Microsoft AZ-120 is the active Azure for SAP Workloads Specialty exam. The archived ExamLabs URL contains “Beta Exam” in its title, reflecting an earlier stage of the program rather than its current status. Microsoft’s 2026 objective guide now provides the appropriate planning reference for SAP migration, infrastructure design, high availability, disaster recovery and operations on Azure.
AZ-120 today: active SAP on Azure architecture
AZ-120, Planning and Administering Azure for SAP Workloads, remains an active Microsoft assessment in November 2026. Its original launch as a beta exam is historical; the ExamLabs article’s old “Beta Exam” title should not be read as a current status claim. Microsoft published skills measured as of April 17, 2026, and the current Azure for SAP Workloads Specialty credential concerns planning, migration, infrastructure, availability and operations for SAP systems on Azure. An accurate guide uses that current issuer scope and avoids unsupported test-question, salary or score guarantees.
The role combines Azure infrastructure knowledge with an understanding of SAP workloads, especially SAP HANA, SAP NetWeaver and the SAP application landscape. A cloud engineer unfamiliar with SAP transaction behavior can make poor design decisions even when they understand Azure virtual machines. Conversely, an experienced SAP administrator needs cloud networking, identity, storage, operational monitoring and recovery skills. The exam’s job profile is therefore cross-disciplinary: the candidate must explain how an SAP system’s performance and business continuity requirements shape the underlying cloud architecture.
Microsoft’s 2026 study guide groups skills around migrating SAP workloads, designing infrastructure, designing high availability and disaster recovery, and maintaining SAP on Azure. The published proportions are guidance for an assessment version, not instructions for guessing live test items. Review the official objectives near the actual exam date and identify which responsibilities you have performed in practice. The related AZ-120 preparation context should complement, not override, the issuer’s current skills list.
Before writing a design, collect the existing SAP inventory: application and database components, versions and supported Azure deployment options, peak transaction volumes, storage and network requirements, licenses, maintenance windows and recovery objectives. Determine whether the migration is a lift-and-shift, an infrastructure modernization or a broader SAP transformation. Product support matrices and certified virtual-machine sizes matter; a superficially powerful VM does not become SAP-supported simply because it has enough memory.
Migration planning and capacity decisions
Sizing begins with observed demand and vendor-supported requirements rather than choosing an appealing instance family. SAP application servers, database nodes, batch services and integration components have different CPU, memory, I/O and latency profiles. SAP HANA in particular can be memory-intensive and depends on supported deployment combinations. Document baseline performance, planned growth and sizing evidence, and verify candidate Azure VM and storage configurations through current SAP and Microsoft support guidance before committing to procurement.
Network planning affects both migration and steady-state operations. SAP systems may communicate across application tiers, integrations, directory services, remote administrators and databases that are sensitive to latency. Map each connection and its security boundary. ExpressRoute or other hybrid connectivity may be appropriate for a large environment, but the choice must follow throughput, resilience, security and cost requirements. One network link is not a recovery plan; design alternate paths and test what happens when a route or edge device fails.
Data movement needs an explicit method and cutover plan. Moving a database backup, replicating changes and building an application-level migration do not have the same outage and rollback characteristics. Inventory the last synchronized state, the expected downtime, source-system freeze requirements and what prevents concurrent writes from diverging. Reconcile business data before allowing users onto the new environment. Migration success is not simply a completed storage transfer; SAP transactions, integrations, printing and scheduled processes need validation.
Consider organizational support and responsibility. An SAP on Azure deployment may involve Microsoft, SAP, a managed service provider, security staff and the application’s business owners. Define which team owns the database, guest OS, Azure platform, backup validation, performance tuning and incident escalation. An unclear responsibility matrix can delay recovery even when technical redundancy is present. RISE with SAP arrangements may shift some operational boundaries, but the exact agreement must be examined rather than assumed from the product name.
Infrastructure, storage and security controls
An SAP landscape commonly includes central services, application servers, database resources and management services. Placement decisions determine which parts can be horizontally scaled and which hold critical state. Choose fault domains deliberately, considering availability zones or availability sets where supported, service dependencies and component-level failover design. Distributing application servers while keeping a single critical central service unprotected may create an appearance of redundancy without meaningful end-to-end resilience.
