Pass VMware 2V0-17.25 Exam in First Attempt Easily
Real VMware 2V0-17.25 Exam Questions, Accurate & Verified Answers As Experienced in the Actual Test!

Verified by experts
2 products

You save $34.99

2V0-17.25 Premium Bundle

  • Premium File 100 Questions & Answers
  • Last Update: Nov 9, 2026
  • Study Guide 121 Pages
$74.99 $109.98

Purchase Individually

  • Premium File

    100 Questions & Answers
    Last Update: Nov 9, 2026

    $76.99
    $69.99
  • Study Guide

    121 Pages

    $43.99
    $39.99

VMware Cloud Foundation 9.0 Administrator 2V0-17.25 Practice Test 36

Question 350

A maintenance window requires taking one host out of service without switching off movable production VMs. Which result is the best acceptance evidence for the intended configuration?

  1. A controlled host failure restarts the protected VM on a surviving eligible host.
  2. The host enters maintenance mode with supported VMs relocated to other hosts.
  3. The cluster passes a one-host capacity assessment and critical VMs restart in a failure exercise.
  4. A test live migration succeeds between eligible hosts after the compatible baseline is established.

Explanation

Correct Answer

B:

The host enters maintenance mode with supported VMs relocated to other hosts. This directly tests the intended result of place the host into maintenance mode and let compatible migrations evacuate its VMs. The causal reason is that maintenance mode coordinates evacuation before hardware service rather than forcing abrupt VM outages.

Incorrect Answers

A:

A controlled host failure restarts the protected VM on a surviving eligible host. This verifies a different problem: a cluster should automatically restart VMs after one ESX host fails rather than rely on an operator to power them back on. It would not demonstrate this case's requirement: maintenance mode coordinates evacuation before hardware service rather than forcing abrupt VM outages.

C:

The cluster passes a one-host capacity assessment and critical VMs restart in a failure exercise. This verifies a different problem: a three-host cluster can run its normal load but lacks enough spare capacity to recover critical VMs after losing one host. It would not demonstrate this case's requirement: maintenance mode coordinates evacuation before hardware service rather than forcing abrupt VM outages.

D:

A test live migration succeeds between eligible hosts after the compatible baseline is established. This verifies a different problem: a mixed-generation CPU cluster fails live migrations because certain processor instructions differ across hosts. It would not demonstrate this case's requirement: maintenance mode coordinates evacuation before hardware service rather than forcing abrupt VM outages.

Question 351

A company wants one operations plane to govern multiple VCF instances without deploying separate operations services for every instance. Which configuration change is the strongest fit for these constraints?

  1. Include distinct NSX management and relevant edge/gateway networking functions in the design.
  2. Use VCF Installer for initial deployment and VCF Operations for fleet management after deployment.
  3. Design VCF instances as part of a fleet served by its shared VCF Operations and Automation components.
  4. Distinguish the VCF instance, management domain, VI workload domains and their registered vCenter components.

Explanation

Correct Answer

C:

Design VCF instances as part of a fleet served by its shared VCF Operations and Automation components. This directly addresses the case because fleet services enable common management of multiple VCF instances under a planned architecture. The acceptance test is: two instances are visible under the intended fleet management inventory and shared service boundaries.

Incorrect Answers

A:

Include distinct NSX management and relevant edge/gateway networking functions in the design. This is an appropriate step when an engineer treats the NSX management appliance as interchangeable with the network edge and expects it to forward tenant traffic directly. It does not resolve the specific requirement here: fleet services enable common management of multiple VCF instances under a planned architecture.

B:

Use VCF Installer for initial deployment and VCF Operations for fleet management after deployment. This is an appropriate step when a platform operator confuses the appliance used for initial VCF 9.0 deployment with the interface used for fleet day-two management. It does not resolve the specific requirement here: fleet services enable common management of multiple VCF instances under a planned architecture.

