Pass Cisco CCDE 400-007 Exam in First Attempt Easily
Real Cisco CCDE 400-007 Exam Questions, Accurate & Verified Answers As Experienced in the Actual Test!

Verified by experts
2 products

You save $34.99

400-007 Premium Bundle

  • Premium File 349 Questions & Answers
  • Last Update: Nov 16, 2026
  • Study Guide 934 Pages
$74.99 $109.98

Purchase Individually

  • Premium File

    349 Questions & Answers
    Last Update: Nov 16, 2026

    $76.99
    $69.99
  • Study Guide

    934 Pages

    $43.99
    $39.99

Cisco Certified Design Expert 400-007 Practice Test 2

Question 10

The network architecture decision remains in design review: A payments processor has a nonnegotiable compliance signoff, a fixed data-center shutdown date and a tightly controlled migration window but is offered ad hoc weekly production routing changes. Which architectural evidence should be examined first to assess this design gap?

  1. Examine feature drift, training provenance, false-positive rates, policy diffs, model approval and rollback results.
  2. Examine energy baselines, switch power modes, cooling metrics, N+1 simulations and carbon accounting assumptions.
  3. Review contractual milestones, design baselines, formal approvals, rollback criteria, test reports and change-freeze dates.
  4. Inspect pilot acceptance records, stakeholder decisions, architecture exceptions, rollout dependencies and validated success metrics.

Explanation

Correct Answer

C:

Review contractual milestones, design baselines, formal approvals, rollback criteria, test reports and change-freeze dates. These observations directly investigate Staging a waterfall cutover for a regulated payment network. Suitable corrective approach: Use gated waterfall-style design approval, integration testing, rollback rehearsal and a sequenced transition with formal evidence at each milestone. Verification: Signoffs on high-level design, detailed dependencies, failure tests and cutover readiness precede any irreversible shutdown.

Incorrect Answers

A:

Examine feature drift, training provenance, false-positive rates, policy diffs, model approval and rollback results. Those checks are useful for Validating AI-based network assurance with human governance but do not isolate Staging a waterfall cutover for a regulated payment network. The right first evidence here is: Review contractual milestones, design baselines, formal approvals, rollback criteria, test reports and change-freeze dates.

B:

Examine energy baselines, switch power modes, cooling metrics, N+1 simulations and carbon accounting assumptions. Those checks are useful for Reducing network energy without weakening resiliency but do not isolate Staging a waterfall cutover for a regulated payment network. The right first evidence here is: Review contractual milestones, design baselines, formal approvals, rollback criteria, test reports and change-freeze dates.

D:

Inspect pilot acceptance records, stakeholder decisions, architecture exceptions, rollout dependencies and validated success metrics. Those checks are useful for Choosing phased agile validation for evolving branch architecture but do not isolate Staging a waterfall cutover for a regulated payment network. The right first evidence here is: Review contractual milestones, design baselines, formal approvals, rollback criteria, test reports and change-freeze dates.

Question 11

A Cisco CCDE 400-007 network architect assesses this enterprise requirement: Finance wants lower circuit cost while security wants complete segmentation and branches require low-latency voice; the initial design says only 'modernize network' and contains no tie-breakers. Which high-level architectural decision best meets the requirement?

  1. Collect quantified functional and nonfunctional requirements and secure stakeholder priorities and explicit tradeoff decisions before selecting architectures.
  2. Create a common target architecture with regional coexistence stages, interface contracts, operations handoffs and explicit go/no-go acceptance gates.
  3. Model synchronous versus asynchronous replication against measurable RPO, latency, circuit protection and transaction behavior before selecting the transport.
  4. Compare continued support, software capability, component upgrades, electrical efficiency and responsible retirement before specifying full replacement.

Explanation

Correct Answer

A:

Collect quantified functional and nonfunctional requirements and secure stakeholder priorities and explicit tradeoff decisions before selecting architectures. Technical principle: Design requirements must reconcile competing business outcomes before technology selection can be objectively evaluated. How to verify: The requirements matrix records measurable latency, availability, trust-zone, budget and ownership constraints with approved conflict resolution. Real-world boundary: Confirm actual network product/version, Cisco or multivendor interoperability, business and legal requirements, maintenance/rollback scope, operational evidence and current vendor support before making any production change.