Storage deserves workload-specific testing. HANA log and data volumes have different I/O requirements; SAP file shares and backup repositories have different access patterns and recovery rules. Use supported Azure disk or file-service configurations, verify performance against workload baselines and understand snapshot or backup consistency. A lower-cost tier that cannot sustain log writes or recovery speed can undermine the entire deployment. Keep storage design aligned with SAP support documentation and maintenance procedures.
Identity and network isolation should protect both administrators and applications. Enforce least privilege for Azure resource roles, use supported authentication for management tools, and restrict access to database and application ports. Secure hybrid connectivity without assuming that an encrypted network tunnel grants the caller authorization to every service. Separately log platform management actions and sensitive SAP operations. A security model should address secrets, backup access, patching windows and privileged emergency access.
Use infrastructure as code where it improves repeatability, but treat deployment definitions as an implementation of a reviewed SAP architecture. Bicep or other approved tools can capture virtual networks, VMs, storage and monitoring configuration, while special SAP and database installation tasks may need additional workflows. Validate a nonproduction design against supported SAP components and test rollback before using it for a production cutover. A successful resource deployment is not a proof that SAP application support and performance requirements were met.
High availability, disaster recovery and operations
High availability and disaster recovery solve different levels of failure. An application cluster may tolerate a server outage; a geographically separate recovery landscape may be needed for region-wide disruption. Define recovery time and recovery point objectives per business process. SAP ASCS/SCS, application tiers and HANA databases can require different mechanisms, monitoring and failover dependencies. A complete plan must account for the relationships among components, not just show two rectangles labeled primary and secondary.
SAP HANA system replication can participate in a supported HA or DR design, but it still requires correct platform integration, fencing or cluster controls where applicable, and documented recovery operations. Test both planned and unplanned failover, verify client reconnection and assess which transactions were committed. Backup remains necessary for logical corruption or accidental changes that replication may reproduce. A resilient architecture has a tested method to restore good data as well as to keep service available during selected host failures.
Monitoring should include infrastructure and SAP-specific signals. VM CPU alone cannot establish whether dialog response time, database log throughput, batch processing or application dependencies are healthy. Collect a baseline across peak business periods, compare after migration, and build alerts that identify actionable ownership. An overloaded network path, insufficient disk throughput or incorrectly sized HANA node may appear as a general SAP slowdown. Diagnostic work needs evidence across guest, storage, network and application layers.
Cost optimization must preserve certification and support constraints. An eligible committed compute discount or right-sized machine might reduce operating spend, but not if the selected size loses SAP certification or adequate peak capacity. Include replication, backup storage, network transfer, licensing and monitoring, not just virtual-machine hours. If batch systems are stopped or scaled on a schedule, confirm that the business process tolerates the schedule and that all relevant components can recover cleanly.
An evidence-driven AZ-120 study and lab sequence
Study the four current objective groups as an integrated project. Start by documenting an existing SAP landscape with assumptions, resource demand and migration constraints. Design a supported target architecture, including secure connectivity and storage. Explain the application and database recovery approach, then prepare an operations plan covering monitoring, backups, maintenance, troubleshooting and cost. This approach demonstrates how migration, infrastructure and resilience decisions influence each other.
Hands-on work should be performed only with permitted licenses, realistic test data and approved Azure resources. A small exercise can still be valuable without provisioning a large production-class SAP HANA database. Build the networking and identity foundation, deploy a suitable nonproduction server, configure monitoring and demonstrate a backup or restoration path. Use published reference architectures to evaluate components you cannot afford or are not authorized to install, and be explicit about what the lab did not test.
Use scenario questions that ask why a proposed migration fails a recovery objective, or which dependency prevents an application service from connecting to its database. An answer should reference the relevant SAP support constraints and infrastructure evidence. Avoid claiming a third-party question set contains live exam items. Read the current official guide before scheduling; the old “beta” language on this historical URL is not the state of Microsoft’s present exam.
The durable capability AZ-120 evaluates is deciding how an SAP workload can operate reliably on Azure while preserving business data and supported software configurations. A good candidate can defend sizing, migration, security, HA/DR and monitoring choices against measured requirements. Certification validates an area of competence; production readiness still depends on testing and on clearly assigned operational responsibilities.