Pass VMware 2V0-17.25 Exam in First Attempt Easily
Real VMware 2V0-17.25 Exam Questions, Accurate & Verified Answers As Experienced in the Actual Test!

Verified by experts
2 products

You save $34.99

2V0-17.25 Premium Bundle

  • Premium File 100 Questions & Answers
  • Last Update: Nov 9, 2026
  • Study Guide 121 Pages
$74.99 $109.98

Purchase Individually

  • Premium File

    100 Questions & Answers
    Last Update: Nov 9, 2026

    $76.99
    $69.99
  • Study Guide

    121 Pages

    $43.99
    $39.99

VMware Cloud Foundation 9.0 Administrator 2V0-17.25 Practice Test 5

Question 40

A platform contains two VCF instances and the administrator cannot reconcile purchased and assigned core capacity. What should the administrator verify before considering the proposed remediation successful?

  1. The relevant license report identifies any true entitlement shortfall independently of host CPU pressure.
  2. The fleet license view reflects the approved additional storage entitlement and measured use.
  3. VCF Operations reports the applied valid entitlement and the expected evaluation-to-license transition.
  4. The assigned and utilized license quantities reconcile with the purchased allowance.

Explanation

Correct Answer

D:

The assigned and utilized license quantities reconcile with the purchased allowance. This directly tests the intended result of inventory licensed cores and allocations across the fleet against its approved entitlement. The causal reason is that accurate license compliance requires a consistent fleet-wide view of consumption.

Incorrect Answers

A:

The relevant license report identifies any true entitlement shortfall independently of host CPU pressure. This verifies a different problem: after adding many hosts the operator sees a capacity alarm but cannot tell whether the issue is compute resources or licensed quantity. It would not demonstrate this case's requirement: accurate license compliance requires a consistent fleet-wide view of consumption.

B:

The fleet license view reflects the approved additional storage entitlement and measured use. This verifies a different problem: finance wants to add extra vSAN storage capacity to its licensed private cloud and is unsure how that consumption is recorded. It would not demonstrate this case's requirement: accurate license compliance requires a consistent fleet-wide view of consumption.

C:

VCF Operations reports the applied valid entitlement and the expected evaluation-to-license transition. This verifies a different problem: a VCF 9.0 instance is still in its initial evaluation period and operations has not applied a valid entitlement file. It would not demonstrate this case's requirement: accurate license compliance requires a consistent fleet-wide view of consumption.

Question 41

An organization admin needs to add a developer to one project without granting the user provider control. Which administration decision most directly meets the stated requirement?

  1. Use organization project membership and role assignment rather than provider-wide RBAC.
  2. Configure or request the needed organization network allocation within the supported role boundary.
  3. Review and remove or reassign project-owned resources before deleting the project.
  4. Use the organization content-management and sharing workflow with scoped permissions.

Explanation

Correct Answer

A:

Use organization project membership and role assignment rather than provider-wide RBAC. This directly addresses the case because org administrators can delegate scoped project access without controlling provider infrastructure. The acceptance test is: the developer can access the assigned project and cannot change provider-level settings.

Incorrect Answers

B:

Configure or request the needed organization network allocation within the supported role boundary. This is an appropriate step when a tenant's catalog item fails deployment because the organization has no approved network available in its region. It does not resolve the specific requirement here: org administrators can delegate scoped project access without controlling provider infrastructure.

C:

Review and remove or reassign project-owned resources before deleting the project. This is an appropriate step when a tenant admin wants to delete a project that still owns active VMs and wonders why cleanup is blocked. It does not resolve the specific requirement here: org administrators can delegate scoped project access without controlling provider infrastructure.

D:

Use the organization content-management and sharing workflow with scoped permissions. This is an appropriate step when an organization wants to publish its own approved service definition to a restricted team catalog. It does not resolve the specific requirement here: org administrators can delegate scoped project access without controlling provider infrastructure.

Question 42

A developer creates a VM in a project but its guest receives no address due to missing tenant network settings. What should the administrator verify before considering the proposed remediation successful?

  1. A cross-tenant probe is denied while approved intra-tenant traffic succeeds.
  2. A new VM receives a valid subnet address and default route from the intended configuration.
  3. A newly provisioned and a refreshed existing guest resolve the approved internal service names.
  4. A test VM reaches its approved enterprise service through the correct gateway.

Explanation

Correct Answer

B:

A new VM receives a valid subnet address and default route from the intended configuration. This directly tests the intended result of verify the organization network allocation and supported address assignment configuration. The causal reason is that publishing a network name does not automatically make address services available to guest interfaces.

Incorrect Answers

A:

A cross-tenant probe is denied while approved intra-tenant traffic succeeds. This verifies a different problem: a regulated tenant must keep its private subnet inaccessible from another organization sharing the same infrastructure. It would not demonstrate this case's requirement: publishing a network name does not automatically make address services available to guest interfaces.

