Pass Cisco CCDE 400-007 Exam in First Attempt Easily
Real Cisco CCDE 400-007 Exam Questions, Accurate & Verified Answers As Experienced in the Actual Test!

Verified by experts
2 products

You save $34.99

400-007 Premium Bundle

  • Premium File 349 Questions & Answers
  • Last Update: Nov 16, 2026
  • Study Guide 934 Pages
$74.99 $109.98

Purchase Individually

  • Premium File

    349 Questions & Answers
    Last Update: Nov 16, 2026

    $76.99
    $69.99
  • Study Guide

    934 Pages

    $43.99
    $39.99

Cisco Certified Design Expert 400-007 Practice Test 13

Question 120

The network architecture decision remains in design review: A transit provider installs redundant route reflectors but all label-forwarding line cards share one physical chassis, and its plan claims route-reflector diversity guarantees data-plane availability. Which architectural evidence should be examined first to assess this design gap?

  1. Review TACACS+/RADIUS accounting, controller task logs, device config versions and clock synchronization.
  2. Inspect RR sessions, RIB/FIB consistency, topology fate sharing, forwarding redundancy and failover traces.
  3. Inspect path maps, telemetry exporter reachability, collector quorum, probe placement and failover exercises.
  4. Inspect VDI session metrics, WAN queue drops, transport RTT, rendering delay and user acceptance.

Explanation

Correct Answer

B:

Inspect RR sessions, RIB/FIB consistency, topology fate sharing, forwarding redundancy and failover traces. These observations directly investigate Separating routing control plane from forwarding path redundancy. Suitable corrective approach: Design physically independent forwarding paths and suitable control-plane redundancy with explicit failure-domain separation. Verification: Losing any one route reflector or forwarding node leaves eligible services reachable after measured convergence.

Incorrect Answers

A:

Review TACACS+/RADIUS accounting, controller task logs, device config versions and clock synchronization. Those checks are useful for Designing a management audit trail across device controllers but do not isolate Separating routing control plane from forwarding path redundancy. The right first evidence here is: Inspect RR sessions, RIB/FIB consistency, topology fate sharing, forwarding redundancy and failover traces.

C:

Inspect path maps, telemetry exporter reachability, collector quorum, probe placement and failover exercises. Those checks are useful for Preventing telemetry blind spots during regional failover but do not isolate Separating routing control plane from forwarding path redundancy. The right first evidence here is: Inspect RR sessions, RIB/FIB consistency, topology fate sharing, forwarding redundancy and failover traces.

D:

Inspect VDI session metrics, WAN queue drops, transport RTT, rendering delay and user acceptance. Those checks are useful for Choosing measurement for interactive remote-desktop sessions but do not isolate Separating routing control plane from forwarding path redundancy. The right first evidence here is: Inspect RR sessions, RIB/FIB consistency, topology fate sharing, forwarding redundancy and failover traces.

Question 121

A Cisco CCDE 400-007 network architect assesses this enterprise requirement: A regional operator manages core routers over the same production VRF that carries customer services and loses SSH and telemetry whenever the WAN data plane fails. Which high-level architectural decision best meets the requirement?

  1. Use scalable route exchange over supported redundant cloud connectivity and segmentation, minimizing manual point-to-point dependencies.
  2. Design physically independent forwarding paths and suitable control-plane redundancy with explicit failure-domain separation.
  3. Provide an isolated, authenticated management transport with independent connectivity and tightly scoped emergency access.
  4. Use centralized intent and template management with regionally resilient control services, staged distribution and local policy caches.

Explanation

Correct Answer

C:

Provide an isolated, authenticated management transport with independent connectivity and tightly scoped emergency access. Technical principle: Management-plane availability and security are design properties distinct from the customer forwarding topology. How to verify: A production routing failure does not eliminate permitted management access or expose management protocols to customer subnets. Real-world boundary: Confirm actual network product/version, Cisco or multivendor interoperability, business and legal requirements, maintenance/rollback scope, operational evidence and current vendor support before making any production change.