Incorrect Answers

B:

Create a common target architecture with regional coexistence stages, interface contracts, operations handoffs and explicit go/no-go acceptance gates. This control is suitable in the separate Preserving operations through organizational merger design case. It does not resolve the present Avoiding scope conflict in a global campus transformation problem. The appropriate specific response here is: Collect quantified functional and nonfunctional requirements and secure stakeholder priorities and explicit tradeoff decisions before selecting architectures.

C:

Model synchronous versus asynchronous replication against measurable RPO, latency, circuit protection and transaction behavior before selecting the transport. This control is suitable in the separate Balancing RPO and WAN cost for critical data replication case. It does not resolve the present Avoiding scope conflict in a global campus transformation problem. The appropriate specific response here is: Collect quantified functional and nonfunctional requirements and secure stakeholder priorities and explicit tradeoff decisions before selecting architectures.

D:

Compare continued support, software capability, component upgrades, electrical efficiency and responsible retirement before specifying full replacement. This control is suitable in the separate Evaluating modular refresh against hardware disposal impact case. It does not resolve the present Avoiding scope conflict in a global campus transformation problem. The appropriate specific response here is: Collect quantified functional and nonfunctional requirements and secure stakeholder priorities and explicit tradeoff decisions before selecting architectures.

Question 12

During an enterprise CCDE design acceptance review, engineers observe: Finance wants lower circuit cost while security wants complete segmentation and branches require low-latency voice; the initial design says only 'modernize network' and contains no tie-breakers. Which acceptance evidence best validates the intended design outcome?

  1. Regional teams demonstrate interoperable routing and approved support ownership before legacy connections are withdrawn.
  2. The requirements matrix records measurable latency, availability, trust-zone, budget and ownership constraints with approved conflict resolution.
  3. The decision record presents discounted multiyear cash flows, operational ownership and sensitivity to demand variation.
  4. Power telemetry shows lower energy per transported unit while failover and overnight application tests meet established availability limits.

Explanation

Correct Answer

B:

The requirements matrix records measurable latency, availability, trust-zone, budget and ownership constraints with approved conflict resolution. This directly verifies the objective in Avoiding scope conflict in a global campus transformation. Correct action: Collect quantified functional and nonfunctional requirements and secure stakeholder priorities and explicit tradeoff decisions before selecting architectures. Technical reason: Design requirements must reconcile competing business outcomes before technology selection can be objectively evaluated.

Incorrect Answers

A:

Regional teams demonstrate interoperable routing and approved support ownership before legacy connections are withdrawn. This would verify Preserving operations through organizational merger design, not the issue in Avoiding scope conflict in a global campus transformation. The needed evidence instead is: The requirements matrix records measurable latency, availability, trust-zone, budget and ownership constraints with approved conflict resolution.

C:

The decision record presents discounted multiyear cash flows, operational ownership and sensitivity to demand variation. This would verify Selecting sustainable CAPEX versus OPEX for regional backbone, not the issue in Avoiding scope conflict in a global campus transformation. The needed evidence instead is: The requirements matrix records measurable latency, availability, trust-zone, budget and ownership constraints with approved conflict resolution.

D:

Power telemetry shows lower energy per transported unit while failover and overnight application tests meet established availability limits. This would verify Reducing network energy without weakening resiliency, not the issue in Avoiding scope conflict in a global campus transformation. The needed evidence instead is: The requirements matrix records measurable latency, availability, trust-zone, budget and ownership constraints with approved conflict resolution.

Question 13

A Cisco design reviewer examines the engineering rationale for this situation: Finance wants lower circuit cost while security wants complete segmentation and branches require low-latency voice; the initial design says only 'modernize network' and contains no tie-breakers. Which design principle best explains the appropriate decision?

  1. Environmental sustainability must be evaluated across the equipment lifecycle and against fault-tolerance requirements.
  2. A lifecycle with fixed compliance gates prioritizes formally baselined requirements and documented acceptance over frequent production experimentation.
  3. Expected savings must be judged alongside outage probability and business consequence for the relevant services.
  4. Design requirements must reconcile competing business outcomes before technology selection can be objectively evaluated.

