Pass PMI CAPM Exam in First Attempt Easily
Real PMI CAPM Exam Questions, Accurate & Verified Answers As Experienced in the Actual Test!

Verified by experts
3 products

You save $69.98

CAPM Premium Bundle

  • Premium File 688 Questions & Answers
  • Last Update: Nov 11, 2026
  • Training Course 123 Lectures
  • Study Guide 719 Pages
$79.99 $149.97

Purchase Individually

  • Premium File

    688 Questions & Answers
    Last Update: Nov 11, 2026

    $76.99
    $69.99
  • Training Course

    123 Lectures

    $43.99
    $39.99
  • Study Guide

    719 Pages

    $43.99
    $39.99

Certified Associate in Project Management (PMI-100) CAPM Practice Test 25

Question 240

The project or product decision does not produce its expected result. A solar farm interconnection plan has approved technical requirements but engineers want to bypass the design review and start construction to gain two weeks. Which investigation should be prioritized to diagnose the problem?

  1. Inspect gate checklist, drawings, risk findings, authority signatures and planned follow-on tasks.
  2. Inspect integrated master schedule, critical handoffs, vendor dates and gate ownership.
  3. Inspect scope statement, acceptance list, WBS work packages and decomposition logic.
  4. Inspect EV and PV source definitions, status date, work completion evidence and baseline version.

Explanation

Correct Answer

A:

Inspect gate checklist, drawings, risk findings, authority signatures and planned follow-on tasks. These are the relevant initial evidence checks for Planning fixed deliverable reviews through stage gates. Intended action: Retain the planned design and safety review stage gate and obtain evidence-based authorization before commencing downstream work. Expected success condition: Construction starts after documented approval of the necessary electrical and environmental readiness criteria.

Incorrect Answers

B:

Inspect integrated master schedule, critical handoffs, vendor dates and gate ownership. This investigation primarily applies to Coordinating an integrated plan for a museum exhibit opening, not the current Planning fixed deliverable reviews through stage gates problem. Prioritize: Inspect gate checklist, drawings, risk findings, authority signatures and planned follow-on tasks.

C:

Inspect scope statement, acceptance list, WBS work packages and decomposition logic. This investigation primarily applies to Building a WBS around deliverables rather than organization names, not the current Planning fixed deliverable reviews through stage gates problem. Prioritize: Inspect gate checklist, drawings, risk findings, authority signatures and planned follow-on tasks.

D:

Inspect EV and PV source definitions, status date, work completion evidence and baseline version. This investigation primarily applies to Calculating negative schedule variance with earned value data, not the current Planning fixed deliverable reviews through stage gates problem. Prioritize: Inspect gate checklist, drawings, risk findings, authority signatures and planned follow-on tasks.

Question 241

An associate project management team faces this situation: A campus LAN upgrade has path A-B-D taking 4+6+3 days and path A-C-D taking 4+2+3 days, but the scheduler prioritizes the shorter branch for deadline protection. Which design or implementation action best addresses it?

  1. Calculate cost variance as EV minus AC, recording negative $13,000 and initiating variance analysis.
  2. Compute CPI as EV/AC=0.75 and explain that the team earns $0.75 of planned value per dollar spent.
  3. Identify A-B-D as the 13-day critical path and focus delay controls on its zero-float activities.
  4. Plan specialist staffing and approvals through functional managers while maintaining an integrated predictive deliverable schedule.

Explanation

Correct Answer

C:

Identify A-B-D as the 13-day critical path and focus delay controls on its zero-float activities. Technical reason: The critical path is the longest-duration logical path through a properly linked deterministic schedule network. Verify by: The network model reports 13 days for A-B-D versus 9 days for A-C-D under the stated finish-to-start assumptions. Deployment qualification: The illustrative calculation assumes no calendars, leads or resource constraints that alter network timing.

