Pass CompTIA Server+ SK0-005 Exam in First Attempt Easily
Real CompTIA Server+ SK0-005 Exam Questions, Accurate & Verified Answers As Experienced in the Actual Test!

Verified by experts
3 products

You save $69.98

SK0-005 Premium Bundle

  • Premium File 617 Questions & Answers
  • Last Update: Nov 9, 2026
  • Training Course 139 Lectures
  • Study Guide 533 Pages
$79.99 $149.97

Purchase Individually

  • Premium File

    617 Questions & Answers
    Last Update: Nov 9, 2026

    $76.99
    $69.99
  • Training Course

    139 Lectures

    $43.99
    $39.99
  • Study Guide

    533 Pages

    $43.99
    $39.99

CompTIA Server+ Certification Exam SK0-005 Practice Test 40

Question 390

The server fault remains unresolved: A data-center team discovers a failed server at midnight but its asset record lacks the service tag and warranty entitlement, delaying dispatch of a replacement part. Which evidence should be examined first to diagnose this particular issue?

  1. Inspect procurement records, chassis labels, CMDB identifiers, coverage dates and update history.
  2. Inspect hardware core inventory, license terms, activated VMs and procurement records.
  3. Inspect runbook storage dependencies, backup copy revision, access controls and recovery drill evidence.
  4. Inspect DHCP reservation identifier, new NIC MAC, leases, duplicate IP checks and DNS registration.

Explanation

Correct Answer

A:

Inspect procurement records, chassis labels, CMDB identifiers, coverage dates and update history. These checks target the described failure in Recording serial numbers and warranties for fast hardware replacement. Appropriate response: Maintain verified serial, model, asset tag, warranty tier and physical location in a secured service inventory. Success criteria: During a simulated incident, a technician identifies the exact covered unit and vendor support entitlement from the current record.

Incorrect Answers

B:

Inspect hardware core inventory, license terms, activated VMs and procurement records. Those checks investigate Counting CPU core licenses on virtualized Windows hosts instead of the Recording serial numbers and warranties for fast hardware replacement failure. The focused investigation should be: Inspect procurement records, chassis labels, CMDB identifiers, coverage dates and update history.

C:

Inspect runbook storage dependencies, backup copy revision, access controls and recovery drill evidence. Those checks investigate Preserving secured runbooks during a major identity outage instead of the Recording serial numbers and warranties for fast hardware replacement failure. The focused investigation should be: Inspect procurement records, chassis labels, CMDB identifiers, coverage dates and update history.

D:

Inspect DHCP reservation identifier, new NIC MAC, leases, duplicate IP checks and DNS registration. Those checks investigate Separating IPv4 DHCP reservation from a MAC-address replacement instead of the Recording serial numbers and warranties for fast hardware replacement failure. The focused investigation should be: Inspect procurement records, chassis labels, CMDB identifiers, coverage dates and update history.

Question 391

A CompTIA Server+ SK0-005 administrator reviews this production scenario: An operations team adds a new management VLAN but leaves its network drawing unchanged; recovery engineers use the old diagram and connect a replacement server to the wrong segment. Which configuration or design change most directly solves the requirement?

  1. Maintain approved offline or separately authenticated protected emergency copies with controlled updates and auditability.
  2. Confirm the server OS and storage HCL, supported controller firmware and installation driver before production deployment.
  3. Measure actual eligible deployment against the volume contract and perform required license true-up or corrective purchases.
  4. Update controlled architecture and rack network diagrams in the same approved change as the VLAN deployment.

Explanation

Correct Answer

D:

Update controlled architecture and rack network diagrams in the same approved change as the VLAN deployment. Technical basis: Configuration documentation must track deployed reality to support fault isolation and repeatable recovery. Acceptance evidence: A recovery drill traces correct cable, switch port, VLAN and IP assignment directly from the current documents. Deployment boundary: Confirm the server vendor hardware compatibility list, current operating system or hypervisor support, approved permissions, maintenance and backup processes before applying this educational example to production.

