Pass CompTIA N10-009 Exam in First Attempt Easily
Real CompTIA N10-009 Exam Questions, Accurate & Verified Answers As Experienced in the Actual Test!

Verified by experts
3 products

You save $69.98

N10-009 Premium Bundle

  • Premium File 768 Questions & Answers
  • Last Update: Nov 23, 2026
  • Training Course 240 Lectures
  • Study Guide 128 Pages
$79.99 $149.97

Purchase Individually

  • Premium File

    768 Questions & Answers
    Last Update: Nov 23, 2026

    $76.99
    $69.99
  • Training Course

    240 Lectures

    $43.99
    $39.99
  • Study Guide

    128 Pages

    $43.99
    $39.99

CompTIA Network+ N10-009 Practice Test 27

Question 260

A disaster-recovery plan requires a fully provisioned standby site for rapid cutover, but the secondary site must not process ordinary production traffic before failover. After applying the correction (Prepare a hot standby disaster-recovery site with synchronized data and tested rapid activation; do not configure active-active production processing), which result BEST establishes the intended outcome?

  1. The secondary site can eventually purchase hardware after an outage.
  2. A simulated primary-site failure activates the prepared standby workload within the recovery objective while it was inactive beforehand.
  3. Both sites process half of normal production calls at the same time.
  4. The operator can identify the cold-site address in an inventory.

Explanation

Correct Answer

B:

A simulated primary-site failure activates the prepared standby workload within the recovery objective while it was inactive beforehand. This is directly diagnostic of the corrected problem because Hot standby facilities keep production-ready recovery capacity without needing both sites to process requests concurrently.

Incorrect Answers

A:

Future equipment acquisition does not prove the standby is already production-ready.

C:

Concurrent production traffic verifies active-active operation, not the requested standby-only state.

D:

An inventory address does not demonstrate a tested rapid standby workload activation.

Question 261

A low-priority archive service can wait days for recovery and cost must be minimized. Which action BEST resolves the specified operational need?

  1. Choose a cold recovery site with documented equipment and data restoration steps.
  2. Use a warm recovery site with partially prepared systems.
  3. Set the recovery time objective to at most two hours and design adequate recovery capacity.
  4. Use a suitably designed hot site or active-active capacity where the application supports it.

Explanation

Correct Answer

A:

Choose a cold recovery site with documented equipment and data restoration steps. This directly addresses the failure mechanism: Cold sites provide little immediately running infrastructure and take longer to activate. An appropriate confirmation would be: A rehearsal confirms recovery within the longer permitted window.

Incorrect Answers

B:

Warm sites balance readiness and cost between hot and cold sites. Cold sites provide little immediately running infrastructure and take longer to activate. The relevant repair is to choose a cold recovery site with documented equipment and data restoration steps.

C:

RTO expresses maximum acceptable recovery duration. That mechanism applies to a different operational situation and does not meet the stated requirement. Here, cold sites provide little immediately running infrastructure and take longer to activate; the specific corrective action is Choose a cold recovery site with documented equipment and data restoration steps.

D:

Hot sites maintain ready infrastructure for rapid recovery. That mechanism applies to a different operational situation and does not meet the stated requirement. Here, cold sites provide little immediately running infrastructure and take longer to activate; the specific corrective action is Choose a cold recovery site with documented equipment and data restoration steps.

Question 262

A low-priority archive service can wait days for recovery and cost must be minimized. Following the correction (Choose a cold recovery site with documented equipment and data restoration steps), which result BEST proves that this particular problem is resolved?

  1. A recovery drill validates the remaining configuration and restore steps.
  2. A timed failover exercise completes critical service restoration within two hours.
  3. A rehearsal confirms recovery within the longer permitted window.
  4. A controlled failover starts the workload at the secondary site within the short requirement.

Explanation

Correct Answer

C:

A rehearsal confirms recovery within the longer permitted window. This demonstrates the targeted outcome rather than a different network symptom. The underlying mechanism is: Cold sites provide little immediately running infrastructure and take longer to activate.

Incorrect Answers

A:

Warm sites balance readiness and cost between hot and cold sites. That observation does not establish this repair. Verify that a rehearsal confirms recovery within the longer permitted window.

B:

Rto expresses maximum acceptable recovery duration. The decisive check is that a rehearsal confirms recovery within the longer permitted window.

D:

Hot sites maintain ready infrastructure for rapid recovery. The decisive check is that a rehearsal confirms recovery within the longer permitted window.

Question 263

A business wants some staged recovery infrastructure without the expense of a fully live duplicate. Which action BEST resolves the specified operational need?

  1. Choose a cold recovery site with documented equipment and data restoration steps.
  2. Use a suitably designed hot site or active-active capacity where the application supports it.
  3. Use a warm recovery site with partially prepared systems.
  4. Specify a recovery point objective (RPO) no greater than fifteen minutes, with backups or replication meeting that threshold.

Explanation

Correct Answer

C:

Use a warm recovery site with partially prepared systems. This directly addresses the failure mechanism: Warm sites balance readiness and cost between hot and cold sites. An appropriate confirmation would be: A recovery drill validates the remaining configuration and restore steps.