D:

Distinguish the VCF instance, management domain, VI workload domains and their registered vCenter components. This is an appropriate step when an administrator assumes a workload domain and a standalone vCenter are the same management boundary. It does not resolve the specific requirement here: fleet services enable common management of multiple VCF instances under a planned architecture.

Question 352

A team assumes that every advanced service and external add-on always uses exactly the same licensing mechanism as VCF base components. Which administration decision most directly meets the stated requirement?

  1. Review the appropriate vSAN TiB entitlement and usage through centralized licensing.
  2. Compare actual host consumption and the central licensing counters before changing capacity plans.
  3. Use the supported central VCF 9 license-file workflow for the applicable stack components.
  4. Identify which services are included in the central license file and which retain separate entitlements.

Explanation

Correct Answer

D:

Identify which services are included in the central license file and which retain separate entitlements. This directly addresses the case because advanced services and some add-ons have product-specific entitlement behavior and should not be inferred from the base stack. The acceptance test is: each installed product has an applicable and valid entitlement recorded using its required mechanism.

Incorrect Answers

A:

Review the appropriate vSAN TiB entitlement and usage through centralized licensing. This is an appropriate step when finance wants to add extra vSAN storage capacity to its licensed private cloud and is unsure how that consumption is recorded. It does not resolve the specific requirement here: advanced services and some add-ons have product-specific entitlement behavior and should not be inferred from the base stack.

B:

Compare actual host consumption and the central licensing counters before changing capacity plans. This is an appropriate step when after adding many hosts the operator sees a capacity alarm but cannot tell whether the issue is compute resources or licensed quantity. It does not resolve the specific requirement here: advanced services and some add-ons have product-specific entitlement behavior and should not be inferred from the base stack.

C:

Use the supported central VCF 9 license-file workflow for the applicable stack components. This is an appropriate step when an operator applies an old style per-component 25-character key to a VCF 9.0 fleet and gets unexpected license status. It does not resolve the specific requirement here: advanced services and some add-ons have product-specific entitlement behavior and should not be inferred from the base stack.

Question 353

A security team needs to add a CMDB record whenever a governed self-service machine is provisioned. Which configuration change is the strongest fit for these constraints?

  1. Connect the provisioning event to a supported automation action that updates the CMDB.
  2. Trigger an approved event-driven extensibility workflow for the deletion event.
  3. Use scoped secret or identity management for external integration credentials.
  4. Use a scoped VCF Automation extensibility or approval workflow for the high-memory request.

Explanation

Correct Answer

A:

Connect the provisioning event to a supported automation action that updates the CMDB. This directly addresses the case because lifecycle events can synchronize deployed resources with business inventory systems. The acceptance test is: a newly provisioned VM has a corresponding correct CMDB entry after the automation finishes.

Incorrect Answers

B:

Trigger an approved event-driven extensibility workflow for the deletion event. This is an appropriate step when a company wants a service ticket opened automatically when an organization deletes a production deployment. It does not resolve the specific requirement here: lifecycle events can synchronize deployed resources with business inventory systems.

C:

Use scoped secret or identity management for external integration credentials. This is an appropriate step when a provider wants an automation action to call an outside API but developers propose storing a permanent admin token in the blueprint. It does not resolve the specific requirement here: lifecycle events can synchronize deployed resources with business inventory systems.

D:

Use a scoped VCF Automation extensibility or approval workflow for the high-memory request. This is an appropriate step when a finance policy requires manager approval when a requested VM exceeds an approved memory size. It does not resolve the specific requirement here: lifecycle events can synchronize deployed resources with business inventory systems.

Question 354

A management team fears that rotating all fleet certificates simultaneously could interrupt administrative access. Which administration decision most directly meets the stated requirement?

  1. Use centralized certificate status and supported renewal workflows in VCF Operations.
  2. Stage certificate updates according to dependencies with a tested fallback plan.
  3. Restore valid identity-related certificate trust rather than changing unrelated user credentials.
  4. Verify name, SAN entries and trust chain before activating the replacement certificate.