Incorrect Answers

A:

Maintain approved offline or separately authenticated protected emergency copies with controlled updates and auditability. This is a sensible intervention in the separate Preserving secured runbooks during a major identity outage scenario. It does not resolve the present Keeping infrastructure diagrams synchronized after VLAN rework requirement. For the current problem, use: Update controlled architecture and rack network diagrams in the same approved change as the VLAN deployment.

B:

Confirm the server OS and storage HCL, supported controller firmware and installation driver before production deployment. This is a sensible intervention in the separate Checking server OS HCL before boot-volume installation scenario. It does not resolve the present Keeping infrastructure diagrams synchronized after VLAN rework requirement. For the current problem, use: Update controlled architecture and rack network diagrams in the same approved change as the VLAN deployment.

C:

Measure actual eligible deployment against the volume contract and perform required license true-up or corrective purchases. This is a sensible intervention in the separate Performing a volume-license true-up after VM growth scenario. It does not resolve the present Keeping infrastructure diagrams synchronized after VLAN rework requirement. For the current problem, use: Update controlled architecture and rack network diagrams in the same approved change as the VLAN deployment.

Question 392

During a CompTIA Server+ incident recovery verification, the team observes: An operations team adds a new management VLAN but leaves its network drawing unchanged; recovery engineers use the old diagram and connect a replacement server to the wrong segment. Which result is the most convincing evidence of the required outcome?

  1. During a simulated incident, a technician identifies the exact covered unit and vendor support entitlement from the current record.
  2. The installer recognizes intended usable capacity and a reboot consistently loads from the correct EFI entry.
  3. Test accounts receive the expected warning or limit and existing compliant documents remain available without unexpected deletions.
  4. A recovery drill traces correct cable, switch port, VLAN and IP assignment directly from the current documents.

Explanation

Correct Answer

D:

A recovery drill traces correct cable, switch port, VLAN and IP assignment directly from the current documents. This directly verifies Keeping infrastructure diagrams synchronized after VLAN rework. Required action: Update controlled architecture and rack network diagrams in the same approved change as the VLAN deployment. Why it is a suitable test: Configuration documentation must track deployed reality to support fault isolation and repeatable recovery.

Incorrect Answers

A:

During a simulated incident, a technician identifies the exact covered unit and vendor support entitlement from the current record. This verifies the separate Recording serial numbers and warranties for fast hardware replacement situation rather than Keeping infrastructure diagrams synchronized after VLAN rework. The decisive outcome here is: A recovery drill traces correct cable, switch port, VLAN and IP assignment directly from the current documents.

B:

The installer recognizes intended usable capacity and a reboot consistently loads from the correct EFI entry. This verifies the separate Choosing UEFI with GPT for a large operating-system disk situation rather than Keeping infrastructure diagrams synchronized after VLAN rework. The decisive outcome here is: A recovery drill traces correct cable, switch port, VLAN and IP assignment directly from the current documents.

C:

Test accounts receive the expected warning or limit and existing compliant documents remain available without unexpected deletions. This verifies the separate Deploying file-server quotas without deleting existing departmental documents situation rather than Keeping infrastructure diagrams synchronized after VLAN rework. The decisive outcome here is: A recovery drill traces correct cable, switch port, VLAN and IP assignment directly from the current documents.

Question 393

A server administrator explains the technical behavior behind this situation: An operations team adds a new management VLAN but leaves its network drawing unchanged; recovery engineers use the old diagram and connect a replacement server to the wrong segment. Which technical principle most directly explains the correct approach?

  1. Recovery duration metrics must track business service recovery rather than an intermediate technician action.
  2. Print service availability and the authorization to administer a shared queue are independent configuration boundaries.
  3. Failback policies need hysteresis or an operator-controlled gate to avoid repeated role changes on unstable systems.
  4. Configuration documentation must track deployed reality to support fault isolation and repeatable recovery.

Explanation

Correct Answer

D:

Configuration documentation must track deployed reality to support fault isolation and repeatable recovery. This is the governing technical explanation for Keeping infrastructure diagrams synchronized after VLAN rework. Correct configuration: Update controlled architecture and rack network diagrams in the same approved change as the VLAN deployment. Observable outcome: A recovery drill traces correct cable, switch port, VLAN and IP assignment directly from the current documents.