C:

A newly provisioned and a refreshed existing guest resolve the approved internal service names. This verifies a different problem: an org admin changes the DNS server allocated to a tenant network but running VMs still resolve old internal names. It would not demonstrate this case's requirement: publishing a network name does not automatically make address services available to guest interfaces.

D:

A test VM reaches its approved enterprise service through the correct gateway. This verifies a different problem: an application needs outbound access to an approved enterprise service but has no organization network route to the provider gateway. It would not demonstrate this case's requirement: publishing a network name does not automatically make address services available to guest interfaces.

Question 43

A migration changes VM placement and app owners fear the network topology view will retain old associations. What should the administrator verify before considering the proposed remediation successful?

  1. The flow view associates the failed connection with the changed rule and its affected endpoints.
  2. The suspected VM's traffic trend matches the physical uplink burst.
  3. The topology shows the VM's new host path and reachable application dependencies.
  4. Path evidence identifies the faulty segment or transport boundary and clears after repair.

Explanation

Correct Answer

C:

The topology shows the VM's new host path and reachable application dependencies. This directly tests the intended result of refresh or validate application discovery and network topology after the workload move. The causal reason is that an outdated dependency map can mislead incident response after infrastructure changes.

Incorrect Answers

A:

The flow view associates the failed connection with the changed rule and its affected endpoints. This verifies a different problem: a firewall rule change may have blocked communication between an API and database tier. It would not demonstrate this case's requirement: an outdated dependency map can mislead incident response after infrastructure changes.

B:

The suspected VM's traffic trend matches the physical uplink burst. This verifies a different problem: a team sees traffic bursts on a network uplink but cannot identify which virtual workload causes them. It would not demonstrate this case's requirement: an outdated dependency map can mislead incident response after infrastructure changes.

D:

Path evidence identifies the faulty segment or transport boundary and clears after repair. This verifies a different problem: operators cannot tell if a virtual machine connectivity problem originates in its guest, NSX segment or physical transport. It would not demonstrate this case's requirement: an outdated dependency map can mislead incident response after infrastructure changes.

Question 44

A host cluster starts reporting intermittent failures and the team wants a consolidated diagnosis across vCenter, vSAN and network services. Which result is the best acceptance evidence for the intended configuration?

  1. The relevant storage and host findings are cleared before maintenance proceeds.
  2. The underlying cause is corrected and the finding stays resolved during a repeat load test.
  3. The new domain passes its relevant connectivity and component health checks.
  4. The diagnostics view identifies a reproducible finding associated with the fault.

Explanation

Correct Answer

D:

The diagnostics view identifies a reproducible finding associated with the fault. This directly tests the intended result of run the supported VCF Health and Diagnostics checks for the affected components. The causal reason is that health and diagnostics correlate known failure signatures rather than relying on single-metric guesses.

Incorrect Answers

A:

The relevant storage and host findings are cleared before maintenance proceeds. This verifies a different problem: an operator runs a health diagnostic before patching but ignores active storage warnings that could affect evacuation. It would not demonstrate this case's requirement: health and diagnostics correlate known failure signatures rather than relying on single-metric guesses.

B:

The underlying cause is corrected and the finding stays resolved during a repeat load test. This verifies a different problem: a service health alarm recurs after temporary recovery and administrators only acknowledge it each time. It would not demonstrate this case's requirement: health and diagnostics correlate known failure signatures rather than relying on single-metric guesses.

C:

The new domain passes its relevant connectivity and component health checks. This verifies a different problem: a platform team wants to verify overall VCF readiness after adding a new VI domain. It would not demonstrate this case's requirement: health and diagnostics correlate known failure signatures rather than relying on single-metric guesses.

Question 45

A virtual network must carry large encapsulated packets but only its host VMkernel MTU was increased. Which administration decision most directly meets the stated requirement?

  1. Align MTU end-to-end across transport hosts and physical underlay links.
  2. Configure appropriate redundant uplink teaming and test path failover.
  3. Assign the workloads to appropriately isolated virtual networks or VLAN-backed port groups.
  4. Correct transport-node tunnel endpoint addressing and underlay reachability.

Explanation

Correct Answer

A:

Align MTU end-to-end across transport hosts and physical underlay links. This directly addresses the case because tunnel overhead can produce blackholing if any physical hop has a smaller MTU than required. The acceptance test is: the full-sized test packet traverses the overlay under load without fragmentation-related loss.

Incorrect Answers

B:

Configure appropriate redundant uplink teaming and test path failover. This is an appropriate step when a distributed switch uplink has no alternate physical path and every VM loses network during one adapter failure. It does not resolve the specific requirement here: tunnel overhead can produce blackholing if any physical hop has a smaller MTU than required.