Incorrect Answers

A:

Calculate cost variance as EV minus AC, recording negative $13,000 and initiating variance analysis. This instead targets the different case Documenting cost variance from accepted construction work. The described Calculating the critical path of a campus network upgrade requirement specifically calls for Identify A-B-D as the 13-day critical path and focus delay controls on its zero-float activities.

B:

Compute CPI as EV/AC=0.75 and explain that the team earns $0.75 of planned value per dollar spent. This instead targets the different case Interpreting cost performance index on a software modernization. The described Calculating the critical path of a campus network upgrade requirement specifically calls for Identify A-B-D as the 13-day critical path and focus delay controls on its zero-float activities.

D:

Plan specialist staffing and approvals through functional managers while maintaining an integrated predictive deliverable schedule. This instead targets the different case Using organizational structure in a fixed defense procurement project. The described Calculating the critical path of a campus network upgrade requirement specifically calls for Identify A-B-D as the 13-day critical path and focus delay controls on its zero-float activities.

Question 242

During project acceptance review, the team must verify its proposed approach. A campus LAN upgrade has path A-B-D taking 4+6+3 days and path A-C-D taking 4+2+3 days, but the scheduler prioritizes the shorter branch for deadline protection. Which observed result is the most direct acceptance evidence?

  1. The network model reports 13 days for A-B-D versus 9 days for A-C-D under the stated finish-to-start assumptions.
  2. The issue has an owner and corrective path while revised authorized dates are traceable to a signed change decision.
  3. The status dashboard uses CPI=0.75 and records a cost efficiency concern supported by the measured values.
  4. All required installation and regulatory acceptance activities follow an approved predecessor schedule before restart.

Explanation

Correct Answer

A:

The network model reports 13 days for A-B-D versus 9 days for A-C-D under the stated finish-to-start assumptions. Recommended implementation: Identify A-B-D as the 13-day critical path and focus delay controls on its zero-float activities. Why the observation matters: The critical path is the longest-duration logical path through a properly linked deterministic schedule network.

Incorrect Answers

B:

The issue has an owner and corrective path while revised authorized dates are traceable to a signed change decision. That observation could confirm Maintaining a change and issue log after unexpected permit delay, not the current Calculating the critical path of a campus network upgrade case. For this case, the decisive observation is: The network model reports 13 days for A-B-D versus 9 days for A-C-D under the stated finish-to-start assumptions.

C:

The status dashboard uses CPI=0.75 and records a cost efficiency concern supported by the measured values. That observation could confirm Interpreting cost performance index on a software modernization, not the current Calculating the critical path of a campus network upgrade case. For this case, the decisive observation is: The network model reports 13 days for A-B-D versus 9 days for A-C-D under the stated finish-to-start assumptions.

D:

All required installation and regulatory acceptance activities follow an approved predecessor schedule before restart. That observation could confirm Selecting predictive delivery for a regulated factory retrofit, not the current Calculating the critical path of a campus network upgrade case. For this case, the decisive observation is: The network model reports 13 days for A-B-D versus 9 days for A-C-D under the stated finish-to-start assumptions.

Question 243

An associate project coordinator explains why the response works. A campus LAN upgrade has path A-B-D taking 4+6+3 days and path A-C-D taking 4+2+3 days, but the scheduler prioritizes the shorter branch for deadline protection. Which principle is most relevant to this case?

  1. The critical path is the longest-duration logical path through a properly linked deterministic schedule network.
  2. The cost performance index is the ratio of earned value to actual cost; values under one indicate unfavorable efficiency.
  3. A predictive scope baseline decomposes authorized deliverables into controlled planning and measurement components.
  4. Predictive planning can fit work whose deliverables and verification rules are stable and tightly constrained.

Explanation

Correct Answer

A:

The critical path is the longest-duration logical path through a properly linked deterministic schedule network. This mechanism explains Calculating the critical path of a campus network upgrade. Action: Identify A-B-D as the 13-day critical path and focus delay controls on its zero-float activities. Expected confirmation: The network model reports 13 days for A-B-D versus 9 days for A-C-D under the stated finish-to-start assumptions.