Incorrect Answers

A:

Recovery duration metrics must track business service recovery rather than an intermediate technician action. That principle describes Choosing service MTTR metrics instead of optimistic incident closure labels, not the mechanism that governs Keeping infrastructure diagrams synchronized after VLAN rework. The relevant principle is: Configuration documentation must track deployed reality to support fault isolation and repeatable recovery.

B:

Print service availability and the authorization to administer a shared queue are independent configuration boundaries. That principle describes Auditing print-server queues without broadening share permissions, not the mechanism that governs Keeping infrastructure diagrams synchronized after VLAN rework. The relevant principle is: Configuration documentation must track deployed reality to support fault isolation and repeatable recovery.

C:

Failback policies need hysteresis or an operator-controlled gate to avoid repeated role changes on unstable systems. That principle describes Designing automatic failback to avoid unstable oscillation, not the mechanism that governs Keeping infrastructure diagrams synchronized after VLAN rework. The relevant principle is: Configuration documentation must track deployed reality to support fault isolation and repeatable recovery.

Question 394

The server team omits a necessary safeguard. An operations team adds a new management VLAN but leaves its network drawing unchanged; recovery engineers use the old diagram and connect a replacement server to the wrong segment. Which resulting operational or security exposure is the most direct?

  1. Incorrect MTTR claims hide repeated long customer outages and undermine capacity planning.
  2. Outdated diagrams can cause security boundary errors and unnecessary incident duration.
  3. Unbounded local logs can stop services and aggressive deletion can destroy legally required incident records.
  4. Ignoring errors can multiply a minor service fault into a multi-tier outage and complicate rollback.

Explanation

Correct Answer

B:

Outdated diagrams can cause security boundary errors and unnecessary incident duration. This is the central risk in Keeping infrastructure diagrams synchronized after VLAN rework. Appropriate safeguard: Update controlled architecture and rack network diagrams in the same approved change as the VLAN deployment. Evidence the safeguard works: A recovery drill traces correct cable, switch port, VLAN and IP assignment directly from the current documents.

Incorrect Answers

A:

Incorrect MTTR claims hide repeated long customer outages and undermine capacity planning. This exposure applies to Choosing service MTTR metrics instead of optimistic incident closure labels, not the direct consequence of Keeping infrastructure diagrams synchronized after VLAN rework. The actual case-specific risk is: Outdated diagrams can cause security boundary errors and unnecessary incident duration.

C:

Unbounded local logs can stop services and aggressive deletion can destroy legally required incident records. This exposure applies to Configuring central log shipping with retention and rotation, not the direct consequence of Keeping infrastructure diagrams synchronized after VLAN rework. The actual case-specific risk is: Outdated diagrams can cause security boundary errors and unnecessary incident duration.

D:

Ignoring errors can multiply a minor service fault into a multi-tier outage and complicate rollback. This exposure applies to Adding safe error checks before scripted service restarts, not the direct consequence of Keeping infrastructure diagrams synchronized after VLAN rework. The actual case-specific risk is: Outdated diagrams can cause security boundary errors and unnecessary incident duration.

Question 395

The server fault remains unresolved: An operations team adds a new management VLAN but leaves its network drawing unchanged; recovery engineers use the old diagram and connect a replacement server to the wrong segment. Which evidence should be examined first to diagnose this particular issue?

  1. Inspect change tickets, switch configs, diagram revision, rack labels and observed traffic path.
  2. Inspect runbook storage dependencies, backup copy revision, access controls and recovery drill evidence.
  3. Inspect hypervisor CPU ready, host core count, guest scheduling and observed application response.
  4. Inspect DHCP discover/offer traffic, switch VLAN, relay helper, lease scope and client interface state.

Explanation

Correct Answer

A:

Inspect change tickets, switch configs, diagram revision, rack labels and observed traffic path. These checks target the described failure in Keeping infrastructure diagrams synchronized after VLAN rework. Appropriate response: Update controlled architecture and rack network diagrams in the same approved change as the VLAN deployment. Success criteria: A recovery drill traces correct cable, switch port, VLAN and IP assignment directly from the current documents.