Explanation

Correct Answer

D:

Design requirements must reconcile competing business outcomes before technology selection can be objectively evaluated. This principle explains Avoiding scope conflict in a global campus transformation. Appropriate intervention: Collect quantified functional and nonfunctional requirements and secure stakeholder priorities and explicit tradeoff decisions before selecting architectures. Observed success criterion: The requirements matrix records measurable latency, availability, trust-zone, budget and ownership constraints with approved conflict resolution.

Incorrect Answers

A:

Environmental sustainability must be evaluated across the equipment lifecycle and against fault-tolerance requirements. That mechanism applies to Reducing network energy without weakening resiliency, not the governing issue in Avoiding scope conflict in a global campus transformation. The relevant principle is: Design requirements must reconcile competing business outcomes before technology selection can be objectively evaluated.

B:

A lifecycle with fixed compliance gates prioritizes formally baselined requirements and documented acceptance over frequent production experimentation. That mechanism applies to Staging a waterfall cutover for a regulated payment network, not the governing issue in Avoiding scope conflict in a global campus transformation. The relevant principle is: Design requirements must reconcile competing business outcomes before technology selection can be objectively evaluated.

C:

Expected savings must be judged alongside outage probability and business consequence for the relevant services. That mechanism applies to Quantifying risk/reward of a proprietary transport transition, not the governing issue in Avoiding scope conflict in a global campus transformation. The relevant principle is: Design requirements must reconcile competing business outcomes before technology selection can be objectively evaluated.

Question 14

A network design board overlooks a critical architectural safeguard. Finance wants lower circuit cost while security wants complete segmentation and branches require low-latency voice; the initial design says only 'modernize network' and contains no tie-breakers. Which direct service or architecture risk follows if this constraint is ignored?

  1. Uncontrolled iterations in the regulated production segment may break audit custody and expand the change failure domain.
  2. An attractive design can satisfy one sponsor but violate the security or application requirement that made the project necessary.
  3. A design sized only for average utilization can suffer GPU stalls and dropped training traffic during collective synchronization.
  4. An unsupported low-power device can increase security exposure and force early high-impact replacement.

Explanation

Correct Answer

B:

An attractive design can satisfy one sponsor but violate the security or application requirement that made the project necessary. This is the case-specific risk in Avoiding scope conflict in a global campus transformation. Correct safeguard: Collect quantified functional and nonfunctional requirements and secure stakeholder priorities and explicit tradeoff decisions before selecting architectures. Required test: The requirements matrix records measurable latency, availability, trust-zone, budget and ownership constraints with approved conflict resolution.

Incorrect Answers

A:

Uncontrolled iterations in the regulated production segment may break audit custody and expand the change failure domain. This consequence concerns Staging a waterfall cutover for a regulated payment network, not the direct risk in Avoiding scope conflict in a global campus transformation. The appropriate assessment is: An attractive design can satisfy one sponsor but violate the security or application requirement that made the project necessary.

C:

A design sized only for average utilization can suffer GPU stalls and dropped training traffic during collective synchronization. This consequence concerns Capacity-planning AI training fabrics for east-west bursts, not the direct risk in Avoiding scope conflict in a global campus transformation. The appropriate assessment is: An attractive design can satisfy one sponsor but violate the security or application requirement that made the project necessary.

D:

An unsupported low-power device can increase security exposure and force early high-impact replacement. This consequence concerns Avoiding sustainability-only supplier selection, not the direct risk in Avoiding scope conflict in a global campus transformation. The appropriate assessment is: An attractive design can satisfy one sponsor but violate the security or application requirement that made the project necessary.

Question 15

The network architecture decision remains in design review: Finance wants lower circuit cost while security wants complete segmentation and branches require low-latency voice; the initial design says only 'modernize network' and contains no tie-breakers. Which architectural evidence should be examined first to assess this design gap?

  1. Inspect pilot acceptance records, stakeholder decisions, architecture exceptions, rollout dependencies and validated success metrics.
  2. Review application criticality, carrier SLAs, insurance exposure, underlay failure correlations and financial sensitivities.
  3. Inspect discovery interviews, application SLOs, risk decisions, financial envelopes and accountable signoffs.
  4. Examine energy baselines, switch power modes, cooling metrics, N+1 simulations and carbon accounting assumptions.

