VMware Cloud Foundation 9.0 Administrator 2V0-17.25 Practice Test 39

Question 380

A log analysis dashboard is empty after a new component is deployed because it was never registered for log collection. What approach best resolves the identified gap?

  1. Filter aggregated authentication logs by source, event type and time interval.
  2. Inspect the edge and routing logs around the time the neighbor went down.
  3. Generate an authorized diagnostic log bundle with appropriate access and redaction controls.
  4. Configure the correct log ingestion and source association for the component.

Explanation

Correct Answer

D:

Configure the correct log ingestion and source association for the component. This directly addresses the case because centralized troubleshooting requires actual log delivery from the targeted service. The acceptance test is: a known synthetic event appears in VCF Operations for Logs with the correct source identity.

Incorrect Answers

A:

Filter aggregated authentication logs by source, event type and time interval. This is an appropriate step when a security team suspects repeated failed administrator logins from one source address across management appliances. It does not resolve the specific requirement here: centralized troubleshooting requires actual log delivery from the targeted service.

B:

Inspect the edge and routing logs around the time the neighbor went down. This is an appropriate step when an NSX edge loses a routing neighbor and the network team needs the actual control-plane event rather than host CPU graphs. It does not resolve the specific requirement here: centralized troubleshooting requires actual log delivery from the targeted service.

C:

Generate an authorized diagnostic log bundle with appropriate access and redaction controls. This is an appropriate step when a support engineer must provide log evidence to the vendor but wants to avoid copying secrets into an open email thread. It does not resolve the specific requirement here: centralized troubleshooting requires actual log delivery from the targeted service.

Question 381

An operator wants a Supervisor-based service deployed into a cluster that has not enabled Supervisor. What should the VCF administrator do first to address this exact problem?

  1. Complete supported Supervisor enablement and prerequisite networking before consuming the service.
  2. Enable the eligible Supervisor-based service and publish it to the governed consumption environment.
  3. Configure the supported storage policy integration before deployment.
  4. Use a supported Supervisor/service lifecycle path with version and workload compatibility checks.

Explanation

Correct Answer

A:

Complete supported Supervisor enablement and prerequisite networking before consuming the service. This directly addresses the case because supervisor-based workloads depend on a functioning Supervisor control plane. The acceptance test is: the cluster reports healthy Supervisor status and a test service deploys successfully.

Incorrect Answers

B:

Enable the eligible Supervisor-based service and publish it to the governed consumption environment. This is an appropriate step when a tenant wants to deploy supported Kubernetes-backed services from a vSphere Supervisor rather than build an unmanaged separate control plane. It does not resolve the specific requirement here: supervisor-based workloads depend on a functioning Supervisor control plane.

C:

Configure the supported storage policy integration before deployment. This is an appropriate step when a Kubernetes service needs persistent storage but the target Supervisor environment has no appropriate storage policy or class. It does not resolve the specific requirement here: supervisor-based workloads depend on a functioning Supervisor control plane.

D:

Use a supported Supervisor/service lifecycle path with version and workload compatibility checks. This is an appropriate step when the administrator plans to patch a Supervisor-based service but has no compatibility plan for its dependent Kubernetes workloads. It does not resolve the specific requirement here: supervisor-based workloads depend on a functioning Supervisor control plane.

Question 382

A financial institution needs controlled development sandboxes that can be recreated without granting developer teams full hypervisor access. Which result is the best acceptance evidence for the intended configuration?

  1. A plant-side transaction completes within the measured latency requirement even during a WAN disruption.
  2. A new sandbox is provisioned repeatably and expires without retaining shared capacity indefinitely.
  3. A residency inventory and tenant deployment show all regulated data and backups stay in permitted locations.
  4. Operations teams apply a consistent policy to resources across both participating sites.

Explanation

Correct Answer

B:

A new sandbox is provisioned repeatably and expires without retaining shared capacity indefinitely. This directly tests the intended result of offer governed private-cloud sandboxes with quotas and time-limited lifecycle rules. The causal reason is that temporary development environments benefit from rapid self-service and centralized resource boundaries.

Incorrect Answers

A:

A plant-side transaction completes within the measured latency requirement even during a WAN disruption. This verifies a different problem: a manufacturer runs latency-sensitive applications beside industrial controllers that cannot tolerate remote WAN delays. It would not demonstrate this case's requirement: temporary development environments benefit from rapid self-service and centralized resource boundaries.

C:

A residency inventory and tenant deployment show all regulated data and backups stay in permitted locations. This verifies a different problem: a public agency must keep regulated workload data under an approved operating and location boundary yet wants an on-demand deployment model. It would not demonstrate this case's requirement: temporary development environments benefit from rapid self-service and centralized resource boundaries.

