Pass VMware 2V0-17.25 Exam in First Attempt Easily
Real VMware 2V0-17.25 Exam Questions, Accurate & Verified Answers As Experienced in the Actual Test!

Verified by experts
2 products

You save $34.99

2V0-17.25 Premium Bundle

  • Premium File 100 Questions & Answers
  • Last Update: Nov 9, 2026
  • Study Guide 121 Pages
$74.99 $109.98

Purchase Individually

  • Premium File

    100 Questions & Answers
    Last Update: Nov 9, 2026

    $76.99
    $69.99
  • Study Guide

    121 Pages

    $43.99
    $39.99

VMware Cloud Foundation 9.0 Administrator 2V0-17.25 Practice Test 18

Question 170

An engineer wants to enforce east-west access controls between application tiers without changing every physical switch. What should the VCF administrator do first to address this exact problem?

  1. Choose the network gateway and edge functions appropriate to provider connectivity.
  2. Apply supported NSX distributed security policy at workload network boundaries.
  3. Use the appropriate vSphere virtual switch and port groups for VM host connectivity.
  4. Keep host-level distributed switching separate from NSX logical segmentation and gateway services.

Explanation

Correct Answer

B:

Apply supported NSX distributed security policy at workload network boundaries. This directly addresses the case because software-defined distributed security can isolate VM traffic independently of changes to external routers. The acceptance test is: only the approved app-to-database flow passes while an unauthorized lateral flow is denied.

Incorrect Answers

A:

Choose the network gateway and edge functions appropriate to provider connectivity. This is an appropriate step when a provider needs externally connected tenant networks with controlled north-south routing and shared service boundaries. It does not resolve the specific requirement here: software-defined distributed security can isolate VM traffic independently of changes to external routers.

C:

Use the appropriate vSphere virtual switch and port groups for VM host connectivity. This is an appropriate step when a team needs to provide virtual machines with layer-two connectivity on ESX hosts and confuses NSX gateways with the basic host switching layer. It does not resolve the specific requirement here: software-defined distributed security can isolate VM traffic independently of changes to external routers.

D:

Keep host-level distributed switching separate from NSX logical segmentation and gateway services. This is an appropriate step when operations wants to compare the role of a distributed switch with that of an NSX overlay network. It does not resolve the specific requirement here: software-defined distributed security can isolate VM traffic independently of changes to external routers.

Question 171

A new datastore appears in inventory but the storage dashboard attributes its capacity to the wrong cluster. Which result is the best acceptance evidence for the intended configuration?

  1. The projection includes the agreed growth window and reserve requirement.
  2. The affected object reaches policy compliance after repair, with a matching health status.
  3. The corrected view shows the datastore under its actual owning infrastructure.
  4. The measured device or datastore latency explains the observed guest response delay.

Explanation

Correct Answer

C:

The corrected view shows the datastore under its actual owning infrastructure. This directly tests the intended result of correct the object relationship or collection scope before trusting the storage report. The causal reason is that storage reports depend on accurate cluster-to-datastore inventory association.

Incorrect Answers

A:

The projection includes the agreed growth window and reserve requirement. This verifies a different problem: a storage administrator needs to forecast when vSAN capacity will be exhausted at its present growth rate. It would not demonstrate this case's requirement: storage reports depend on accurate cluster-to-datastore inventory association.

B:

The affected object reaches policy compliance after repair, with a matching health status. This verifies a different problem: an operator sees a vSAN object as accessible but its protection policy reports reduced compliance. It would not demonstrate this case's requirement: storage reports depend on accurate cluster-to-datastore inventory association.

D:

The measured device or datastore latency explains the observed guest response delay. This verifies a different problem: a database workload reports high disk response times and the team cannot distinguish guest pressure from datastore contention. It would not demonstrate this case's requirement: storage reports depend on accurate cluster-to-datastore inventory association.

Question 172

Security wants an explicit separation between provider control networks and tenant workloads served by Automation. Which administration decision most directly meets the stated requirement?

  1. Configure an approved provider egress path with required routing, translation and policy.
  2. Design nonconflicting or properly isolated provider network and routing contexts.
  3. Correct the gateway and upstream routing dependencies in the provider network.
  4. Define separate provider management and tenant network boundaries with only allowed crossings.

Explanation

Correct Answer

D:

Define separate provider management and tenant network boundaries with only allowed crossings. This directly addresses the case because provider infrastructure administration should not be reachable from ordinary tenant application networks. The acceptance test is: tenant test traffic cannot access protected provider management services.

Incorrect Answers

A:

Configure an approved provider egress path with required routing, translation and policy. This is an appropriate step when an organization asks for internet egress but its provider-level network has no valid NAT or upstream path. It does not resolve the specific requirement here: provider infrastructure administration should not be reachable from ordinary tenant application networks.