Incorrect Answers

A:

Use scalable route exchange over supported redundant cloud connectivity and segmentation, minimizing manual point-to-point dependencies. This control is suitable in the separate Choosing routing for a multi-cloud policy fabric case. It does not resolve the present Protecting management reachability during production outage problem. The appropriate specific response here is: Provide an isolated, authenticated management transport with independent connectivity and tightly scoped emergency access.

B:

Design physically independent forwarding paths and suitable control-plane redundancy with explicit failure-domain separation. This control is suitable in the separate Separating routing control plane from forwarding path redundancy case. It does not resolve the present Protecting management reachability during production outage problem. The appropriate specific response here is: Provide an isolated, authenticated management transport with independent connectivity and tightly scoped emergency access.

D:

Use centralized intent and template management with regionally resilient control services, staged distribution and local policy caches. This control is suitable in the separate Choosing centralized SD-WAN policy with regional resilience case. It does not resolve the present Protecting management reachability during production outage problem. The appropriate specific response here is: Provide an isolated, authenticated management transport with independent connectivity and tightly scoped emergency access.

Question 122

During an enterprise CCDE design acceptance review, engineers observe: A regional operator manages core routers over the same production VRF that carries customer services and loses SSH and telemetry whenever the WAN data plane fails. Which acceptance evidence best validates the intended design outcome?

  1. A nonproduction and pilot deployment preserve BGP and IGP adjacencies and produce approved intended diffs only.
  2. New tenant endpoints appear only where imported and BGP EVPN session and hardware resource usage remain within documented limits.
  3. A production routing failure does not eliminate permitted management access or expose management protocols to customer subnets.
  4. A redundant access-port flap remains recorded but major loss of application reachability produces the highest-priority alert.

Explanation

Correct Answer

C:

A production routing failure does not eliminate permitted management access or expose management protocols to customer subnets. This directly verifies the objective in Protecting management reachability during production outage. Correct action: Provide an isolated, authenticated management transport with independent connectivity and tightly scoped emergency access. Technical reason: Management-plane availability and security are design properties distinct from the customer forwarding topology.

Incorrect Answers

A:

A nonproduction and pilot deployment preserve BGP and IGP adjacencies and produce approved intended diffs only. This would verify Validating declarative automation before route deployment, not the issue in Protecting management reachability during production outage. The needed evidence instead is: A production routing failure does not eliminate permitted management access or expose management protocols to customer subnets.

B:

New tenant endpoints appear only where imported and BGP EVPN session and hardware resource usage remain within documented limits. This would verify Choosing control-plane scale for many EVPN tenants, not the issue in Protecting management reachability during production outage. The needed evidence instead is: A production routing failure does not eliminate permitted management access or expose management protocols to customer subnets.

D:

A redundant access-port flap remains recorded but major loss of application reachability produces the highest-priority alert. This would verify Choosing actionable assurance objectives instead of vanity alerts, not the issue in Protecting management reachability during production outage. The needed evidence instead is: A production routing failure does not eliminate permitted management access or expose management protocols to customer subnets.

Question 123

A Cisco design reviewer examines the engineering rationale for this situation: A regional operator manages core routers over the same production VRF that carries customer services and loses SSH and telemetry whenever the WAN data plane fails. Which design principle best explains the appropriate decision?

  1. A control-plane topology distributes reachability while the data plane requires actual independent hardware and forwarding capacity.
  2. Hybrid control can combine centralized intent with distributed forwarding autonomy during management separation.
  3. Management-plane availability and security are design properties distinct from the customer forwarding topology.
  4. MPLS transport migration requires consistent forwarding labels across transition boundaries, not merely an IGP capability advertisement.

Explanation

Correct Answer

C:

Management-plane availability and security are design properties distinct from the customer forwarding topology. This principle explains Protecting management reachability during production outage. Appropriate intervention: Provide an isolated, authenticated management transport with independent connectivity and tightly scoped emergency access. Observed success criterion: A production routing failure does not eliminate permitted management access or expose management protocols to customer subnets.

Incorrect Answers

A:

A control-plane topology distributes reachability while the data plane requires actual independent hardware and forwarding capacity. That mechanism applies to Separating routing control plane from forwarding path redundancy, not the governing issue in Protecting management reachability during production outage. The relevant principle is: Management-plane availability and security are design properties distinct from the customer forwarding topology.