Explanation

Correct Answer

B:

Stage certificate updates according to dependencies with a tested fallback plan. This directly addresses the case because coordinated rotations reduce risk of broken mutual trust when components depend on one another. The acceptance test is: management APIs remain accessible during the supported staged certificate update.

Incorrect Answers

A:

Use centralized certificate status and supported renewal workflows in VCF Operations. This is an appropriate step when multiple VCF appliances have certificates expiring next month and the team has no coordinated renewal process. It does not resolve the specific requirement here: coordinated rotations reduce risk of broken mutual trust when components depend on one another.

C:

Restore valid identity-related certificate trust rather than changing unrelated user credentials. This is an appropriate step when an expired identity certificate prevents SSO logins and administrators are trying to fix the issue by resetting all user passwords. It does not resolve the specific requirement here: coordinated rotations reduce risk of broken mutual trust when components depend on one another.

D:

Verify name, SAN entries and trust chain before activating the replacement certificate. This is an appropriate step when an operator attempts to rotate a certificate without checking its associated hostname and causes browser trust errors. It does not resolve the specific requirement here: coordinated rotations reduce risk of broken mutual trust when components depend on one another.

Question 355

A contractor's identity remains active in an external directory after a project ends, but the company assumes its local role list is enough. Which result is the best acceptance evidence for the intended configuration?

  1. An org admin edits approved organization content but is blocked from changing another organization's provider network.
  2. An authorized federated user signs in to the intended services and a removed user is denied access.
  3. A revoked contractor account cannot authenticate or exercise previously granted fleet permissions.
  4. Permission tests confirm the operator can manage the assigned domain but not another team's resources.

Explanation

Correct Answer

C:

A revoked contractor account cannot authenticate or exercise previously granted fleet permissions. This directly tests the intended result of revoke identity-provider access and remove relevant VCF role bindings as part of offboarding. The causal reason is that federated access governance requires both identity state and local authorization policy to be correct.

Incorrect Answers

A:

An org admin edits approved organization content but is blocked from changing another organization's provider network. This verifies a different problem: tenant administrators need to manage their organization's application catalog without acquiring provider-level infrastructure privileges. It would not demonstrate this case's requirement: federated access governance requires both identity state and local authorization policy to be correct.

B:

An authorized federated user signs in to the intended services and a removed user is denied access. This verifies a different problem: a company wants one external identity provider to authenticate authorized administrators to supported VCF management components. It would not demonstrate this case's requirement: federated access governance requires both identity state and local authorization policy to be correct.

D:

Permission tests confirm the operator can manage the assigned domain but not another team's resources. This verifies a different problem: an administrator applies a broad fleet-wide role because one operator needs privileges on only one workload domain. It would not demonstrate this case's requirement: federated access governance requires both identity state and local authorization policy to be correct.

Question 356

A customer-facing application has periodic errors that coincide with storage contention on one cluster. What approach best resolves the identified gap?

  1. Collect and correlate supported application or guest metrics with infrastructure telemetry.
  2. Group the application components into the appropriate service or object view.
  3. Enable the supported application metric collection path for the new workload.
  4. Correlate application error measurements with cluster and datastore performance in VCF Operations.

Explanation

Correct Answer

D:

Correlate application error measurements with cluster and datastore performance in VCF Operations. This directly addresses the case because cross-layer correlation helps distinguish infrastructure-driven symptoms from application-only faults. The acceptance test is: the error spikes line up with the storage latency events under a controlled reproduction.

Incorrect Answers

A:

Collect and correlate supported application or guest metrics with infrastructure telemetry. This is an appropriate step when a platform team wants to correlate JVM heap growth with guest memory pressure for a particular application. It does not resolve the specific requirement here: cross-layer correlation helps distinguish infrastructure-driven symptoms from application-only faults.