Incorrect Answers

A:

Cold sites provide little immediately running infrastructure and take longer to activate. Warm sites balance readiness and cost between hot and cold sites. The relevant repair is to use a warm recovery site with partially prepared systems.

B:

Hot sites maintain ready infrastructure for rapid recovery. That mechanism applies to a different operational situation and does not meet the stated requirement. Here, warm sites balance readiness and cost between hot and cold sites; the specific corrective action is Use a warm recovery site with partially prepared systems.

D:

Recovery point objective measures tolerated data loss in time, not how long restarting the service takes. This alternative does not correct the specific problem (a business wants some staged recovery infrastructure without the expense of a fully live duplicate). The required action is Use a warm recovery site with partially prepared systems.

Question 264

A business wants some staged recovery infrastructure without the expense of a fully live duplicate. Following the correction (Use a warm recovery site with partially prepared systems), which result BEST proves that this particular problem is resolved?

  1. A rehearsal confirms recovery within the longer permitted window.
  2. A controlled failover starts the workload at the secondary site within the short requirement.
  3. A recovery drill validates the remaining configuration and restore steps.
  4. A restored dataset contains all transactions except those within at most the final fifteen minutes before disruption.

Explanation

Correct Answer

C:

A recovery drill validates the remaining configuration and restore steps. This demonstrates the targeted outcome rather than a different network symptom. The underlying mechanism is: Warm sites balance readiness and cost between hot and cold sites.

Incorrect Answers

A:

Cold sites provide little immediately running infrastructure and take longer to activate. That observation does not establish this repair. Verify that a recovery drill validates the remaining configuration and restore steps.

B:

Hot sites maintain ready infrastructure for rapid recovery. The decisive check is that a recovery drill validates the remaining configuration and restore steps.

D:

Recovery point objective measures tolerated data loss in time, not how long restarting the service takes. This alternative observation is not sufficient. The required direct observation is A recovery drill validates the remaining configuration and restore steps.

Question 265

Two core devices are already serving live production flows simultaneously, and either must absorb the other's traffic upon failure without changing that active-active operating model. Which action BEST resolves the specific problem?

  1. Disable one core during normal operation and treat it as an unpowered hot spare.
  2. Build a cold disaster recovery site that requires hardware provisioning after failure.
  3. Set a recovery-time goal without allocating extra failover processing headroom.
  4. Size and configure active-active core redundancy so each active node can absorb failover load, not a powered-off disaster-recovery standby.

Explanation

Correct Answer

D:

Size and configure active-active core redundancy so each active node can absorb failover load, not a powered-off disaster-recovery standby. This is decisive because Active-active redundancy entails concurrent operation with adequate failure capacity, unlike standby or cold-site recovery. Check the result using: Both cores carry production flows normally; after one is disabled the other absorbs traffic within the stated performance target.

Incorrect Answers

A:

A powered-off backup does not preserve the stated active-active requirement that both nodes ordinarily serve users.

B:

Cold-site restoration is too slow and is not concurrent core forwarding.

C:

A documented RTO alone does not provide the surviving active node with necessary traffic capacity.

Question 266

Two core devices are already serving live production flows simultaneously, and either must absorb the other's traffic upon failure without changing that active-active operating model. After applying the correction (Size and configure active-active core redundancy so each active node can absorb failover load, not a powered-off disaster-recovery standby), which result BEST establishes the intended outcome?

  1. The second core is powered off until disaster operations activate it.
  2. Both cores carry production flows normally; after one is disabled the other absorbs traffic within the stated performance target.
  3. Equipment can be shipped to the failed site within a week.
  4. Both cores show 50 percent load while the surviving one overloads and drops traffic upon failure.

Explanation

Correct Answer

B:

Both cores carry production flows normally; after one is disabled the other absorbs traffic within the stated performance target. This is directly diagnostic of the corrected problem because Active-active redundancy entails concurrent operation with adequate failure capacity, unlike standby or cold-site recovery.

Incorrect Answers

A:

This confirms standby behavior, not concurrent active forwarding.

C:

Future replacement lead time cannot validate immediate active-active core survival.

D:

Normal load sharing without failover headroom fails the required surviving-core capacity.

Question 267

Managers want to rehearse incident responsibilities before authorizing a disruptive failover test. Which action BEST resolves the specified operational need?

  1. Run a tabletop disaster-recovery exercise with defined decision roles.
  2. Set the recovery time objective to at most two hours and design adequate recovery capacity.
  3. Use a warm recovery site with partially prepared systems.
  4. Set the recovery point objective to fifteen minutes or less and implement matching data protection.

Explanation

Correct Answer

A:

Run a tabletop disaster-recovery exercise with defined decision roles. This directly addresses the failure mechanism: Tabletops test procedures and coordination rather than actual recovery performance. An appropriate confirmation would be: Participants record escalation, responsibilities and gaps without disrupting live workloads.

Incorrect Answers

B:

RTO expresses maximum acceptable recovery duration. That mechanism applies to a different operational situation and does not meet the stated requirement. Here, tabletops test procedures and coordination rather than actual recovery performance; the specific corrective action is Run a tabletop disaster-recovery exercise with defined decision roles.