B:

Hybrid control can combine centralized intent with distributed forwarding autonomy during management separation. That mechanism applies to Selecting decentralized route control for survivable remote branches, not the governing issue in Protecting management reachability during production outage. The relevant principle is: Management-plane availability and security are design properties distinct from the customer forwarding topology.

D:

MPLS transport migration requires consistent forwarding labels across transition boundaries, not merely an IGP capability advertisement. That mechanism applies to Migrating from LDP to segment routing with loop-free transition, not the governing issue in Protecting management reachability during production outage. The relevant principle is: Management-plane availability and security are design properties distinct from the customer forwarding topology.

Question 124

A network design board overlooks a critical architectural safeguard. A regional operator manages core routers over the same production VRF that carries customer services and loses SSH and telemetry whenever the WAN data plane fails. Which direct service or architecture risk follows if this constraint is ignored?

  1. Aggressive generic rate limiting can cause false routing adjacency loss and cascading network reconvergence.
  2. A centralized hairpin can preserve network control while creating avoidable latency and a common outage point.
  3. Small pings can pass even when business applications stall because large packets cannot traverse the encapsulated path.
  4. An in-band-only administration path prevents controlled recovery when the very network it manages fails.

Explanation

Correct Answer

D:

An in-band-only administration path prevents controlled recovery when the very network it manages fails. This is the case-specific risk in Protecting management reachability during production outage. Correct safeguard: Provide an isolated, authenticated management transport with independent connectivity and tightly scoped emergency access. Required test: A production routing failure does not eliminate permitted management access or expose management protocols to customer subnets.

Incorrect Answers

A:

Aggressive generic rate limiting can cause false routing adjacency loss and cascading network reconvergence. This consequence concerns Applying CoPP without starving BGP and BFD, not the direct risk in Protecting management reachability during production outage. The appropriate assessment is: An in-band-only administration path prevents controlled recovery when the very network it manages fails.

B:

A centralized hairpin can preserve network control while creating avoidable latency and a common outage point. This consequence concerns Optimizing branch SaaS experience through local breakout, not the direct risk in Protecting management reachability during production outage. The appropriate assessment is: An in-band-only administration path prevents controlled recovery when the very network it manages fails.

C:

Small pings can pass even when business applications stall because large packets cannot traverse the encapsulated path. This consequence concerns Avoiding MTU black holes in an IPv6 overlay service, not the direct risk in Protecting management reachability during production outage. The appropriate assessment is: An in-band-only administration path prevents controlled recovery when the very network it manages fails.

Question 125

The network architecture decision remains in design review: A regional operator manages core routers over the same production VRF that carries customer services and loses SSH and telemetry whenever the WAN data plane fails. Which architectural evidence should be examined first to assess this design gap?

  1. Inspect controller reachability tests, local RIB policy, protocol timers, isolation behavior and recovery reconciliation.
  2. Inspect management VRFs, out-of-band paths, AAA fallback, control-plane policing and recovery tests.
  3. Review TACACS+/RADIUS accounting, controller task logs, device config versions and clock synchronization.
  4. Inspect route advertisements, tunnel inventory, hub/spoke policy, prefix filters and failure recovery.

Explanation

Correct Answer

B:

Inspect management VRFs, out-of-band paths, AAA fallback, control-plane policing and recovery tests. These observations directly investigate Protecting management reachability during production outage. Suitable corrective approach: Provide an isolated, authenticated management transport with independent connectivity and tightly scoped emergency access. Verification: A production routing failure does not eliminate permitted management access or expose management protocols to customer subnets.

Incorrect Answers

A:

Inspect controller reachability tests, local RIB policy, protocol timers, isolation behavior and recovery reconciliation. Those checks are useful for Selecting decentralized route control for survivable remote branches but do not isolate Protecting management reachability during production outage. The right first evidence here is: Inspect management VRFs, out-of-band paths, AAA fallback, control-plane policing and recovery tests.

C:

Review TACACS+/RADIUS accounting, controller task logs, device config versions and clock synchronization. Those checks are useful for Designing a management audit trail across device controllers but do not isolate Protecting management reachability during production outage. The right first evidence here is: Inspect management VRFs, out-of-band paths, AAA fallback, control-plane policing and recovery tests.