D:

Operations teams apply a consistent policy to resources across both participating sites. This verifies a different problem: a retailer operates two data centers and wants a consistent operational model without assuming that every app must move to public cloud. It would not demonstrate this case's requirement: temporary development environments benefit from rapid self-service and centralized resource boundaries.

Question 383

Operators cannot tell if a virtual machine connectivity problem originates in its guest, NSX segment or physical transport. What should the VCF administrator do first to address this exact problem?

  1. Use network flows and application insights to inspect and classify the observed conversation.
  2. Inspect actual source-destination flows and associated policy decisions in network operations.
  3. Analyze the end-to-end path in network operations before changing network configuration.
  4. Use VCF Network Operations topology and traffic analysis for the relevant application flow.

Explanation

Correct Answer

C:

Analyze the end-to-end path in network operations before changing network configuration. This directly addresses the case because hop-by-hop network evidence narrows the failure domain. The acceptance test is: path evidence identifies the faulty segment or transport boundary and clears after repair.

Incorrect Answers

A:

Use network flows and application insights to inspect and classify the observed conversation. This is an appropriate step when security needs a record of an unexpectedly broad east-west network conversation between two business applications. It does not resolve the specific requirement here: hop-by-hop network evidence narrows the failure domain.

B:

Inspect actual source-destination flows and associated policy decisions in network operations. This is an appropriate step when a firewall rule change may have blocked communication between an API and database tier. It does not resolve the specific requirement here: hop-by-hop network evidence narrows the failure domain.

D:

Use VCF Network Operations topology and traffic analysis for the relevant application flow. This is an appropriate step when an application call across two NSX segments is slow and the team needs to see the actual flow path and network latency. It does not resolve the specific requirement here: hop-by-hop network evidence narrows the failure domain.

Question 384

A lab workload is not performance critical and the administrator wants to reduce capacity overhead while retaining its approved resiliency. Which test outcome demonstrates that this particular issue has been resolved?

  1. The object becomes compliant after required fault-domain resources are available.
  2. The selected workloads show their assigned policies and meet measured service objectives.
  3. An inventory demonstrates that intended VMs and disks have the right effective policy.
  4. The policy is compliant on the available hosts and meets storage performance and capacity targets.

Explanation

Correct Answer

D:

The policy is compliant on the available hosts and meets storage performance and capacity targets. This directly tests the intended result of evaluate the supported RAID erasure-coding policy versus mirroring based on topology and fault tolerance. The causal reason is that erasure coding trades additional placement and I/O considerations for improved storage efficiency.

Incorrect Answers

A:

The object becomes compliant after required fault-domain resources are available. This verifies a different problem: a VM's vSAN storage-policy change is pending because the cluster lacks enough eligible fault domains. It would not demonstrate this case's requirement: erasure coding trades additional placement and I/O considerations for improved storage efficiency.

B:

The selected workloads show their assigned policies and meet measured service objectives. This verifies a different problem: an administrator wants latency-sensitive VMs to use a different storage treatment from ordinary development VMs. It would not demonstrate this case's requirement: erasure coding trades additional placement and I/O considerations for improved storage efficiency.

C:

An inventory demonstrates that intended VMs and disks have the right effective policy. This verifies a different problem: an architect applies a policy through a template but existing VMs still have their prior vSAN settings. It would not demonstrate this case's requirement: erasure coding trades additional placement and I/O considerations for improved storage efficiency.

Question 385

An operator wants to expand domain capacity with hosts that cannot reach the domain's management and storage networks. Which result is the best acceptance evidence for the intended configuration?

  1. The new hosts join successfully and accept workloads after required connectivity testing.
  2. The new domain's precheck accepts its participating hosts and storage targets.
  3. A planned workload-domain maintenance action does not unexpectedly target an unrelated domain.
  4. The imported vCenter and all scoped clusters appear under the intended VI domain.

Explanation

Correct Answer

A:

The new hosts join successfully and accept workloads after required connectivity testing. This directly tests the intended result of prepare compatible new hosts with the correct network and storage connectivity before adding them. The causal reason is that capacity expansion requires hosts to share the domain's operational dependencies.

Incorrect Answers

B:

The new domain's precheck accepts its participating hosts and storage targets. This verifies a different problem: an operator attempts to create a new workload domain using hosts that have not met compatibility and network prerequisites. It would not demonstrate this case's requirement: capacity expansion requires hosts to share the domain's operational dependencies.