Incorrect Answers

B:

Inspect runbook storage dependencies, backup copy revision, access controls and recovery drill evidence. Those checks investigate Preserving secured runbooks during a major identity outage instead of the Keeping infrastructure diagrams synchronized after VLAN rework failure. The focused investigation should be: Inspect change tickets, switch configs, diagram revision, rack labels and observed traffic path.

C:

Inspect hypervisor CPU ready, host core count, guest scheduling and observed application response. Those checks investigate Preventing VM CPU overcommit from harming latency-sensitive services instead of the Keeping infrastructure diagrams synchronized after VLAN rework failure. The focused investigation should be: Inspect change tickets, switch configs, diagram revision, rack labels and observed traffic path.

D:

Inspect DHCP discover/offer traffic, switch VLAN, relay helper, lease scope and client interface state. Those checks investigate Interpreting APIPA assignment after DHCP failure instead of the Keeping infrastructure diagrams synchronized after VLAN rework failure. The focused investigation should be: Inspect change tickets, switch configs, diagram revision, rack labels and observed traffic path.

Question 396

A CompTIA Server+ SK0-005 administrator reviews this production scenario: A payroll application has an agreed four-hour recovery time and fifteen-minute data-loss tolerance, but its plan schedules backups only nightly and assumes that meets both requirements. Which configuration or design change most directly solves the requirement?

  1. Maintain approved offline or separately authenticated protected emergency copies with controlled updates and auditability.
  2. Align backup frequency, replication and restoration workflow with separately documented RPO and RTO goals using actual recovery tests.
  3. Consolidate temporary snapshots according to vendor recommendations and implement independent application-consistent backups with restore tests.
  4. Size and relocate supported page or swap storage after assessing memory pressure and safe filesystem separation for the workload.

Explanation

Correct Answer

B:

Align backup frequency, replication and restoration workflow with separately documented RPO and RTO goals using actual recovery tests. Technical basis: RPO measures tolerable lost data time while RTO measures time to restore usable service. Acceptance evidence: A representative recovery reaches service within four hours and loses no more than the permitted fifteen minutes of data. Deployment boundary: Confirm the server vendor hardware compatibility list, current operating system or hypervisor support, approved permissions, maintenance and backup processes before applying this educational example to production.

Incorrect Answers

A:

Maintain approved offline or separately authenticated protected emergency copies with controlled updates and auditability. This is a sensible intervention in the separate Preserving secured runbooks during a major identity outage scenario. It does not resolve the present Translating business RTO and RPO into a recovery plan requirement. For the current problem, use: Align backup frequency, replication and restoration workflow with separately documented RPO and RTO goals using actual recovery tests.

C:

Consolidate temporary snapshots according to vendor recommendations and implement independent application-consistent backups with restore tests. This is a sensible intervention in the separate Distinguishing hypervisor snapshots from durable backups scenario. It does not resolve the present Translating business RTO and RPO into a recovery plan requirement. For the current problem, use: Align backup frequency, replication and restoration workflow with separately documented RPO and RTO goals using actual recovery tests.

D:

Size and relocate supported page or swap storage after assessing memory pressure and safe filesystem separation for the workload. This is a sensible intervention in the separate Setting pagefile or swap placement without exhausting system disks scenario. It does not resolve the present Translating business RTO and RPO into a recovery plan requirement. For the current problem, use: Align backup frequency, replication and restoration workflow with separately documented RPO and RTO goals using actual recovery tests.

Question 397

During a CompTIA Server+ incident recovery verification, the team observes: A payroll application has an agreed four-hour recovery time and fifteen-minute data-loss tolerance, but its plan schedules backups only nightly and assumes that meets both requirements. Which result is the most convincing evidence of the required outcome?

  1. A representative live migration completes with expected service continuity and the VM sees a supported processor feature set.
  2. Incident reports and service checks agree on actual restoration times and can support justified reliability improvements.
  3. The host reaches its permitted remote monitoring endpoint without routing isolated storage traffic over the management uplink.
  4. A representative recovery reaches service within four hours and loses no more than the permitted fifteen minutes of data.