B:

Design nonconflicting or properly isolated provider network and routing contexts. This is an appropriate step when a provider publishes overlapping address pools to different tenant gateways without any independent routing separation. It does not resolve the specific requirement here: provider infrastructure administration should not be reachable from ordinary tenant application networks.

C:

Correct the gateway and upstream routing dependencies in the provider network. This is an appropriate step when a provider network was created but the backing NSX gateway fails to advertise its external prefixes. It does not resolve the specific requirement here: provider infrastructure administration should not be reachable from ordinary tenant application networks.

Question 173

A tenant admin wants to delete a project that still owns active VMs and wonders why cleanup is blocked. What should the administrator verify before considering the proposed remediation successful?

  1. The project is removed after its resources are safely decommissioned or reassigned.
  2. The developer can access the assigned project and cannot change provider-level settings.
  3. The request succeeds only when its resource demand fits the approved available quota.
  4. The colleague can perform allowed organization tasks during the window and is denied afterward.

Explanation

Correct Answer

A:

The project is removed after its resources are safely decommissioned or reassigned. This directly tests the intended result of review and remove or reassign project-owned resources before deleting the project. The causal reason is that project lifecycle management must account for resources whose ownership would otherwise become orphaned.

Incorrect Answers

B:

The developer can access the assigned project and cannot change provider-level settings. This verifies a different problem: an organization admin needs to add a developer to one project without granting the user provider control. It would not demonstrate this case's requirement: project lifecycle management must account for resources whose ownership would otherwise become orphaned.

C:

The request succeeds only when its resource demand fits the approved available quota. This verifies a different problem: a tenant reaches its quota and wants to know why its latest VM request was denied. It would not demonstrate this case's requirement: project lifecycle management must account for resources whose ownership would otherwise become orphaned.

D:

The colleague can perform allowed organization tasks during the window and is denied afterward. This verifies a different problem: an administrator needs to grant one colleague organization admin rights temporarily during maintenance. It would not demonstrate this case's requirement: project lifecycle management must account for resources whose ownership would otherwise become orphaned.

Question 174

A new vSAN cluster has hosts ready but their vSAN VMkernel interfaces are on different unreachable VLANs. Which administration decision most directly meets the stated requirement?

  1. Resolve the hardware compatibility issue before claiming the cluster ready.
  2. Restore required vSAN VMkernel connectivity across the participating hosts.
  3. Align the end-to-end vSAN networking parameters and verify reachability.
  4. Size usable capacity with policy overhead and operational headroom before admitting workloads.

Explanation

Correct Answer

B:

Restore required vSAN VMkernel connectivity across the participating hosts. This directly addresses the case because vSAN depends on reliable east-west host communication to form a healthy distributed datastore. The acceptance test is: the hosts join the intended vSAN cluster and pass network and disk health checks.

Incorrect Answers

A:

Resolve the hardware compatibility issue before claiming the cluster ready. This is an appropriate step when a vSAN deployment includes a host with unsupported storage firmware and the team wants to ignore the compatibility warning. It does not resolve the specific requirement here: vSAN depends on reliable east-west host communication to form a healthy distributed datastore.

C:

Align the end-to-end vSAN networking parameters and verify reachability. This is an appropriate step when a new vSAN cluster is technically formed but one host uses markedly different MTU settings from the other nodes. It does not resolve the specific requirement here: vSAN depends on reliable east-west host communication to form a healthy distributed datastore.

D:

Size usable capacity with policy overhead and operational headroom before admitting workloads. This is an appropriate step when an administrator enables vSAN on a cluster without leaving capacity for maintenance and future component rebuilds. It does not resolve the specific requirement here: vSAN depends on reliable east-west host communication to form a healthy distributed datastore.

Question 175

A new workload domain uses vSAN but its proposed storage policy requires more fault domains than its selected hosts provide. Which result is the best acceptance evidence for the intended configuration?

  1. All intended hosts mount the datastore and the domain operates with the approved storage.
  2. All targeted objects report compliance and storage repair activity reaches the expected steady state.
  3. A protected VM's storage object becomes policy compliant within the new workload domain.
  4. The revised plan preserves required availability and adequate free space after representative growth.

Explanation

Correct Answer

C:

A protected VM's storage object becomes policy compliant within the new workload domain. This directly tests the intended result of match the policy and host failure-domain design before placing protected VMs. The causal reason is that policy-based availability cannot be satisfied with insufficient eligible storage placement locations.

Incorrect Answers

A:

All intended hosts mount the datastore and the domain operates with the approved storage. This verifies a different problem: an administrator wants to use existing supported NFS storage for a domain but assumes that vSAN is mandatory for every VCF cluster. It would not demonstrate this case's requirement: policy-based availability cannot be satisfied with insufficient eligible storage placement locations.