C:

A planned workload-domain maintenance action does not unexpectedly target an unrelated domain. This verifies a different problem: a workload-domain design assumes every application cluster must share the same maintenance window. It would not demonstrate this case's requirement: capacity expansion requires hosts to share the domain's operational dependencies.

D:

The imported vCenter and all scoped clusters appear under the intended VI domain. This verifies a different problem: a customer is importing a qualifying legacy vCenter into an existing VCF instance and wants the imported clusters managed as another domain. It would not demonstrate this case's requirement: capacity expansion requires hosts to share the domain's operational dependencies.

Question 386

An org admin changes the DNS server allocated to a tenant network but running VMs still resolve old internal names. What should the VCF administrator do first to address this exact problem?

  1. Define distinct organization networks with appropriate policies and placement rules.
  2. Validate network DNS configuration and the guest address/lease refresh behavior.
  3. Verify the organization network allocation and supported address assignment configuration.
  4. Enforce organization network isolation and explicitly restrict cross-tenant paths.

Explanation

Correct Answer

B:

Validate network DNS configuration and the guest address/lease refresh behavior. This directly addresses the case because an organization networking change must reach consuming guest configuration to affect name resolution. The acceptance test is: a newly provisioned and a refreshed existing guest resolve the approved internal service names.

Incorrect Answers

A:

Define distinct organization networks with appropriate policies and placement rules. This is an appropriate step when a team wants one organization workload on a restricted subnet and another on a broadly reachable development network. It does not resolve the specific requirement here: an organization networking change must reach consuming guest configuration to affect name resolution.

C:

Verify the organization network allocation and supported address assignment configuration. This is an appropriate step when a developer creates a VM in a project but its guest receives no address due to missing tenant network settings. It does not resolve the specific requirement here: an organization networking change must reach consuming guest configuration to affect name resolution.

D:

Enforce organization network isolation and explicitly restrict cross-tenant paths. This is an appropriate step when a regulated tenant must keep its private subnet inaccessible from another organization sharing the same infrastructure. It does not resolve the specific requirement here: an organization networking change must reach consuming guest configuration to affect name resolution.

Question 387

A team's production and test VMs are placed on the same port group despite a requirement for separate layer-two broadcast domains. Which configuration change is the strongest fit for these constraints?

  1. Correct transport-node tunnel endpoint addressing and underlay reachability.
  2. Configure appropriate redundant uplink teaming and test path failover.
  3. Assign the workloads to appropriately isolated virtual networks or VLAN-backed port groups.
  4. Use a properly associated vSphere Distributed Switch and uniform host uplink configuration.

Explanation

Correct Answer

C:

Assign the workloads to appropriately isolated virtual networks or VLAN-backed port groups. This directly addresses the case because logical network separation prevents unintended same-segment discovery and traffic. The acceptance test is: a layer-two discovery test no longer reaches the unrelated environment.

Incorrect Answers

A:

Correct transport-node tunnel endpoint addressing and underlay reachability. This is an appropriate step when an NSX overlay network is deployed but tunnel endpoints on separate hosts cannot reach each other over the underlay. It does not resolve the specific requirement here: logical network separation prevents unintended same-segment discovery and traffic.

B:

Configure appropriate redundant uplink teaming and test path failover. This is an appropriate step when a distributed switch uplink has no alternate physical path and every VM loses network during one adapter failure. It does not resolve the specific requirement here: logical network separation prevents unintended same-segment discovery and traffic.

D:

Use a properly associated vSphere Distributed Switch and uniform host uplink configuration. This is an appropriate step when a virtual network newly spans several ESX hosts but only one host has the required distributed port group configured. It does not resolve the specific requirement here: logical network separation prevents unintended same-segment discovery and traffic.

Question 388

An organization wants VCF security segmentation but omits the necessary NSX edge and transport preparations. After implementing the corrective approach, which observation most directly proves the requirement is met?

  1. Hosts can access the intended datastore and a protected VM starts successfully.
  2. An authenticated management login and appliance DNS resolution succeed through the intended path.
  3. A precheck identifies the correct supported software content and target components.
  4. A segmented workload communicates over the approved network and fails an unauthorized cross-segment test.

Explanation

Correct Answer

D:

A segmented workload communicates over the approved network and fails an unauthorized cross-segment test. This directly tests the intended result of plan the supported NSX deployment and its underlying transport and edge prerequisites. The causal reason is that software-defined segments require functional management, tunnel endpoints and any necessary routed gateways.

Incorrect Answers

A:

Hosts can access the intended datastore and a protected VM starts successfully. This verifies a different problem: a new cluster has enough CPU but no shared storage access for the planned VMs. It would not demonstrate this case's requirement: software-defined segments require functional management, tunnel endpoints and any necessary routed gateways.