Explanation

Correct Answer

C:

Inspect discovery interviews, application SLOs, risk decisions, financial envelopes and accountable signoffs. These observations directly investigate Avoiding scope conflict in a global campus transformation. Suitable corrective approach: Collect quantified functional and nonfunctional requirements and secure stakeholder priorities and explicit tradeoff decisions before selecting architectures. Verification: The requirements matrix records measurable latency, availability, trust-zone, budget and ownership constraints with approved conflict resolution.

Incorrect Answers

A:

Inspect pilot acceptance records, stakeholder decisions, architecture exceptions, rollout dependencies and validated success metrics. Those checks are useful for Choosing phased agile validation for evolving branch architecture but do not isolate Avoiding scope conflict in a global campus transformation. The right first evidence here is: Inspect discovery interviews, application SLOs, risk decisions, financial envelopes and accountable signoffs.

B:

Review application criticality, carrier SLAs, insurance exposure, underlay failure correlations and financial sensitivities. Those checks are useful for Quantifying risk/reward of a proprietary transport transition but do not isolate Avoiding scope conflict in a global campus transformation. The right first evidence here is: Inspect discovery interviews, application SLOs, risk decisions, financial envelopes and accountable signoffs.

D:

Examine energy baselines, switch power modes, cooling metrics, N+1 simulations and carbon accounting assumptions. Those checks are useful for Reducing network energy without weakening resiliency but do not isolate Avoiding scope conflict in a global campus transformation. The right first evidence here is: Inspect discovery interviews, application SLOs, risk decisions, financial envelopes and accountable signoffs.

Question 16

A Cisco CCDE 400-007 network architect assesses this enterprise requirement: Two companies merge but retain different change-control models, support vendors and regional maintenance windows; architects plan one simultaneous global overlay replacement. Which high-level architectural decision best meets the requirement?

  1. Define an iterative design backlog with architecture guardrails, representative site pilots, measurable acceptance tests and controlled backlog reprioritization.
  2. Use a documented risk-adjusted comparison, dual-provider pilot and incremental path selection tied to application SLOs and support contracts.
  3. Create a common target architecture with regional coexistence stages, interface contracts, operations handoffs and explicit go/no-go acceptance gates.
  4. Place protected inference in approved regional/private environments and restrict data movement through documented processing and network controls.

Explanation

Correct Answer

C:

Create a common target architecture with regional coexistence stages, interface contracts, operations handoffs and explicit go/no-go acceptance gates. Technical principle: Integration governance is as important as packet forwarding because responsibility changes can outlast the technical migration. How to verify: Regional teams demonstrate interoperable routing and approved support ownership before legacy connections are withdrawn. Real-world boundary: Confirm actual network product/version, Cisco or multivendor interoperability, business and legal requirements, maintenance/rollback scope, operational evidence and current vendor support before making any production change.

Incorrect Answers

A:

Define an iterative design backlog with architecture guardrails, representative site pilots, measurable acceptance tests and controlled backlog reprioritization. This control is suitable in the separate Choosing phased agile validation for evolving branch architecture case. It does not resolve the present Preserving operations through organizational merger design problem. The appropriate specific response here is: Create a common target architecture with regional coexistence stages, interface contracts, operations handoffs and explicit go/no-go acceptance gates.

B:

Use a documented risk-adjusted comparison, dual-provider pilot and incremental path selection tied to application SLOs and support contracts. This control is suitable in the separate Quantifying risk/reward of a proprietary transport transition case. It does not resolve the present Preserving operations through organizational merger design problem. The appropriate specific response here is: Create a common target architecture with regional coexistence stages, interface contracts, operations handoffs and explicit go/no-go acceptance gates.

D:

Place protected inference in approved regional/private environments and restrict data movement through documented processing and network controls. This control is suitable in the separate Choosing sovereign placement for AI inference traffic case. It does not resolve the present Preserving operations through organizational merger design problem. The appropriate specific response here is: Create a common target architecture with regional coexistence stages, interface contracts, operations handoffs and explicit go/no-go acceptance gates.

Question 17

During an enterprise CCDE design acceptance review, engineers observe: Two companies merge but retain different change-control models, support vendors and regional maintenance windows; architects plan one simultaneous global overlay replacement. Which acceptance evidence best validates the intended design outcome?

