashArray hardware?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">hardware_check<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">volume_scan<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">host_report<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">fabric_test<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 1<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The <\/span><span style=\"font-weight: 400;\">hardware_check<\/span><span style=\"font-weight: 400;\"> script is intended to help verify the physical hardware state of a FlashArray after installation or maintenance. It can provide useful confirmation that installed components are recognized and operating as expected. This type of validation is particularly valuable before completing an implementation because physical component problems can affect later configuration and customer acceptance. The implementation specialist should review the script results together with the planned configuration and hardware inventory. Any unexpected component condition should be investigated and documented before the system is considered fully validated.<\/span><\/p>\n<h3><b>Question 382.<\/b><\/h3>\n<p><b>What is the primary purpose of an installation checklist during closure?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Estimate future capacity<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Confirm completed tasks<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Design replication schedules<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Select host operating systems<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 2<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">An installation checklist provides a structured way to confirm that required implementation activities have been completed. It can cover physical installation, connectivity, configuration, validation, documentation, and customer confirmation. During closure, the checklist helps the implementation specialist compare the expected work against what was actually performed. This reduces the chance that a required activity or validation step is overlooked. It also provides useful evidence for the final implementation record. The checklist is therefore a completion and verification tool rather than a mechanism for designing unrelated storage or host configurations.<\/span><\/p>\n<h3><b>Question 383.<\/b><\/h3>\n<p><b>Which command is useful for reviewing drive information before final validation?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">purevol list<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">purehost list<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">puredrive list<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">purepod list<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 3<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The <\/span><span style=\"font-weight: 400;\">puredrive list<\/span><span style=\"font-weight: 400;\"> command can be used to review drive-related information on a FlashArray. During implementation validation, drive information can help confirm that expected storage components are present and that their reported state aligns with the installation plan. This is especially useful after hardware work, capacity changes, or component replacement. Reviewing drive information should be performed alongside other hardware and system checks rather than treated as the only validation activity. The resulting information can also support implementation documentation when the final physical configuration needs to be recorded.<\/span><\/p>\n<h3><b>Question 384.<\/b><\/h3>\n<p><b>Why should old equipment be packaged after a hardware replacement?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">To increase array capacity<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">To change network routing<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">To preserve replication metadata<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">To prepare equipment for return<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 4<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Removed equipment may need to be returned through the appropriate support or logistics process after a hardware replacement. Proper packaging helps protect the equipment during transportation and keeps the returned components associated with the correct replacement activity. The implementation specialist should follow the applicable Pure Storage return instructions and ensure that required identification or documentation is retained. Packaging old equipment does not change the FlashArray configuration or increase available capacity. It is part of responsible post-replacement handling and helps complete the physical side of the implementation or maintenance process.<\/span><\/p>\n<h3><b>Question 385.<\/b><\/h3>\n<p><b>What should an implementation specialist confirm before leaving the customer site?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">All hosts report healthy<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Every volume was deleted<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Replication was disabled<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Support access was removed<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 2<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The implementation specialist should verify that required implementation activities are complete and that the customer environment remains in the intended state before leaving the site. This includes checking relevant host connectivity and confirming that expected storage access is functioning. Deleting volumes would be destructive and is not a normal completion requirement. Instead, customer workloads and presented storage should remain available according to the approved design. A final review with the customer can also identify any outstanding issue or exception before departure, allowing unresolved matters to be documented and appropriately escalated.<\/span><\/p>\n<h3><b>Question 386.<\/b><\/h3>\n<p><b>Which check can help verify SAS-related enclosure visibility?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">hostpath check<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">network_probe<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">SAS_view<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">volume_audit<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 3<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">A SAS-related visibility check can help an implementation specialist confirm that expected storage enclosures and associated connections are being recognized correctly. <\/span><span style=\"font-weight: 400;\">SAS_view<\/span><span style=\"font-weight: 400;\"> is useful in this context because enclosure or drive connectivity is an important part of validating physical storage expansion. Such a check can help identify unexpected visibility or connectivity conditions before the implementation is closed. The result should be considered together with hardware inventory, physical cabling, and the approved configuration. This approach provides stronger evidence that the installed storage infrastructure matches the intended implementation.<\/span><\/p>\n<h3><b>Question 387.<\/b><\/h3>\n<p><b>What does customer confirmation at project closure primarily establish?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Future upgrade eligibility<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">New capacity requirements<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Replication bandwidth<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Acceptance of completed work<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 4<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Customer confirmation provides evidence that the implementation activities have been reviewed and that the customer recognizes the completed state. This may include confirmation that expected access is functioning, required configuration has been delivered, and known outstanding items have been discussed. It is different from technical validation because the implementation specialist should perform technical checks independently before seeking final customer confirmation. Combining technical evidence with customer acceptance creates a stronger closure record. Any exceptions should remain documented rather than being silently treated as completed.