B:

An authenticated management login and appliance DNS resolution succeed through the intended path. This verifies a different problem: a deployment includes compute hosts but lacks any planned route from isolated management networks to required identity and DNS services. It would not demonstrate this case's requirement: software-defined segments require functional management, tunnel endpoints and any necessary routed gateways.

C:

A precheck identifies the correct supported software content and target components. This verifies a different problem: a VCF operator expects fleet-wide lifecycle actions but has not planned a supported management repository or update content access path. It would not demonstrate this case's requirement: software-defined segments require functional management, tunnel endpoints and any necessary routed gateways.

Question 389

A financial institution needs controlled development sandboxes that can be recreated without granting developer teams full hypervisor access. Which administration decision most directly meets the stated requirement?

  1. Offer governed private-cloud sandboxes with quotas and time-limited lifecycle rules.
  2. Manage its on-premises virtualization and software-defined services through a unified private-cloud platform.
  3. Use a governed private-cloud deployment with explicitly controlled placement and data-access policies.
  4. Host the required applications on locally controlled private-cloud capacity near the factory systems.

Explanation

Correct Answer

A:

Offer governed private-cloud sandboxes with quotas and time-limited lifecycle rules. This directly addresses the case because temporary development environments benefit from rapid self-service and centralized resource boundaries. The acceptance test is: a new sandbox is provisioned repeatably and expires without retaining shared capacity indefinitely.

Incorrect Answers

B:

Manage its on-premises virtualization and software-defined services through a unified private-cloud platform. This is an appropriate step when a retailer operates two data centers and wants a consistent operational model without assuming that every app must move to public cloud. It does not resolve the specific requirement here: temporary development environments benefit from rapid self-service and centralized resource boundaries.

C:

Use a governed private-cloud deployment with explicitly controlled placement and data-access policies. This is an appropriate step when a public agency must keep regulated workload data under an approved operating and location boundary yet wants an on-demand deployment model. It does not resolve the specific requirement here: temporary development environments benefit from rapid self-service and centralized resource boundaries.

D:

Host the required applications on locally controlled private-cloud capacity near the factory systems. This is an appropriate step when a manufacturer runs latency-sensitive applications beside industrial controllers that cannot tolerate remote WAN delays. It does not resolve the specific requirement here: temporary development environments benefit from rapid self-service and centralized resource boundaries.

Question 390

A service owner wants to trend datastore latency over a week but selects a static datastore-name property. What should the administrator verify before considering the proposed remediation successful?

  1. The report displays both the vCPU configuration and the measured usage trend.
  2. A time-based graph shows latency samples for the selected datastore.
  3. The interface filters by manufacturer and graphs packet-loss samples over time.
  4. The chart groups hosts into their cluster and shows measured memory pressure per group.

Explanation

Correct Answer

B:

A time-based graph shows latency samples for the selected datastore. This directly tests the intended result of select the datastore latency metric with an appropriate time aggregation. The causal reason is that a string inventory field cannot represent a changing storage-performance quantity.

Incorrect Answers

A:

The report displays both the vCPU configuration and the measured usage trend. This verifies a different problem: a capacity report must distinguish configured vCPU count from observed CPU demand. It would not demonstrate this case's requirement: a string inventory field cannot represent a changing storage-performance quantity.

C:

The interface filters by manufacturer and graphs packet-loss samples over time. This verifies a different problem: an operator compares host manufacturer and packet-loss percentage as if both values were continuous telemetry. It would not demonstrate this case's requirement: a string inventory field cannot represent a changing storage-performance quantity.

D:

The chart groups hosts into their cluster and shows measured memory pressure per group. This verifies a different problem: operations wants to group alarms by cluster name while analyzing memory pressure over time. It would not demonstrate this case's requirement: a string inventory field cannot represent a changing storage-performance quantity.

VMware Cloud Foundation 9.0 Administrator (2V0-17.25) Practice Tests

Purchase Individually

  • Premium File

    100 Questions & Answers
    Last Update: Nov 9, 2026

    $76.99
    $69.99
  • Study Guide

    121 Pages

    $43.99
    $39.99

SPECIAL OFFER: GET 10% OFF
This is ONE TIME OFFER

You save
10%

Enter Your Email Address to Receive Your 10% Off Discount Code

SPECIAL OFFER: GET 10% OFF

You save
10%

Use Discount Code:

A confirmation link was sent to your e-mail.

Please check your mailbox for a message from support@examlabs.com and follow the directions.

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your email address below to get started with our interactive software demo of your free trial.