Incorrect Answers

B:

The cost performance index is the ratio of earned value to actual cost; values under one indicate unfavorable efficiency. This relates to Interpreting cost performance index on a software modernization. In the current Calculating the critical path of a campus network upgrade case the operative principle is: The critical path is the longest-duration logical path through a properly linked deterministic schedule network.

C:

A predictive scope baseline decomposes authorized deliverables into controlled planning and measurement components. This relates to Distinguishing scope baseline components in a public bridge replacement. In the current Calculating the critical path of a campus network upgrade case the operative principle is: The critical path is the longest-duration logical path through a properly linked deterministic schedule network.

D:

Predictive planning can fit work whose deliverables and verification rules are stable and tightly constrained. This relates to Selecting predictive delivery for a regulated factory retrofit. In the current Calculating the critical path of a campus network upgrade case the operative principle is: The critical path is the longest-duration logical path through a properly linked deterministic schedule network.

Question 244

The project team omits the necessary planned action or control. A campus LAN upgrade has path A-B-D taking 4+6+3 days and path A-C-D taking 4+2+3 days, but the scheduler prioritizes the shorter branch for deadline protection. Which resulting failure or risk is most directly relevant?

  1. A sign error can hide overspending and delay corrective cost decisions.
  2. Protecting a noncritical branch while ignoring B can delay the whole upgrade completion.
  3. Inverting the ratio can make cost overruns appear as budget wins.
  4. Bypassing review can create rework and safety exposure that outweighs apparent schedule savings.

Explanation

Correct Answer

B:

Protecting a noncritical branch while ignoring B can delay the whole upgrade completion. This is the direct exposure for Calculating the critical path of a campus network upgrade. Mitigate with: Identify A-B-D as the 13-day critical path and focus delay controls on its zero-float activities. Check success by: The network model reports 13 days for A-B-D versus 9 days for A-C-D under the stated finish-to-start assumptions.

Incorrect Answers

A:

A sign error can hide overspending and delay corrective cost decisions. This risk occurs in the different Documenting cost variance from accepted construction work situation. For the given Calculating the critical path of a campus network upgrade requirement, the directly relevant risk is: Protecting a noncritical branch while ignoring B can delay the whole upgrade completion.

C:

Inverting the ratio can make cost overruns appear as budget wins. This risk occurs in the different Interpreting cost performance index on a software modernization situation. For the given Calculating the critical path of a campus network upgrade requirement, the directly relevant risk is: Protecting a noncritical branch while ignoring B can delay the whole upgrade completion.

D:

Bypassing review can create rework and safety exposure that outweighs apparent schedule savings. This risk occurs in the different Planning fixed deliverable reviews through stage gates situation. For the given Calculating the critical path of a campus network upgrade requirement, the directly relevant risk is: Protecting a noncritical branch while ignoring B can delay the whole upgrade completion.

Question 245

The project or product decision does not produce its expected result. A campus LAN upgrade has path A-B-D taking 4+6+3 days and path A-C-D taking 4+2+3 days, but the scheduler prioritizes the shorter branch for deadline protection. Which investigation should be prioritized to diagnose the problem?

  1. Inspect charter, scope baseline, authorized schedule, procurement controls and work authorization records.
  2. Inspect predecessor logic, activity durations, total float and schedule network calculation.
  3. Inspect organizational chart, resource commitments, contracting roles and project authorization.
  4. Inspect gate checklist, drawings, risk findings, authority signatures and planned follow-on tasks.

Explanation

Correct Answer

B:

Inspect predecessor logic, activity durations, total float and schedule network calculation. These are the relevant initial evidence checks for Calculating the critical path of a campus network upgrade. Intended action: Identify A-B-D as the 13-day critical path and focus delay controls on its zero-float activities. Expected success condition: The network model reports 13 days for A-B-D versus 9 days for A-C-D under the stated finish-to-start assumptions.