  1. Regional teams demonstrate interoperable routing and approved support ownership before legacy connections are withdrawn.
  2. The requirements matrix records measurable latency, availability, trust-zone, budget and ownership constraints with approved conflict resolution.
  3. The decision record presents discounted multiyear cash flows, operational ownership and sensitivity to demand variation.
  4. Five-year capacity scenarios demonstrate expansion without unnecessary new trenches and maintain audited optical loss margins.

Explanation

Correct Answer

A:

Regional teams demonstrate interoperable routing and approved support ownership before legacy connections are withdrawn. This directly verifies the objective in Preserving operations through organizational merger design. Correct action: Create a common target architecture with regional coexistence stages, interface contracts, operations handoffs and explicit go/no-go acceptance gates. Technical reason: Integration governance is as important as packet forwarding because responsibility changes can outlast the technical migration.

Incorrect Answers

B:

The requirements matrix records measurable latency, availability, trust-zone, budget and ownership constraints with approved conflict resolution. This would verify Avoiding scope conflict in a global campus transformation, not the issue in Preserving operations through organizational merger design. The needed evidence instead is: Regional teams demonstrate interoperable routing and approved support ownership before legacy connections are withdrawn.

C:

The decision record presents discounted multiyear cash flows, operational ownership and sensitivity to demand variation. This would verify Selecting sustainable CAPEX versus OPEX for regional backbone, not the issue in Preserving operations through organizational merger design. The needed evidence instead is: Regional teams demonstrate interoperable routing and approved support ownership before legacy connections are withdrawn.

D:

Five-year capacity scenarios demonstrate expansion without unnecessary new trenches and maintain audited optical loss margins. This would verify Planning optical plant sustainability for long-lived metro growth, not the issue in Preserving operations through organizational merger design. The needed evidence instead is: Regional teams demonstrate interoperable routing and approved support ownership before legacy connections are withdrawn.

Question 18

A Cisco design reviewer examines the engineering rationale for this situation: Two companies merge but retain different change-control models, support vendors and regional maintenance windows; architects plan one simultaneous global overlay replacement. Which design principle best explains the appropriate decision?

  1. Integration governance is as important as packet forwarding because responsibility changes can outlast the technical migration.
  2. Governance of AI-assisted designs requires protection of intellectual property and independent technical validation of generated advice.
  3. Design requirements must reconcile competing business outcomes before technology selection can be objectively evaluated.
  4. Sustainable design must account for durability and supportability because frequent replacement can erase operational efficiency gains.

Explanation

Correct Answer

A:

Integration governance is as important as packet forwarding because responsibility changes can outlast the technical migration. This principle explains Preserving operations through organizational merger design. Appropriate intervention: Create a common target architecture with regional coexistence stages, interface contracts, operations handoffs and explicit go/no-go acceptance gates. Observed success criterion: Regional teams demonstrate interoperable routing and approved support ownership before legacy connections are withdrawn.

Incorrect Answers

B:

Governance of AI-assisted designs requires protection of intellectual property and independent technical validation of generated advice. That mechanism applies to Choosing AI governance for third-party design recommendations, not the governing issue in Preserving operations through organizational merger design. The relevant principle is: Integration governance is as important as packet forwarding because responsibility changes can outlast the technical migration.

C:

Design requirements must reconcile competing business outcomes before technology selection can be objectively evaluated. That mechanism applies to Avoiding scope conflict in a global campus transformation, not the governing issue in Preserving operations through organizational merger design. The relevant principle is: Integration governance is as important as packet forwarding because responsibility changes can outlast the technical migration.

D:

Sustainable design must account for durability and supportability because frequent replacement can erase operational efficiency gains. That mechanism applies to Avoiding sustainability-only supplier selection, not the governing issue in Preserving operations through organizational merger design. The relevant principle is: Integration governance is as important as packet forwarding because responsibility changes can outlast the technical migration.

Question 19

A network design board overlooks a critical architectural safeguard. Two companies merge but retain different change-control models, support vendors and regional maintenance windows; architects plan one simultaneous global overlay replacement. Which direct service or architecture risk follows if this constraint is ignored?

  1. Premature unification can strand services when neither old nor new organization owns an incident or rollback.
  2. An attractive design can satisfy one sponsor but violate the security or application requirement that made the project necessary.
  3. A design sized only for average utilization can suffer GPU stalls and dropped training traffic during collective synchronization.
  4. Overspecified new routes waste capital and embodied resources while underprovisioned optics create future rework.