B:

All targeted objects report compliance and storage repair activity reaches the expected steady state. This verifies a different problem: an administrator changes a vSAN policy for a newly created domain while resynchronization and repairs are still running. It would not demonstrate this case's requirement: policy-based availability cannot be satisfied with insufficient eligible storage placement locations.

D:

The revised plan preserves required availability and adequate free space after representative growth. This verifies a different problem: a vSAN workload domain runs low on usable capacity after selecting a high-redundancy policy for every VM. It would not demonstrate this case's requirement: policy-based availability cannot be satisfied with insufficient eligible storage placement locations.

Question 176

The application architect proposes a VI workload domain but cannot specify its intended vCenter, host pool or storage access. What should the VCF administrator do first to address this exact problem?

  1. Use the supported VCF Operations import workflow for the VI workload domain.
  2. Complete host, networking and storage readiness checks before the workload-domain wizard.
  3. Create an appropriately planned VI workload domain with separate compute and policy ownership.
  4. Document the intended VI domain composition and service responsibilities before creation.

Explanation

Correct Answer

D:

Document the intended VI domain composition and service responsibilities before creation. This directly addresses the case because a domain is a managed collection of specific infrastructure, not an unbounded tenant label. The acceptance test is: the deployed domain inventory matches the approved cluster and storage design.

Incorrect Answers

A:

Use the supported VCF Operations import workflow for the VI workload domain. This is an appropriate step when a customer is importing a qualifying legacy vCenter into an existing VCF instance and wants the imported clusters managed as another domain. It does not resolve the specific requirement here: a domain is a managed collection of specific infrastructure, not an unbounded tenant label.

B:

Complete host, networking and storage readiness checks before the workload-domain wizard. This is an appropriate step when an operator attempts to create a new workload domain using hosts that have not met compatibility and network prerequisites. It does not resolve the specific requirement here: a domain is a managed collection of specific infrastructure, not an unbounded tenant label.

C:

Create an appropriately planned VI workload domain with separate compute and policy ownership. This is an appropriate step when a company wants to isolate a regulated application cluster from ordinary tenant compute while keeping common VCF management. It does not resolve the specific requirement here: a domain is a managed collection of specific infrastructure, not an unbounded tenant label.

Question 177

An administrator prepares a trend report but accidentally uses a one-hour window for a quarterly forecast. What should the VCF administrator do first to address this exact problem?

  1. Correct the view's aggregation and report time horizon to match the business question.
  2. Build a VCF Operations report from relevant views and schedule its delivery.
  3. Configure report access and destination consistent with the authorized recipients.
  4. Use a filtered custom view to examine current object metrics and properties.

Explanation

Correct Answer

A:

Correct the view's aggregation and report time horizon to match the business question. This directly addresses the case because a correctly selected metric can still mislead when sampled over the wrong duration. The acceptance test is: the regenerated report reflects the complete approved quarterly observation period.

Incorrect Answers

B:

Build a VCF Operations report from relevant views and schedule its delivery. This is an appropriate step when a manager wants an automatic monthly summary of cluster capacity and storage growth. It does not resolve the specific requirement here: a correctly selected metric can still mislead when sampled over the wrong duration.

C:

Configure report access and destination consistent with the authorized recipients. This is an appropriate step when operations wants a compliance report shared with a security group but must not expose it to every tenant. It does not resolve the specific requirement here: a correctly selected metric can still mislead when sampled over the wrong duration.

D:

Use a filtered custom view to examine current object metrics and properties. This is an appropriate step when an analyst needs one-time troubleshooting details rather than a recurring executive document. It does not resolve the specific requirement here: a correctly selected metric can still mislead when sampled over the wrong duration.

Question 178

A dashboard shows storage capacity for all environments and operators cannot focus on one affected cluster. After implementing the corrective approach, which observation most directly proves the requirement is met?

  1. Known production activity is reflected while unrelated development values are excluded.
  2. Selecting a cluster updates the relevant capacity and latency widgets consistently.
  3. The dashboard shows the chosen service performance trend for the complete period.
  4. Each widget returns actual expected values for a known test object.

Explanation

Correct Answer

B:

Selecting a cluster updates the relevant capacity and latency widgets consistently. This directly tests the intended result of add a useful object selector or scope interaction for the dashboard widgets. The causal reason is that interactive scope helps responders correlate signals from one target rather than unrelated estates.

Incorrect Answers

A:

Known production activity is reflected while unrelated development values are excluded. This verifies a different problem: a team copied a dashboard from a development fleet and its production widgets still point to the old environment. It would not demonstrate this case's requirement: interactive scope helps responders correlate signals from one target rather than unrelated estates.