Incorrect Answers

A:

Inspect charter, scope baseline, authorized schedule, procurement controls and work authorization records. This investigation primarily applies to Identifying process group activities during infrastructure planning, not the current Calculating the critical path of a campus network upgrade problem. Prioritize: Inspect predecessor logic, activity durations, total float and schedule network calculation.

C:

Inspect organizational chart, resource commitments, contracting roles and project authorization. This investigation primarily applies to Using organizational structure in a fixed defense procurement project, not the current Calculating the critical path of a campus network upgrade problem. Prioritize: Inspect predecessor logic, activity durations, total float and schedule network calculation.

D:

Inspect gate checklist, drawings, risk findings, authority signatures and planned follow-on tasks. This investigation primarily applies to Planning fixed deliverable reviews through stage gates, not the current Calculating the critical path of a campus network upgrade problem. Prioritize: Inspect predecessor logic, activity durations, total float and schedule network calculation.

Question 246

An associate project management team faces this situation: At a construction checkpoint a work package has earned value of $84,000 and planned value of $100,000; the report claims it is $16,000 ahead of schedule. Which design or implementation action best addresses it?

  1. Report schedule variance EV-PV=-$10,000 and cost variance EV-AC=-$20,000 as distinct corrective issues.
  2. Complete necessary planning artifacts and approvals before treating unverified field work as controlled execution.
  3. Calculate schedule variance as EV minus PV, giving negative $16,000, and evaluate corrective timing implications.
  4. Retain the planned design and safety review stage gate and obtain evidence-based authorization before commencing downstream work.

Explanation

Correct Answer

C:

Calculate schedule variance as EV minus PV, giving negative $16,000, and evaluate corrective timing implications. Technical reason: Earned value schedule variance measures the value of completed work compared with the value planned by that date. Verify by: The status report shows SV=-$16,000 and explains that earned progress is behind the time-phased plan. Deployment qualification: Earned value SV is measured in cost units and is not directly the number of days late.

Incorrect Answers

A:

Report schedule variance EV-PV=-$10,000 and cost variance EV-AC=-$20,000 as distinct corrective issues. This instead targets the different case Using a variance report to distinguish delay from cost overrun. The described Calculating negative schedule variance with earned value data requirement specifically calls for Calculate schedule variance as EV minus PV, giving negative $16,000, and evaluate corrective timing implications.

B:

Complete necessary planning artifacts and approvals before treating unverified field work as controlled execution. This instead targets the different case Identifying process group activities during infrastructure planning. The described Calculating negative schedule variance with earned value data requirement specifically calls for Calculate schedule variance as EV minus PV, giving negative $16,000, and evaluate corrective timing implications.

D:

Retain the planned design and safety review stage gate and obtain evidence-based authorization before commencing downstream work. This instead targets the different case Planning fixed deliverable reviews through stage gates. The described Calculating negative schedule variance with earned value data requirement specifically calls for Calculate schedule variance as EV minus PV, giving negative $16,000, and evaluate corrective timing implications.

Question 247

During project acceptance review, the team must verify its proposed approach. At a construction checkpoint a work package has earned value of $84,000 and planned value of $100,000; the report claims it is $16,000 ahead of schedule. Which observed result is the most direct acceptance evidence?

  1. The approved WBS, schedule and cost plan exist before routine progress and invoice control begins.
  2. Construction progress is mapped to defined deliverables and authorized work packages rather than only supplier invoices.
  3. All required installation and regulatory acceptance activities follow an approved predecessor schedule before restart.
  4. The status report shows SV=-$16,000 and explains that earned progress is behind the time-phased plan.

Explanation

Correct Answer

D:

The status report shows SV=-$16,000 and explains that earned progress is behind the time-phased plan. Recommended implementation: Calculate schedule variance as EV minus PV, giving negative $16,000, and evaluate corrective timing implications. Why the observation matters: Earned value schedule variance measures the value of completed work compared with the value planned by that date.