Explanation

Correct Answer

A:

Premature unification can strand services when neither old nor new organization owns an incident or rollback. This is the case-specific risk in Preserving operations through organizational merger design. Correct safeguard: Create a common target architecture with regional coexistence stages, interface contracts, operations handoffs and explicit go/no-go acceptance gates. Required test: Regional teams demonstrate interoperable routing and approved support ownership before legacy connections are withdrawn.

Incorrect Answers

B:

An attractive design can satisfy one sponsor but violate the security or application requirement that made the project necessary. This consequence concerns Avoiding scope conflict in a global campus transformation, not the direct risk in Preserving operations through organizational merger design. The appropriate assessment is: Premature unification can strand services when neither old nor new organization owns an incident or rollback.

C:

A design sized only for average utilization can suffer GPU stalls and dropped training traffic during collective synchronization. This consequence concerns Capacity-planning AI training fabrics for east-west bursts, not the direct risk in Preserving operations through organizational merger design. The appropriate assessment is: Premature unification can strand services when neither old nor new organization owns an incident or rollback.

D:

Overspecified new routes waste capital and embodied resources while underprovisioned optics create future rework. This consequence concerns Planning optical plant sustainability for long-lived metro growth, not the direct risk in Preserving operations through organizational merger design. The appropriate assessment is: Premature unification can strand services when neither old nor new organization owns an incident or rollback.

Question 20

The network architecture decision remains in design review: Two companies merge but retain different change-control models, support vendors and regional maintenance windows; architects plan one simultaneous global overlay replacement. Which architectural evidence should be examined first to assess this design gap?

  1. Inspect pilot acceptance records, stakeholder decisions, architecture exceptions, rollout dependencies and validated success metrics.
  2. Examine energy baselines, switch power modes, cooling metrics, N+1 simulations and carbon accounting assumptions.
  3. Examine operating models, regional constraints, RACI decisions, exception records and coexistence diagrams.
  4. Examine feature drift, training provenance, false-positive rates, policy diffs, model approval and rollback results.

Explanation

Correct Answer

C:

Examine operating models, regional constraints, RACI decisions, exception records and coexistence diagrams. These observations directly investigate Preserving operations through organizational merger design. Suitable corrective approach: Create a common target architecture with regional coexistence stages, interface contracts, operations handoffs and explicit go/no-go acceptance gates. Verification: Regional teams demonstrate interoperable routing and approved support ownership before legacy connections are withdrawn.

Incorrect Answers

A:

Inspect pilot acceptance records, stakeholder decisions, architecture exceptions, rollout dependencies and validated success metrics. Those checks are useful for Choosing phased agile validation for evolving branch architecture but do not isolate Preserving operations through organizational merger design. The right first evidence here is: Examine operating models, regional constraints, RACI decisions, exception records and coexistence diagrams.

B:

Examine energy baselines, switch power modes, cooling metrics, N+1 simulations and carbon accounting assumptions. Those checks are useful for Reducing network energy without weakening resiliency but do not isolate Preserving operations through organizational merger design. The right first evidence here is: Examine operating models, regional constraints, RACI decisions, exception records and coexistence diagrams.

D:

Examine feature drift, training provenance, false-positive rates, policy diffs, model approval and rollback results. Those checks are useful for Validating AI-based network assurance with human governance but do not isolate Preserving operations through organizational merger design. The right first evidence here is: Examine operating models, regional constraints, RACI decisions, exception records and coexistence diagrams.

Cisco Certified Design Expert (400-007) Practice Tests

Purchase Individually

  • Premium File

    349 Questions & Answers
    Last Update: Nov 16, 2026

    $76.99
    $69.99
  • Study Guide

    934 Pages

    $43.99
    $39.99

SPECIAL OFFER: GET 10% OFF
This is ONE TIME OFFER

You save
10%

Enter Your Email Address to Receive Your 10% Off Discount Code

SPECIAL OFFER: GET 10% OFF

You save
10%

Use Discount Code:

A confirmation link was sent to your e-mail.

Please check your mailbox for a message from support@examlabs.com and follow the directions.

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your email address below to get started with our interactive software demo of your free trial.

  • Realistic exam simulation and exam editor with preview functions
  • Whole exam in a single file with several different question types
  • Customizable exam-taking mode & detailed score reports