D:

Inspect route advertisements, tunnel inventory, hub/spoke policy, prefix filters and failure recovery. Those checks are useful for Choosing routing for a multi-cloud policy fabric but do not isolate Protecting management reachability during production outage. The right first evidence here is: Inspect management VRFs, out-of-band paths, AAA fallback, control-plane policing and recovery tests.

Question 126

A Cisco CCDE 400-007 network architect assesses this enterprise requirement: A colocation provider adds 300 tenant VRFs and floods every endpoint MAC to every fabric node without considering route-target filtering or control-plane memory limits. Which high-level architectural decision best meets the requirement?

  1. Design physically independent forwarding paths and suitable control-plane redundancy with explicit failure-domain separation.
  2. Use a routed spine-leaf underlay and EVPN VXLAN overlays with bounded bridging domains and suitable tenant VRFs.
  3. Define application classes, trust boundaries, shaping and suitable voice priority with engineered bandwidth and packet-loss targets.
  4. Use EVPN route-type and route-target scoping plus hierarchical tenant boundaries sized to measured platform control-plane capacity.

Explanation

Correct Answer

D:

Use EVPN route-type and route-target scoping plus hierarchical tenant boundaries sized to measured platform control-plane capacity. Technical principle: EVPN's distributed control plane can limit flooding when reachability advertisements and imports are properly scoped. How to verify: New tenant endpoints appear only where imported and BGP EVPN session and hardware resource usage remain within documented limits. Real-world boundary: Confirm actual network product/version, Cisco or multivendor interoperability, business and legal requirements, maintenance/rollback scope, operational evidence and current vendor support before making any production change.

Incorrect Answers

A:

Design physically independent forwarding paths and suitable control-plane redundancy with explicit failure-domain separation. This control is suitable in the separate Separating routing control plane from forwarding path redundancy case. It does not resolve the present Choosing control-plane scale for many EVPN tenants problem. The appropriate specific response here is: Use EVPN route-type and route-target scoping plus hierarchical tenant boundaries sized to measured platform control-plane capacity.

B:

Use a routed spine-leaf underlay and EVPN VXLAN overlays with bounded bridging domains and suitable tenant VRFs. This control is suitable in the separate Building EVPN VXLAN leaf-spine with L3 fabric boundaries case. It does not resolve the present Choosing control-plane scale for many EVPN tenants problem. The appropriate specific response here is: Use EVPN route-type and route-target scoping plus hierarchical tenant boundaries sized to measured platform control-plane capacity.

C:

Define application classes, trust boundaries, shaping and suitable voice priority with engineered bandwidth and packet-loss targets. This control is suitable in the separate Designing voice-over-WAN QoS under congestion case. It does not resolve the present Choosing control-plane scale for many EVPN tenants problem. The appropriate specific response here is: Use EVPN route-type and route-target scoping plus hierarchical tenant boundaries sized to measured platform control-plane capacity.

Question 127

During an enterprise CCDE design acceptance review, engineers observe: A colocation provider adds 300 tenant VRFs and floods every endpoint MAC to every fabric node without considering route-target filtering or control-plane memory limits. Which acceptance evidence best validates the intended design outcome?

  1. A simulated cloud control loss preserves established permitted flows and new critical sessions within documented capability limits.
  2. An approved configuration change can be linked to one administrator, affected devices, exact revision and rollback action.
  3. New tenant endpoints appear only where imported and BGP EVPN session and hardware resource usage remain within documented limits.
  4. Synthetic and real-user transactions identify where tail delay appears, correlating affected paths and interfaces under load.

Explanation

Correct Answer

C:

New tenant endpoints appear only where imported and BGP EVPN session and hardware resource usage remain within documented limits. This directly verifies the objective in Choosing control-plane scale for many EVPN tenants. Correct action: Use EVPN route-type and route-target scoping plus hierarchical tenant boundaries sized to measured platform control-plane capacity. Technical reason: EVPN's distributed control plane can limit flooding when reachability advertisements and imports are properly scoped.