C:

Warm sites balance readiness and cost between hot and cold sites. Tabletops test procedures and coordination rather than actual recovery performance. The relevant repair is to run a tabletop disaster-recovery exercise with defined decision roles.

D:

RPO expresses tolerable data loss in time. That mechanism applies to a different operational situation and does not meet the stated requirement. Here, tabletops test procedures and coordination rather than actual recovery performance; the specific corrective action is Run a tabletop disaster-recovery exercise with defined decision roles.

Question 268

Managers want to rehearse incident responsibilities before authorizing a disruptive failover test. Following the correction (Run a tabletop disaster-recovery exercise with defined decision roles), which result BEST proves that this particular problem is resolved?

  1. Participants record escalation, responsibilities and gaps without disrupting live workloads.
  2. A timed failover exercise completes critical service restoration within two hours.
  3. A recovery drill validates the remaining configuration and restore steps.
  4. A restore test proves recoverable data is no older than the defined RPO.

Explanation

Correct Answer

A:

Participants record escalation, responsibilities and gaps without disrupting live workloads. This demonstrates the targeted outcome rather than a different network symptom. The underlying mechanism is: Tabletops test procedures and coordination rather than actual recovery performance.

Incorrect Answers

B:

Rto expresses maximum acceptable recovery duration. The decisive check is that participants record escalation, responsibilities and gaps without disrupting live workloads.

C:

Warm sites balance readiness and cost between hot and cold sites. That observation does not establish this repair. Verify that participants record escalation, responsibilities and gaps without disrupting live workloads.

D:

Rpo expresses tolerable data loss in time. The decisive check is that participants record escalation, responsibilities and gaps without disrupting live workloads.

Question 269

Operations wants to quantify average time needed to repair outages over a quarter. Which action BEST resolves the specified operational need?

  1. Set the recovery time objective to at most two hours and design adequate recovery capacity.
  2. Set the recovery point objective to fifteen minutes or less and implement matching data protection.
  3. Calculate and track mean time to repair from recorded incidents.
  4. Use a warm recovery site with partially prepared systems.

Explanation

Correct Answer

C:

Calculate and track mean time to repair from recorded incidents. This directly addresses the failure mechanism: MTTR summarizes average restoration duration for recorded failures. An appropriate confirmation would be: Service records show measured repair durations and the resulting average.

Incorrect Answers

A:

RTO expresses maximum acceptable recovery duration. That mechanism applies to a different operational situation and does not meet the stated requirement. Here, mttr summarizes average restoration duration for recorded failures; the specific corrective action is Calculate and track mean time to repair from recorded incidents.

B:

RPO expresses tolerable data loss in time. That mechanism applies to a different operational situation and does not meet the stated requirement. Here, mttr summarizes average restoration duration for recorded failures; the specific corrective action is Calculate and track mean time to repair from recorded incidents.

D:

Warm sites balance readiness and cost between hot and cold sites. MTTR summarizes average restoration duration for recorded failures. The relevant repair is to calculate and track mean time to repair from recorded incidents.

Question 270

Operations wants to quantify average time needed to repair outages over a quarter. Following the correction (Calculate and track mean time to repair from recorded incidents), which result BEST proves that this particular problem is resolved?

  1. A timed failover exercise completes critical service restoration within two hours.
  2. A restore test proves recoverable data is no older than the defined RPO.
  3. A recovery drill validates the remaining configuration and restore steps.
  4. Service records show measured repair durations and the resulting average.

Explanation

Correct Answer

D:

Service records show measured repair durations and the resulting average. This demonstrates the targeted outcome rather than a different network symptom. The underlying mechanism is: MTTR summarizes average restoration duration for recorded failures.

Incorrect Answers

A:

Rto expresses maximum acceptable recovery duration. The decisive check is that service records show measured repair durations and the resulting average.

B:

Rpo expresses tolerable data loss in time. The decisive check is that service records show measured repair durations and the resulting average.

C:

Warm sites balance readiness and cost between hot and cold sites. That observation does not establish this repair. Verify that service records show measured repair durations and the resulting average.

CompTIA Network+ (N10-009) Practice Tests

Purchase Individually

  • Premium File

    768 Questions & Answers
    Last Update: Nov 23, 2026

    $76.99
    $69.99
  • Training Course

    240 Lectures

    $43.99
    $39.99
  • Study Guide

    128 Pages

    $43.99
    $39.99

SPECIAL OFFER: GET 10% OFF
This is ONE TIME OFFER

You save
10%

Enter Your Email Address to Receive Your 10% Off Discount Code

SPECIAL OFFER: GET 10% OFF

You save
10%

Use Discount Code:

A confirmation link was sent to your e-mail.

Please check your mailbox for a message from support@examlabs.com and follow the directions.

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your email address below to get started with our interactive software demo of your free trial.

  • Realistic exam simulation and exam editor with preview functions
  • Whole exam in a single file with several different question types
  • Customizable exam-taking mode & detailed score reports