Incorrect Answers

A:

The approved WBS, schedule and cost plan exist before routine progress and invoice control begins. That observation could confirm Identifying process group activities during infrastructure planning, not the current Calculating negative schedule variance with earned value data case. For this case, the decisive observation is: The status report shows SV=-$16,000 and explains that earned progress is behind the time-phased plan.

B:

Construction progress is mapped to defined deliverables and authorized work packages rather than only supplier invoices. That observation could confirm Distinguishing scope baseline components in a public bridge replacement, not the current Calculating negative schedule variance with earned value data case. For this case, the decisive observation is: The status report shows SV=-$16,000 and explains that earned progress is behind the time-phased plan.

C:

All required installation and regulatory acceptance activities follow an approved predecessor schedule before restart. That observation could confirm Selecting predictive delivery for a regulated factory retrofit, not the current Calculating negative schedule variance with earned value data case. For this case, the decisive observation is: The status report shows SV=-$16,000 and explains that earned progress is behind the time-phased plan.

Question 248

An associate project coordinator explains why the response works. At a construction checkpoint a work package has earned value of $84,000 and planned value of $100,000; the report claims it is $16,000 ahead of schedule. Which principle is most relevant to this case?

  1. Earned value schedule variance measures the value of completed work compared with the value planned by that date.
  2. The cost performance index is the ratio of earned value to actual cost; values under one indicate unfavorable efficiency.
  3. Issue logs and change-control records preserve the distinction between operational problem resolution and baseline authorization.
  4. Predictive project controls use defined artifacts to substantiate progress, quality and contractual completion.

Explanation

Correct Answer

A:

Earned value schedule variance measures the value of completed work compared with the value planned by that date. This mechanism explains Calculating negative schedule variance with earned value data. Action: Calculate schedule variance as EV minus PV, giving negative $16,000, and evaluate corrective timing implications. Expected confirmation: The status report shows SV=-$16,000 and explains that earned progress is behind the time-phased plan.

Incorrect Answers

B:

The cost performance index is the ratio of earned value to actual cost; values under one indicate unfavorable efficiency. This relates to Interpreting cost performance index on a software modernization. In the current Calculating negative schedule variance with earned value data case the operative principle is: Earned value schedule variance measures the value of completed work compared with the value planned by that date.

C:

Issue logs and change-control records preserve the distinction between operational problem resolution and baseline authorization. This relates to Maintaining a change and issue log after unexpected permit delay. In the current Calculating negative schedule variance with earned value data case the operative principle is: Earned value schedule variance measures the value of completed work compared with the value planned by that date.

D:

Predictive project controls use defined artifacts to substantiate progress, quality and contractual completion. This relates to Controlling quality verification artifacts for a predictive supplier build. In the current Calculating negative schedule variance with earned value data case the operative principle is: Earned value schedule variance measures the value of completed work compared with the value planned by that date.

Question 249

The project team omits the necessary planned action or control. At a construction checkpoint a work package has earned value of $84,000 and planned value of $100,000; the report claims it is $16,000 ahead of schedule. Which resulting failure or risk is most directly relevant?

  1. One undifferentiated red flag can prompt the wrong corrective action or conceal an unfavorable cost trend.
  2. Reversing the sign can hide lateness and encourage an unjustified green delivery status.
  3. Quietly moving baseline dates can erase visible slippage and undermine auditability.
  4. Paying without acceptance evidence can reduce leverage to fix defective equipment.

Explanation

Correct Answer

B:

Reversing the sign can hide lateness and encourage an unjustified green delivery status. This is the direct exposure for Calculating negative schedule variance with earned value data. Mitigate with: Calculate schedule variance as EV minus PV, giving negative $16,000, and evaluate corrective timing implications. Check success by: The status report shows SV=-$16,000 and explains that earned progress is behind the time-phased plan.