<\/span><\/p>\n<h3><b>Question 388.<\/b><\/h3>\n<p><b>Which item belongs in a final implementation report?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Actual configuration state<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Unapproved future features<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Hypothetical capacity growth<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Unrelated host inventory<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 1<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">A final implementation report should describe the actual state delivered during the project. Useful information can include installed hardware, relevant configuration details, validation results, customer confirmation, and documented exceptions. Recording the actual configuration creates a reference point for future support and operational activities. Hypothetical future features or unrelated inventory do not provide reliable evidence of what was implemented. The specialist should reconcile the report against implementation records before closure so that the documentation accurately reflects the completed FlashArray environment.<\/span><\/p>\n<h3><b>Question 389.<\/b><\/h3>\n<p><b>What should happen when a health check reveals an unresolved critical issue?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Ignore the warning<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Close the project immediately<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Document and escalate it<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Remove the affected array<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 3<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">An unresolved critical issue identified during a health check should be documented and handled through the appropriate support or escalation process. Ignoring the result can leave the customer with an undetected operational problem, while immediately closing the project can create an inaccurate completion record. The implementation specialist should capture the relevant findings, determine the appropriate next action, and communicate the outstanding condition. Depending on the issue, Pure Storage support or another responsible team may need to become involved. Closure documentation should clearly identify any remaining work.<\/span><\/p>\n<h3><b>Question 390.<\/b><\/h3>\n<p><b>What does an RMA label primarily help identify?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Network interface speed<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Returned equipment<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Replication direction<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Volume ownership<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 2<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">An RMA label is associated with the return process for equipment that is being sent back after replacement or service activity. It helps identify the returned material within the applicable logistics workflow. The implementation specialist should follow the provided return instructions and ensure that the correct equipment is associated with the correct return documentation. An RMA label does not describe storage performance, replication direction, or volume ownership. Proper handling of return materials is an important administrative part of completing hardware replacement activities.<\/span><\/p>\n<h3><b>Question 391.<\/b><\/h3>\n<p><b>Which validation confirms that the final drive inventory matches the installed state?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Review puredrive output<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Restart every host<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Delete unused volumes<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Change the array name<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 1<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Reviewing <\/span><span style=\"font-weight: 400;\">puredrive<\/span><span style=\"font-weight: 400;\"> output provides a practical way to compare the system-reported drive inventory with the expected physical configuration. This can be particularly useful after drive replacement, enclosure work, or capacity-related hardware changes. The implementation specialist can compare reported drive identities, states, and relevant attributes against the implementation records. A matching inventory gives additional evidence that the physical storage configuration is correctly recognized. Other actions, such as renaming the array or deleting volumes, do not validate the installed drive inventory and could introduce unnecessary changes.<\/span><\/p>\n<h3><b>Question 392.<\/b><\/h3>\n<p><b>Why is a post-upgrade support health check valuable?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">It changes host mappings<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">It verifies system condition<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">It creates protection groups<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">It expands storage automatically<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 2<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">A post-upgrade health check helps determine whether the FlashArray remains in an expected operational condition after software or hardware changes. Upgrades can involve multiple system components, so validation after completion is important even when the upgrade itself reports success. A health check can provide additional evidence about system status and may reveal conditions requiring investigation. It does not automatically create storage objects or modify host mappings. The implementation specialist should review the results and record significant findings as part of the post-upgrade validation process.<\/span><\/p>\n<h3><b>Question 393.<\/b><\/h3>\n<p><b>What should be reconciled before issuing the final implementation report?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Proposed marketing material<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Unrelated software inventory<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Future project estimates<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Completed work against records<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 4<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Before issuing the final implementation report, the specialist should reconcile completed work against the relevant implementation records. This comparison helps ensure that the documented hardware, configuration, validation activities, and exceptions accurately represent what was actually delivered. Differences should be investigated and corrected rather than carried into the final documentation. This reconciliation also creates a dependable baseline for future support or expansion work. Marketing material, unrelated software inventories, and future project estimates do not provide evidence that the current FlashArray implementation was completed as planned.<\/span><\/p>\n<h3><b>Question 394.<\/b><\/h3>\n<p><b>Which activity supports confirming management access before handoff?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Log in to the array<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Remove administrator access<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Disable management interfaces<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Erase configuration records<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 1<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Logging in to the array provides a direct way to verify that the intended management access is functioning. This check can confirm that the management interface is reachable and that the expected administrative credentials or access method work as planned. It should be performed during validation rather than assumed from network configuration alone. Any access problem should be investigated before handoff. Removing administrative access or disabling management interfaces would prevent normal operation and is not an appropriate implementation-completion activity.<\/span><\/p>\n<h3><b>Question 395.