Explanation

Correct Answer

D:

A representative recovery reaches service within four hours and loses no more than the permitted fifteen minutes of data. This directly verifies Translating business RTO and RPO into a recovery plan. Required action: Align backup frequency, replication and restoration workflow with separately documented RPO and RTO goals using actual recovery tests. Why it is a suitable test: RPO measures tolerable lost data time while RTO measures time to restore usable service.

Incorrect Answers

A:

A representative live migration completes with expected service continuity and the VM sees a supported processor feature set. This verifies the separate Protecting VM live migration compatibility across host generations situation rather than Translating business RTO and RPO into a recovery plan. The decisive outcome here is: A representative recovery reaches service within four hours and loses no more than the permitted fifteen minutes of data.

B:

Incident reports and service checks agree on actual restoration times and can support justified reliability improvements. This verifies the separate Choosing service MTTR metrics instead of optimistic incident closure labels situation rather than Translating business RTO and RPO into a recovery plan. The decisive outcome here is: A representative recovery reaches service within four hours and loses no more than the permitted fifteen minutes of data.

C:

The host reaches its permitted remote monitoring endpoint without routing isolated storage traffic over the management uplink. This verifies the separate Correcting a missing default gateway on a storage-management server situation rather than Translating business RTO and RPO into a recovery plan. The decisive outcome here is: A representative recovery reaches service within four hours and loses no more than the permitted fifteen minutes of data.

Question 398

A server administrator explains the technical behavior behind this situation: A payroll application has an agreed four-hour recovery time and fifteen-minute data-loss tolerance, but its plan schedules backups only nightly and assumes that meets both requirements. Which technical principle most directly explains the correct approach?

  1. Recovery duration metrics must track business service recovery rather than an intermediate technician action.
  2. Volume licenses still have measurable entitlement limits and reporting obligations despite bulk purchase agreements.
  3. RPO measures tolerable lost data time while RTO measures time to restore usable service.
  4. VM snapshots capture local point-in-time state but generally share failure domains with the source datastore.

Explanation

Correct Answer

C:

RPO measures tolerable lost data time while RTO measures time to restore usable service. This is the governing technical explanation for Translating business RTO and RPO into a recovery plan. Correct configuration: Align backup frequency, replication and restoration workflow with separately documented RPO and RTO goals using actual recovery tests. Observable outcome: A representative recovery reaches service within four hours and loses no more than the permitted fifteen minutes of data.

Incorrect Answers

A:

Recovery duration metrics must track business service recovery rather than an intermediate technician action. That principle describes Choosing service MTTR metrics instead of optimistic incident closure labels, not the mechanism that governs Translating business RTO and RPO into a recovery plan. The relevant principle is: RPO measures tolerable lost data time while RTO measures time to restore usable service.

B:

Volume licenses still have measurable entitlement limits and reporting obligations despite bulk purchase agreements. That principle describes Performing a volume-license true-up after VM growth, not the mechanism that governs Translating business RTO and RPO into a recovery plan. The relevant principle is: RPO measures tolerable lost data time while RTO measures time to restore usable service.

D:

VM snapshots capture local point-in-time state but generally share failure domains with the source datastore. That principle describes Distinguishing hypervisor snapshots from durable backups, not the mechanism that governs Translating business RTO and RPO into a recovery plan. The relevant principle is: RPO measures tolerable lost data time while RTO measures time to restore usable service.

Question 399

The server team omits a necessary safeguard. A payroll application has an agreed four-hour recovery time and fifteen-minute data-loss tolerance, but its plan schedules backups only nightly and assumes that meets both requirements. Which resulting operational or security exposure is the most direct?

  1. Incorrect MTTR claims hide repeated long customer outages and undermine capacity planning.
  2. Conflating the metrics can yield a fast but stale restore or a current backup that takes too long to recover.
  3. A stale reservation may reassign an address to the wrong device or break service discovery after maintenance.
  4. Skipping the HCL can produce missing boot disks or unsupported patches that strand a new server.

Explanation

Correct Answer

B:

Conflating the metrics can yield a fast but stale restore or a current backup that takes too long to recover. This is the central risk in Translating business RTO and RPO into a recovery plan. Appropriate safeguard: Align backup frequency, replication and restoration workflow with separately documented RPO and RTO goals using actual recovery tests. Evidence the safeguard works: A representative recovery reaches service within four hours and loses no more than the permitted fifteen minutes of data.