B:

Group the application components into the appropriate service or object view. This is an appropriate step when an on-call engineer wants a dashboard for an app spanning several VMs rather than a single host. It does not resolve the specific requirement here: cross-layer correlation helps distinguish infrastructure-driven symptoms from application-only faults.

C:

Enable the supported application metric collection path for the new workload. This is an appropriate step when a new service deployment is invisible to the existing application monitor because its agents or integrations were not configured. It does not resolve the specific requirement here: cross-layer correlation helps distinguish infrastructure-driven symptoms from application-only faults.

Question 357

A library contains sensitive golden images and an administrator plans to expose the entire library to all tenants. Which test outcome demonstrates that this particular issue has been resolved?

  1. Only approved organizations can select the restricted template image.
  2. The same approved image version is available in permitted regions without manual independent copies.
  3. A tenant deployment receives unique guest identity and its approved network parameters.
  4. A new catalog deployment uses the approved image digest or version.

Explanation

Correct Answer

A:

Only approved organizations can select the restricted template image. This directly tests the intended result of limit content allocation and visibility to the authorized organizations. The causal reason is that library presence on the provider does not imply universal tenant entitlement.

Incorrect Answers

B:

The same approved image version is available in permitted regions without manual independent copies. This verifies a different problem: a provider notices the same image duplicated into ten libraries and wants lower maintenance overhead across regions. It would not demonstrate this case's requirement: library presence on the provider does not imply universal tenant entitlement.

C:

A tenant deployment receives unique guest identity and its approved network parameters. This verifies a different problem: a team publishes a VM image from a shared library but leaves its guest customization settings tied to a different network. It would not demonstrate this case's requirement: library presence on the provider does not imply universal tenant entitlement.

D:

A new catalog deployment uses the approved image digest or version. This verifies a different problem: an administrator changes a template image version but tenants continue deploying an outdated item from an unsynchronized content library. It would not demonstrate this case's requirement: library presence on the provider does not imply universal tenant entitlement.

Question 358

An organization requires certificates issued by its own enterprise CA rather than relying on default self-signed credentials. What should the VCF administrator do first to address this exact problem?

  1. Use centralized certificate status and supported renewal workflows in VCF Operations.
  2. Use the supported externally signed certificate import or CA integration procedure.
  3. Verify dependent service certificate propagation and required restart behavior.
  4. Restore valid identity-related certificate trust rather than changing unrelated user credentials.

Explanation

Correct Answer

B:

Use the supported externally signed certificate import or CA integration procedure. This directly addresses the case because enterprise trust requirements can demand controlled certificate issuance and complete chain validation. The acceptance test is: clients verify the installed certificate chain and the service presents the intended subject.

Incorrect Answers

A:

Use centralized certificate status and supported renewal workflows in VCF Operations. This is an appropriate step when multiple VCF appliances have certificates expiring next month and the team has no coordinated renewal process. It does not resolve the specific requirement here: enterprise trust requirements can demand controlled certificate issuance and complete chain validation.

C:

Verify dependent service certificate propagation and required restart behavior. This is an appropriate step when a certificate renewal is complete but one management component continues using an older trusted endpoint after a service restart. It does not resolve the specific requirement here: enterprise trust requirements can demand controlled certificate issuance and complete chain validation.

D:

Restore valid identity-related certificate trust rather than changing unrelated user credentials. This is an appropriate step when an expired identity certificate prevents SSO logins and administrators are trying to fix the issue by resetting all user passwords. It does not resolve the specific requirement here: enterprise trust requirements can demand controlled certificate issuance and complete chain validation.

Question 359

A business-process hook adds ten minutes to every VM request even though only a small subgroup needs the additional validation. Which test outcome demonstrates that this particular issue has been resolved?