Incorrect Answers

A:

One undifferentiated red flag can prompt the wrong corrective action or conceal an unfavorable cost trend. This risk occurs in the different Using a variance report to distinguish delay from cost overrun situation. For the given Calculating negative schedule variance with earned value data requirement, the directly relevant risk is: Reversing the sign can hide lateness and encourage an unjustified green delivery status.

C:

Quietly moving baseline dates can erase visible slippage and undermine auditability. This risk occurs in the different Separating a baseline control from an unapproved schedule estimate situation. For the given Calculating negative schedule variance with earned value data requirement, the directly relevant risk is: Reversing the sign can hide lateness and encourage an unjustified green delivery status.

D:

Paying without acceptance evidence can reduce leverage to fix defective equipment. This risk occurs in the different Controlling quality verification artifacts for a predictive supplier build situation. For the given Calculating negative schedule variance with earned value data requirement, the directly relevant risk is: Reversing the sign can hide lateness and encourage an unjustified green delivery status.

Question 250

The project or product decision does not produce its expected result. At a construction checkpoint a work package has earned value of $84,000 and planned value of $100,000; the report claims it is $16,000 ahead of schedule. Which investigation should be prioritized to diagnose the problem?

  1. Inspect EV and PV source definitions, status date, work completion evidence and baseline version.
  2. Inspect EV, PV, AC, baseline, actual invoices and progress verification.
  3. Inspect baseline archive, approved change requests, forecast dates and variance calculations.
  4. Inspect gate checklist, drawings, risk findings, authority signatures and planned follow-on tasks.

Explanation

Correct Answer

A:

Inspect EV and PV source definitions, status date, work completion evidence and baseline version. These are the relevant initial evidence checks for Calculating negative schedule variance with earned value data. Intended action: Calculate schedule variance as EV minus PV, giving negative $16,000, and evaluate corrective timing implications. Expected success condition: The status report shows SV=-$16,000 and explains that earned progress is behind the time-phased plan.

Incorrect Answers

B:

Inspect EV, PV, AC, baseline, actual invoices and progress verification. This investigation primarily applies to Using a variance report to distinguish delay from cost overrun, not the current Calculating negative schedule variance with earned value data problem. Prioritize: Inspect EV and PV source definitions, status date, work completion evidence and baseline version.

C:

Inspect baseline archive, approved change requests, forecast dates and variance calculations. This investigation primarily applies to Separating a baseline control from an unapproved schedule estimate, not the current Calculating negative schedule variance with earned value data problem. Prioritize: Inspect EV and PV source definitions, status date, work completion evidence and baseline version.

D:

Inspect gate checklist, drawings, risk findings, authority signatures and planned follow-on tasks. This investigation primarily applies to Planning fixed deliverable reviews through stage gates, not the current Calculating negative schedule variance with earned value data problem. Prioritize: Inspect EV and PV source definitions, status date, work completion evidence and baseline version.

Certified Associate in Project Management (PMI-100) (CAPM) Practice Tests

Purchase Individually

  • Premium File

    688 Questions & Answers
    Last Update: Nov 11, 2026

    $76.99
    $69.99
  • Training Course

    123 Lectures

    $43.99
    $39.99
  • Study Guide

    719 Pages

    $43.99
    $39.99

SPECIAL OFFER: GET 10% OFF
This is ONE TIME OFFER

You save
10%

Enter Your Email Address to Receive Your 10% Off Discount Code

SPECIAL OFFER: GET 10% OFF

You save
10%

Use Discount Code:

A confirmation link was sent to your e-mail.

Please check your mailbox for a message from support@examlabs.com and follow the directions.

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your email address below to get started with our interactive software demo of your free trial.

  • Realistic exam simulation and exam editor with preview functions
  • Whole exam in a single file with several different question types
  • Customizable exam-taking mode & detailed score reports