Incorrect Answers

A:

A simulated cloud control loss preserves established permitted flows and new critical sessions within documented capability limits. This would verify Choosing a hybrid overlay controller for disconnection tolerance, not the issue in Choosing control-plane scale for many EVPN tenants. The needed evidence instead is: New tenant endpoints appear only where imported and BGP EVPN session and hardware resource usage remain within documented limits.

B:

An approved configuration change can be linked to one administrator, affected devices, exact revision and rollback action. This would verify Designing a management audit trail across device controllers, not the issue in Choosing control-plane scale for many EVPN tenants. The needed evidence instead is: New tenant endpoints appear only where imported and BGP EVPN session and hardware resource usage remain within documented limits.

D:

Synthetic and real-user transactions identify where tail delay appears, correlating affected paths and interfaces under load. This would verify Designing end-to-end latency SLO instrumentation, not the issue in Choosing control-plane scale for many EVPN tenants. The needed evidence instead is: New tenant endpoints appear only where imported and BGP EVPN session and hardware resource usage remain within documented limits.

Question 128

A Cisco design reviewer examines the engineering rationale for this situation: A colocation provider adds 300 tenant VRFs and floods every endpoint MAC to every fabric node without considering route-target filtering or control-plane memory limits. Which design principle best explains the appropriate decision?

  1. A control-plane topology distributes reachability while the data plane requires actual independent hardware and forwarding capacity.
  2. EVPN's distributed control plane can limit flooding when reachability advertisements and imports are properly scoped.
  3. MPLS transport migration requires consistent forwarding labels across transition boundaries, not merely an IGP capability advertisement.
  4. Hybrid control can combine centralized intent with distributed forwarding autonomy during management separation.

Explanation

Correct Answer

B:

EVPN's distributed control plane can limit flooding when reachability advertisements and imports are properly scoped. This principle explains Choosing control-plane scale for many EVPN tenants. Appropriate intervention: Use EVPN route-type and route-target scoping plus hierarchical tenant boundaries sized to measured platform control-plane capacity. Observed success criterion: New tenant endpoints appear only where imported and BGP EVPN session and hardware resource usage remain within documented limits.

Incorrect Answers

A:

A control-plane topology distributes reachability while the data plane requires actual independent hardware and forwarding capacity. That mechanism applies to Separating routing control plane from forwarding path redundancy, not the governing issue in Choosing control-plane scale for many EVPN tenants. The relevant principle is: EVPN's distributed control plane can limit flooding when reachability advertisements and imports are properly scoped.

C:

MPLS transport migration requires consistent forwarding labels across transition boundaries, not merely an IGP capability advertisement. That mechanism applies to Migrating from LDP to segment routing with loop-free transition, not the governing issue in Choosing control-plane scale for many EVPN tenants. The relevant principle is: EVPN's distributed control plane can limit flooding when reachability advertisements and imports are properly scoped.

D:

Hybrid control can combine centralized intent with distributed forwarding autonomy during management separation. That mechanism applies to Selecting decentralized route control for survivable remote branches, not the governing issue in Choosing control-plane scale for many EVPN tenants. The relevant principle is: EVPN's distributed control plane can limit flooding when reachability advertisements and imports are properly scoped.

Question 129

A network design board overlooks a critical architectural safeguard. A colocation provider adds 300 tenant VRFs and floods every endpoint MAC to every fabric node without considering route-target filtering or control-plane memory limits. Which direct service or architecture risk follows if this constraint is ignored?

  1. Improper route-target imports can leak sensitive routes between unrelated tenants despite working labeled forwarding.
  2. Unbounded endpoint distribution consumes route and MAC resources and increases exposure between tenants.
  3. Routing-level correlation alone can misattribute security incidents and violate tenant privacy or retention requirements.
  4. Aggressive generic rate limiting can cause false routing adjacency loss and cascading network reconvergence.

Explanation

Correct Answer

B:

Unbounded endpoint distribution consumes route and MAC resources and increases exposure between tenants. This is the case-specific risk in Choosing control-plane scale for many EVPN tenants. Correct safeguard: Use EVPN route-type and route-target scoping plus hierarchical tenant boundaries sized to measured platform control-plane capacity. Required test: New tenant endpoints appear only where imported and BGP EVPN session and hardware resource usage remain within documented limits.