C:

The dashboard shows the chosen service performance trend for the complete period. This verifies a different problem: management wants to see weekly SLO-style trends while the current dashboard only displays instantaneous CPU values. It would not demonstrate this case's requirement: interactive scope helps responders correlate signals from one target rather than unrelated estates.

D:

Each widget returns actual expected values for a known test object. This verifies a different problem: an engineer builds a dashboard with ten attractive widgets but no data source is associated with its storage health chart. It would not demonstrate this case's requirement: interactive scope helps responders correlate signals from one target rather than unrelated estates.

Question 179

A datastore is nearing capacity because virtual disks were thin provisioned without monitoring actual consumed space. What should the VCF administrator do first to address this exact problem?

  1. Use unique storage identifiers and verify device-to-datastore mapping before placement.
  2. Perform the appropriate storage-adapter rescan and confirm consistent device discovery.
  3. Track physical datastore usage, reclaim eligible unused blocks and plan capacity before an out-of-space condition.
  4. Configure the approved NFS endpoint and equivalent mount access for all eligible hosts.

Explanation

Correct Answer

C:

Track physical datastore usage, reclaim eligible unused blocks and plan capacity before an out-of-space condition. This directly addresses the case because thin provisioned disks can grow toward their configured maximum and exhaust real backing capacity. The acceptance test is: allocated space and free-capacity trends remain safe during a representative workload growth test.

Incorrect Answers

A:

Use unique storage identifiers and verify device-to-datastore mapping before placement. This is an appropriate step when two teams create identically named VMFS datastores on unrelated arrays, confusing storage selection during provisioning. It does not resolve the specific requirement here: thin provisioned disks can grow toward their configured maximum and exhaust real backing capacity.

B:

Perform the appropriate storage-adapter rescan and confirm consistent device discovery. This is an appropriate step when an administrator adds a LUN to two ESX hosts but forgets to rescan the storage adapters. It does not resolve the specific requirement here: thin provisioned disks can grow toward their configured maximum and exhaust real backing capacity.

D:

Configure the approved NFS endpoint and equivalent mount access for all eligible hosts. This is an appropriate step when a new shared NFS datastore is mounted from one ESX host but other cluster hosts use inconsistent server addresses. It does not resolve the specific requirement here: thin provisioned disks can grow toward their configured maximum and exhaust real backing capacity.

Question 180

Finance wants to know which project consumed a set of private-cloud VMs rather than relying on host owner names. Which administration decision most directly meets the stated requirement?

  1. Use version-controlled automation content or templates available through the VCF Automation catalog.
  2. Use automation governance and extensibility for policy-bound request workflows.
  3. Publish governed VM catalog offerings through VCF Automation.
  4. Track VCF Automation organization and project resource allocation as part of the consumption model.

Explanation

Correct Answer

D:

Track VCF Automation organization and project resource allocation as part of the consumption model. This directly addresses the case because tenant and project association provide accountable ownership for provisioned resources. The acceptance test is: a resource inventory associates the VMs with the correct organization and project.

Incorrect Answers

A:

Use version-controlled automation content or templates available through the VCF Automation catalog. This is an appropriate step when an operations team wants all new applications deployed from repeatable infrastructure definitions rather than manual VM clicks. It does not resolve the specific requirement here: tenant and project association provide accountable ownership for provisioned resources.

B:

Use automation governance and extensibility for policy-bound request workflows. This is an appropriate step when a security group needs approval steps for high-risk infrastructure requests without forcing every normal request through email. It does not resolve the specific requirement here: tenant and project association provide accountable ownership for provisioned resources.

C:

Publish governed VM catalog offerings through VCF Automation. This is an appropriate step when developers wait days for administrators to clone approved VM images and want self-service requests with enforced limits. It does not resolve the specific requirement here: tenant and project association provide accountable ownership for provisioned resources.

VMware Cloud Foundation 9.0 Administrator (2V0-17.25) Practice Tests

Purchase Individually

  • Premium File

    100 Questions & Answers
    Last Update: Nov 9, 2026

    $76.99
    $69.99
  • Study Guide

    121 Pages

    $43.99
    $39.99

SPECIAL OFFER: GET 10% OFF
This is ONE TIME OFFER

You save
10%

Enter Your Email Address to Receive Your 10% Off Discount Code

SPECIAL OFFER: GET 10% OFF

You save
10%

Use Discount Code:

A confirmation link was sent to your e-mail.

Please check your mailbox for a message from support@examlabs.com and follow the directions.

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your email address below to get started with our interactive software demo of your free trial.

  • Realistic exam simulation and exam editor with preview functions
  • Whole exam in a single file with several different question types
  • Customizable exam-taking mode & detailed score reports