<\/b><\/h3>\n<p><b>Why should required tuneables be reviewed during implementation?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">To replace customer hosts<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">To change rack dimensions<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">To confirm intended settings<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">To remove support connectivity<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 3<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Required tuneables should be reviewed to confirm that settings needed for the approved implementation have been applied appropriately. Tuneables can influence system behavior, so they should not be changed casually or based on assumptions. The implementation specialist should use the applicable Pure Storage guidance and approved project requirements when determining whether a tuneable is necessary. Reviewing the final settings also helps ensure that the delivered environment matches the planned configuration. Any deviation should be documented and handled according to the applicable implementation or support process.<\/span><\/p>\n<h3><b>Question 396.<\/b><\/h3>\n<p><b>What is the purpose of validating connectivity during implementation?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Increase physical drive count<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Confirm required communication paths<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Rebuild customer applications<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Remove unused protection groups<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 2<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Connectivity validation confirms that required communication paths between the FlashArray and relevant infrastructure are functioning. Depending on the implementation, this may include management connectivity, storage networking, host access, or Pure service communication. Successful configuration alone does not always prove that an end-to-end path is operational, so direct validation is valuable. The specialist should compare observed connectivity with the approved design and investigate unexpected results. This provides evidence that the implemented environment can communicate through the paths required for normal operation and support.<\/span><\/p>\n<h3><b>Question 397.<\/b><\/h3>\n<p><b>Which item should be retained when documenting returned hardware?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Return identification details<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Temporary password values<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Unrelated application logs<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Deleted volume contents<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 1<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Return identification details should be retained as part of the hardware replacement documentation. These details help associate returned components with the appropriate service or replacement activity and provide traceability if questions arise later. The specialist should follow the applicable Pure Storage return process and protect any sensitive information appropriately. Temporary passwords and deleted volume contents are not appropriate return-documentation requirements. Maintaining accurate equipment records also helps reconcile the physical hardware state with the final implementation documentation after replacement work is complete.<\/span><\/p>\n<h3><b>Question 398.<\/b><\/h3>\n<p><b>Which result provides evidence that a required upgrade reached its target state?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Original installation date<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Previous hardware serial<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Recorded target version<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Planned maintenance duration<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 3<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">A recorded target software version provides direct evidence that the upgrade reached the intended software state. The implementation specialist should verify the resulting Purity\/\/FA version after the upgrade and compare it with the approved upgrade plan. Recording the result creates traceability between the planned target and the actual system state. The original installation date, previous hardware serial, or maintenance duration does not independently establish that the target software version was successfully reached. Post-upgrade health validation should also be completed before final closure.<\/span><\/p>\n<h3><b>Question 399.<\/b><\/h3>\n<p><b>What should be done with an approved implementation exception?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Remove it from records<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Document its final status<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Hide it from the customer<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Treat it as completed work<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 2<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">An approved implementation exception should remain documented with its final status and relevant context. Exceptions are useful records because they explain why the delivered environment differs from the original plan or standard procedure. The documentation should identify the nature of the deviation and, where applicable, the approved resolution or follow-up action. Removing or hiding the exception reduces traceability and can create confusion during future support activities. A properly documented exception allows the final implementation record to accurately represent the actual environment.<\/span><\/p>\n<h3><b>Question 400.<\/b><\/h3>\n<p><b>Which final activity best supports formal implementation closure?<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Change production mappings<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Remove monitoring<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Confirm acceptance evidence<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reset system configuration<\/span><\/li>\n<\/ol>\n<p><b>Correct Answer: 3<\/b><\/p>\n<p><b>Explanation:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Confirming acceptance evidence supports formal implementation closure because it demonstrates that the required technical validation and customer-facing completion criteria have been addressed. Acceptance evidence may include completed checklists, validation results, final configuration records, customer confirmation, and documented resolution or disposition of exceptions. Closure should represent the actual delivered state rather than simply the end of scheduled installation time. Before completing the project, the implementation specialist should ensure that the supporting evidence is complete, consistent, and available for future reference.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>View Full Pure Storage FlashArray Implementation Specialist Exam Dumps and Practice Test Dumps &nbsp; Question 381. Which script is useful for checking the installed FlashArray hardware? hardware_check volume_scan host_report fabric_test Correct Answer: 1 Explanation: The hardware_check script is intended to help verify the physical hardware state of a FlashArray after installation or maintenance. It can [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[1648,1647],"tags":[],"_links":{"self":[{"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/posts\/24446"}],"collection":[{"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/comments?post=24446"}],"version-history":[{"count":1,"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/posts\/24446\/revisions"}],"predecessor-version":[{"id":24447,"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/posts\/24446\/revisions\/24447"}],"wp:attachment":[{"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/media?parent=24446"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/categories?post=24446"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.examlabs.com\/certification\/wp-json\/wp\/v2\/tags?post=24446"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}