C:

Assign the workloads to appropriately isolated virtual networks or VLAN-backed port groups. This is an appropriate step when a team's production and test VMs are placed on the same port group despite a requirement for separate layer-two broadcast domains. It does not resolve the specific requirement here: tunnel overhead can produce blackholing if any physical hop has a smaller MTU than required.

D:

Correct transport-node tunnel endpoint addressing and underlay reachability. This is an appropriate step when an NSX overlay network is deployed but tunnel endpoints on separate hosts cannot reach each other over the underlay. It does not resolve the specific requirement here: tunnel overhead can produce blackholing if any physical hop has a smaller MTU than required.

Question 46

A vSAN workload domain runs low on usable capacity after selecting a high-redundancy policy for every VM. What should the administrator verify before considering the proposed remediation successful?

  1. A protected VM migrates between participating hosts without loss of disk access.
  2. The revised plan preserves required availability and adequate free space after representative growth.
  3. All intended hosts mount the datastore and the domain operates with the approved storage.
  4. All targeted objects report compliance and storage repair activity reaches the expected steady state.

Explanation

Correct Answer

B:

The revised plan preserves required availability and adequate free space after representative growth. This directly tests the intended result of evaluate protection overhead and actual workload needs before revising storage policies or adding capacity. The causal reason is that redundancy consumes physical capacity and must be budgeted separately from logical disk sizes.

Incorrect Answers

A:

A protected VM migrates between participating hosts without loss of disk access. This verifies a different problem: a domain uses a shared datastore but different ESX hosts have inconsistent storage pathing that causes migration failures. It would not demonstrate this case's requirement: redundancy consumes physical capacity and must be budgeted separately from logical disk sizes.

C:

All intended hosts mount the datastore and the domain operates with the approved storage. This verifies a different problem: an administrator wants to use existing supported NFS storage for a domain but assumes that vSAN is mandatory for every VCF cluster. It would not demonstrate this case's requirement: redundancy consumes physical capacity and must be budgeted separately from logical disk sizes.

D:

All targeted objects report compliance and storage repair activity reaches the expected steady state. This verifies a different problem: an administrator changes a vSAN policy for a newly created domain while resynchronization and repairs are still running. It would not demonstrate this case's requirement: redundancy consumes physical capacity and must be budgeted separately from logical disk sizes.

Question 47

A data-center deployment needs a vSAN cluster across sites with an appropriate witness for fault-domain decisions. What approach best resolves the identified gap?

  1. Verify eligible devices and complete the appropriate vSAN storage pool or disk-group creation.
  2. Restore required vSAN VMkernel connectivity across the participating hosts.
  3. Plan and configure the supported stretched-cluster or two-site topology with its witness placement.
  4. Size usable capacity with policy overhead and operational headroom before admitting workloads.

Explanation

Correct Answer

C:

Plan and configure the supported stretched-cluster or two-site topology with its witness placement. This directly addresses the case because a witness provides quorum information to distinguish site isolation from duplicate active ownership. The acceptance test is: a planned site-link failure preserves one supported authoritative data path without split-brain behavior.

Incorrect Answers

A:

Verify eligible devices and complete the appropriate vSAN storage pool or disk-group creation. This is an appropriate step when a cluster's physical disks are present but vSAN capacity is not appearing because devices were never properly claimed. It does not resolve the specific requirement here: a witness provides quorum information to distinguish site isolation from duplicate active ownership.

B:

Restore required vSAN VMkernel connectivity across the participating hosts. This is an appropriate step when a new vSAN cluster has hosts ready but their vSAN VMkernel interfaces are on different unreachable VLANs. It does not resolve the specific requirement here: a witness provides quorum information to distinguish site isolation from duplicate active ownership.

D:

Size usable capacity with policy overhead and operational headroom before admitting workloads. This is an appropriate step when an administrator enables vSAN on a cluster without leaving capacity for maintenance and future component rebuilds. It does not resolve the specific requirement here: a witness provides quorum information to distinguish site isolation from duplicate active ownership.

Question 48

A deployment pipeline repeatedly creates workloads with an old prohibited setting after engineers manually correct them. Which administration decision most directly meets the stated requirement?

  1. Use VCF Operations configuration-drift detection against the approved desired state.
  2. Restore the correct configuration or document an authorized exception to the drift baseline.
  3. Verify that the relevant fleet objects are enrolled in the intended configuration management scope.
  4. Fix the upstream declarative template and enforce drift detection on the generated resources.

Explanation

Correct Answer

D:

Fix the upstream declarative template and enforce drift detection on the generated resources. This directly addresses the case because repeated drift indicates an authoritative configuration source that still encodes the bad value. The acceptance test is: a subsequent pipeline deployment retains the approved setting without manual repair.