Incorrect Answers

A:

Incorrect MTTR claims hide repeated long customer outages and undermine capacity planning. This exposure applies to Choosing service MTTR metrics instead of optimistic incident closure labels, not the direct consequence of Translating business RTO and RPO into a recovery plan. The actual case-specific risk is: Conflating the metrics can yield a fast but stale restore or a current backup that takes too long to recover.

C:

A stale reservation may reassign an address to the wrong device or break service discovery after maintenance. This exposure applies to Separating IPv4 DHCP reservation from a MAC-address replacement, not the direct consequence of Translating business RTO and RPO into a recovery plan. The actual case-specific risk is: Conflating the metrics can yield a fast but stale restore or a current backup that takes too long to recover.

D:

Skipping the HCL can produce missing boot disks or unsupported patches that strand a new server. This exposure applies to Checking server OS HCL before boot-volume installation, not the direct consequence of Translating business RTO and RPO into a recovery plan. The actual case-specific risk is: Conflating the metrics can yield a fast but stale restore or a current backup that takes too long to recover.

Question 400

The server fault remains unresolved: A payroll application has an agreed four-hour recovery time and fifteen-minute data-loss tolerance, but its plan schedules backups only nightly and assumes that meets both requirements. Which evidence should be examined first to diagnose this particular issue?

  1. Inspect runbook storage dependencies, backup copy revision, access controls and recovery drill evidence.
  2. Inspect cluster event timestamps, health checks, failback thresholds and application reconnect logs.
  3. Inspect BIA, recovery objectives, backup timestamps, restore duration and drill results.
  4. Inspect snapshot chains, datastore usage, backup copies, application consistency and restore evidence.

Explanation

Correct Answer

C:

Inspect BIA, recovery objectives, backup timestamps, restore duration and drill results. These checks target the described failure in Translating business RTO and RPO into a recovery plan. Appropriate response: Align backup frequency, replication and restoration workflow with separately documented RPO and RTO goals using actual recovery tests. Success criteria: A representative recovery reaches service within four hours and loses no more than the permitted fifteen minutes of data.

Incorrect Answers

A:

Inspect runbook storage dependencies, backup copy revision, access controls and recovery drill evidence. Those checks investigate Preserving secured runbooks during a major identity outage instead of the Translating business RTO and RPO into a recovery plan failure. The focused investigation should be: Inspect BIA, recovery objectives, backup timestamps, restore duration and drill results.

B:

Inspect cluster event timestamps, health checks, failback thresholds and application reconnect logs. Those checks investigate Designing automatic failback to avoid unstable oscillation instead of the Translating business RTO and RPO into a recovery plan failure. The focused investigation should be: Inspect BIA, recovery objectives, backup timestamps, restore duration and drill results.

D:

Inspect snapshot chains, datastore usage, backup copies, application consistency and restore evidence. Those checks investigate Distinguishing hypervisor snapshots from durable backups instead of the Translating business RTO and RPO into a recovery plan failure. The focused investigation should be: Inspect BIA, recovery objectives, backup timestamps, restore duration and drill results.

CompTIA Server+ Certification Exam (SK0-005) Practice Tests

Purchase Individually

  • Premium File

    617 Questions & Answers
    Last Update: Nov 9, 2026

    $76.99
    $69.99
  • Training Course

    139 Lectures

    $43.99
    $39.99
  • Study Guide

    533 Pages

    $43.99
    $39.99

SPECIAL OFFER: GET 10% OFF
This is ONE TIME OFFER

You save
10%

Enter Your Email Address to Receive Your 10% Off Discount Code

SPECIAL OFFER: GET 10% OFF

You save
10%

Use Discount Code:

A confirmation link was sent to your e-mail.

Please check your mailbox for a message from support@examlabs.com and follow the directions.

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your email address below to get started with our interactive software demo of your free trial.

  • Realistic exam simulation and exam editor with preview functions
  • Whole exam in a single file with several different question types
  • Customizable exam-taking mode & detailed score reports