  1. The integration succeeds under authorized credentials while the blueprint reveals no reusable token.
  2. A controlled test deletion creates the expected ticket with the correct project and deployment identifiers.
  3. Routine deployments avoid the extra hook and the affected subgroup still receives its required validation.
  4. A newly provisioned VM has a corresponding correct CMDB entry after the automation finishes.

Explanation

Correct Answer

C:

Routine deployments avoid the extra hook and the affected subgroup still receives its required validation. This directly tests the intended result of apply the extensibility workflow only to the relevant event scope or policy condition. The causal reason is that selective triggers preserve normal self-service speed while enforcing exceptional business rules.

Incorrect Answers

A:

The integration succeeds under authorized credentials while the blueprint reveals no reusable token. This verifies a different problem: a provider wants an automation action to call an outside API but developers propose storing a permanent admin token in the blueprint. It would not demonstrate this case's requirement: selective triggers preserve normal self-service speed while enforcing exceptional business rules.

B:

A controlled test deletion creates the expected ticket with the correct project and deployment identifiers. This verifies a different problem: a company wants a service ticket opened automatically when an organization deletes a production deployment. It would not demonstrate this case's requirement: selective triggers preserve normal self-service speed while enforcing exceptional business rules.

D:

A newly provisioned VM has a corresponding correct CMDB entry after the automation finishes. This verifies a different problem: a security team needs to add a CMDB record whenever a governed self-service machine is provisioned. It would not demonstrate this case's requirement: selective triggers preserve normal self-service speed while enforcing exceptional business rules.

Question 360

A platform admin wants to expose containerized app services to development teams without giving them direct ESX host control. Which configuration change is the strongest fit for these constraints?

  1. Configure the supported storage policy integration before deployment.
  2. Complete supported Supervisor enablement and prerequisite networking before consuming the service.
  3. Enable the eligible Supervisor-based service and publish it to the governed consumption environment.
  4. Provide delegated namespace or project consumption rights for the Supervisor-backed offering.

Explanation

Correct Answer

D:

Provide delegated namespace or project consumption rights for the Supervisor-backed offering. This directly addresses the case because a managed Supervisor service separates application consumption from host administration. The acceptance test is: a developer creates the approved workload but cannot modify the underlying ESX cluster.

Incorrect Answers

A:

Configure the supported storage policy integration before deployment. This is an appropriate step when a Kubernetes service needs persistent storage but the target Supervisor environment has no appropriate storage policy or class. It does not resolve the specific requirement here: a managed Supervisor service separates application consumption from host administration.

B:

Complete supported Supervisor enablement and prerequisite networking before consuming the service. This is an appropriate step when an operator wants a Supervisor-based service deployed into a cluster that has not enabled Supervisor. It does not resolve the specific requirement here: a managed Supervisor service separates application consumption from host administration.

C:

Enable the eligible Supervisor-based service and publish it to the governed consumption environment. This is an appropriate step when a tenant wants to deploy supported Kubernetes-backed services from a vSphere Supervisor rather than build an unmanaged separate control plane. It does not resolve the specific requirement here: a managed Supervisor service separates application consumption from host administration.

VMware Cloud Foundation 9.0 Administrator (2V0-17.25) Practice Tests

Purchase Individually

  • Premium File

    100 Questions & Answers
    Last Update: Nov 9, 2026

    $76.99
    $69.99
  • Study Guide

    121 Pages

    $43.99
    $39.99

SPECIAL OFFER: GET 10% OFF
This is ONE TIME OFFER

You save
10%

Enter Your Email Address to Receive Your 10% Off Discount Code

SPECIAL OFFER: GET 10% OFF

You save
10%

Use Discount Code:

A confirmation link was sent to your e-mail.

Please check your mailbox for a message from support@examlabs.com and follow the directions.

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your email address below to get started with our interactive software demo of your free trial.

  • Realistic exam simulation and exam editor with preview functions
  • Whole exam in a single file with several different question types
  • Customizable exam-taking mode & detailed score reports