Incorrect Answers

A:

Use VCF Operations configuration-drift detection against the approved desired state. This is an appropriate step when a host configuration change was made outside the authorized change window and operators need to see what diverged from baseline. It does not resolve the specific requirement here: repeated drift indicates an authoritative configuration source that still encodes the bad value.

B:

Restore the correct configuration or document an authorized exception to the drift baseline. This is an appropriate step when security notices that a VM's configuration differs from its approved policy, but the team only acknowledges the drift alert. It does not resolve the specific requirement here: repeated drift indicates an authoritative configuration source that still encodes the bad value.

C:

Verify that the relevant fleet objects are enrolled in the intended configuration management scope. This is an appropriate step when an operator enables configuration drift detection for one cluster but expects findings from unrelated vCenters automatically. It does not resolve the specific requirement here: repeated drift indicates an authoritative configuration source that still encodes the bad value.

Question 49

A cluster is degraded after a device failure and the administrator wants to immediately remove another host for maintenance. After implementing the corrective approach, which observation most directly proves the requirement is met?

  1. The cluster completes required repairs and meets the chosen maintenance tolerance before the host exits.
  2. A host outage leaves the protected VM's storage object accessible and compliant as intended.
  3. After remediation the object is policy compliant and data repairs have finished.
  4. The recovery drill restores application data when the primary site is unavailable.

Explanation

Correct Answer

A:

The cluster completes required repairs and meets the chosen maintenance tolerance before the host exits. This directly tests the intended result of wait for health and resynchronization status or evaluate the maintenance risk before removing more capacity. The causal reason is that a second failure during reduced redundancy can remove the only remaining data copy.

Incorrect Answers

B:

A host outage leaves the protected VM's storage object accessible and compliant as intended. This verifies a different problem: a three-host vSAN cluster is being designed for one host failure, but the proposed policy has no redundant object components. It would not demonstrate this case's requirement: a second failure during reduced redundancy can remove the only remaining data copy.

C:

After remediation the object is policy compliant and data repairs have finished. This verifies a different problem: an operator sees an object reported as noncompliant but all VM guest processes still run. It would not demonstrate this case's requirement: a second failure during reduced redundancy can remove the only remaining data copy.

D:

The recovery drill restores application data when the primary site is unavailable. This verifies a different problem: a site resilience plan assumes that local vSAN fault tolerance automatically protects against a total region loss. It would not demonstrate this case's requirement: a second failure during reduced redundancy can remove the only remaining data copy.

Question 50

An NSX edge is deployed for north-south services but fails registration due to unresolved or unreachable management services. Which test outcome demonstrates that this particular issue has been resolved?

  1. Host-to-host overlay reachability passes and NSX segments carry VM traffic.
  2. The edge becomes healthy in the management inventory and its service uplinks pass connectivity tests.
  3. A segment is realized on intended hosts and test workloads can attach to it.
  4. The permitted intersegment flow succeeds through the intended gateway policy.

Explanation

Correct Answer

B:

The edge becomes healthy in the management inventory and its service uplinks pass connectivity tests. This directly tests the intended result of verify NSX management network, name resolution and edge configuration prerequisites. The causal reason is that data-plane gateway services still depend on functioning control-plane deployment and registration.

Incorrect Answers

A:

Host-to-host overlay reachability passes and NSX segments carry VM traffic. This verifies a different problem: an NSX deployment is planned without reserving transport-node addresses for the hosts. It would not demonstrate this case's requirement: data-plane gateway services still depend on functioning control-plane deployment and registration.

C:

A segment is realized on intended hosts and test workloads can attach to it. This verifies a different problem: a management team has installed NSX Manager but cannot provision a usable logical network because no transport zone was prepared. It would not demonstrate this case's requirement: data-plane gateway services still depend on functioning control-plane deployment and registration.

D:

The permitted intersegment flow succeeds through the intended gateway policy. This verifies a different problem: network engineers assume adding two tenant segments automatically enables routed communication between them. It would not demonstrate this case's requirement: data-plane gateway services still depend on functioning control-plane deployment and registration.

VMware Cloud Foundation 9.0 Administrator (2V0-17.25) Practice Tests

Purchase Individually

  • Premium File

    100 Questions & Answers
    Last Update: Nov 9, 2026

    $76.99
    $69.99
  • Study Guide

    121 Pages

    $43.99
    $39.99

SPECIAL OFFER: GET 10% OFF
This is ONE TIME OFFER

You save
10%

Enter Your Email Address to Receive Your 10% Off Discount Code

SPECIAL OFFER: GET 10% OFF

You save
10%

Use Discount Code:

A confirmation link was sent to your e-mail.

Please check your mailbox for a message from support@examlabs.com and follow the directions.

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your email address below to get started with our interactive software demo of your free trial.

  • Realistic exam simulation and exam editor with preview functions
  • Whole exam in a single file with several different question types
  • Customizable exam-taking mode & detailed score reports