Incorrect Answers

A:

Improper route-target imports can leak sensitive routes between unrelated tenants despite working labeled forwarding. This consequence concerns Designing MPLS to segment regulated and guest customer traffic, not the direct risk in Choosing control-plane scale for many EVPN tenants. The appropriate assessment is: Unbounded endpoint distribution consumes route and MAC resources and increases exposure between tenants.

C:

Routing-level correlation alone can misattribute security incidents and violate tenant privacy or retention requirements. This consequence concerns Separating NAT translation from application identity across clouds, not the direct risk in Choosing control-plane scale for many EVPN tenants. The appropriate assessment is: Unbounded endpoint distribution consumes route and MAC resources and increases exposure between tenants.

D:

Aggressive generic rate limiting can cause false routing adjacency loss and cascading network reconvergence. This consequence concerns Applying CoPP without starving BGP and BFD, not the direct risk in Choosing control-plane scale for many EVPN tenants. The appropriate assessment is: Unbounded endpoint distribution consumes route and MAC resources and increases exposure between tenants.

Question 130

The network architecture decision remains in design review: A colocation provider adds 300 tenant VRFs and floods every endpoint MAC to every fabric node without considering route-target filtering or control-plane memory limits. Which architectural evidence should be examined first to assess this design gap?

  1. Review VRF route tables, MP-BGP VPNv4/v6 routes, route targets, LFIB and PE policy tests.
  2. Inspect RR sessions, RIB/FIB consistency, topology fate sharing, forwarding redundancy and failover traces.
  3. Inspect bidirectional flow records, BGP next hops, firewall session tables, ECMP policies and packet captures.
  4. Inspect EVPN route tables, RT membership, MAC/ARP populations, TCAM capacity and BGP updates.

Explanation

Correct Answer

D:

Inspect EVPN route tables, RT membership, MAC/ARP populations, TCAM capacity and BGP updates. These observations directly investigate Choosing control-plane scale for many EVPN tenants. Suitable corrective approach: Use EVPN route-type and route-target scoping plus hierarchical tenant boundaries sized to measured platform control-plane capacity. Verification: New tenant endpoints appear only where imported and BGP EVPN session and hardware resource usage remain within documented limits.

Incorrect Answers

A:

Review VRF route tables, MP-BGP VPNv4/v6 routes, route targets, LFIB and PE policy tests. Those checks are useful for Designing MPLS to segment regulated and guest customer traffic but do not isolate Choosing control-plane scale for many EVPN tenants. The right first evidence here is: Inspect EVPN route tables, RT membership, MAC/ARP populations, TCAM capacity and BGP updates.

B:

Inspect RR sessions, RIB/FIB consistency, topology fate sharing, forwarding redundancy and failover traces. Those checks are useful for Separating routing control plane from forwarding path redundancy but do not isolate Choosing control-plane scale for many EVPN tenants. The right first evidence here is: Inspect EVPN route tables, RT membership, MAC/ARP populations, TCAM capacity and BGP updates.

C:

Inspect bidirectional flow records, BGP next hops, firewall session tables, ECMP policies and packet captures. Those checks are useful for Preserving return-path symmetry through stateful firewalls but do not isolate Choosing control-plane scale for many EVPN tenants. The right first evidence here is: Inspect EVPN route tables, RT membership, MAC/ARP populations, TCAM capacity and BGP updates.

Cisco Certified Design Expert (400-007) Practice Tests

Purchase Individually

  • Premium File

    349 Questions & Answers
    Last Update: Nov 16, 2026

    $76.99
    $69.99
  • Study Guide

    934 Pages

    $43.99
    $39.99

SPECIAL OFFER: GET 10% OFF
This is ONE TIME OFFER

You save
10%

Enter Your Email Address to Receive Your 10% Off Discount Code

SPECIAL OFFER: GET 10% OFF

You save
10%

Use Discount Code:

A confirmation link was sent to your e-mail.

Please check your mailbox for a message from support@examlabs.com and follow the directions.

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your email address below to get started with our interactive software demo of your free trial.

  • Realistic exam simulation and exam editor with preview functions
  • Whole exam in a single file with several different question types
  • Customizable exam-taking mode & detailed score reports